PREPARING ROW
|
STA
|
7.000
|
$3,000.000
|
$10,000.000
|
$7,680.000
|
$7,000.000
|
$40,000.000
|
$10,860.000
|
$7,985.143
|
|
|
REMOVING CONC (CURB)
|
LF
|
510.000
|
$2.310
|
$10.000
|
$2.850
|
$5.000
|
$5.000
|
$9.990
|
$3.920
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,070.000
|
$3.000
|
$10.000
|
$4.000
|
$5.000
|
$8.000
|
$9.990
|
$12.320
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,778.000
|
$14.000
|
$12.000
|
$9.300
|
$10.000
|
$8.000
|
$20.160
|
$10.696
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
21,677.000
|
$15.000
|
$11.000
|
$19.350
|
$15.000
|
$7.000
|
$19.800
|
$19.658
|
|
|
BLADING
|
HR
|
50.000
|
$100.000
|
$85.000
|
$67.100
|
$55.000
|
$100.000
|
$125.400
|
$115.472
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
17,702.000
|
$2.000
|
$0.170
|
$0.170
|
$0.300
|
$0.320
|
$0.320
|
$0.312
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
4,426.000
|
$2.000
|
$0.220
|
$0.210
|
$0.280
|
$0.320
|
$0.290
|
$0.291
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
4,426.000
|
$2.000
|
$0.220
|
$0.210
|
$0.280
|
$0.320
|
$0.290
|
$0.291
|
|
|
VEGETATIVE WATERING
|
MG
|
276.000
|
$40.000
|
$20.000
|
$27.000
|
$45.000
|
$23.000
|
$29.970
|
$33.360
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
2,654.000
|
$75.000
|
$68.000
|
$68.150
|
$73.000
|
$73.000
|
$81.250
|
$79.756
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
195.000
|
$175.000
|
$185.000
|
$165.250
|
$152.000
|
$168.000
|
$210.000
|
$167.200
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
12,357.000
|
$5.000
|
$3.000
|
$4.100
|
$3.000
|
$5.000
|
$3.190
|
$3.494
|
|
|
ASPH (RC-250)
|
GAL
|
2,305.000
|
$5.000
|
$6.000
|
$4.150
|
$5.000
|
$6.000
|
$4.180
|
$5.317
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
83.000
|
$132.000
|
$125.000
|
$185.750
|
$185.000
|
$254.000
|
$227.390
|
$175.917
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
136.000
|
$115.000
|
$125.000
|
$155.000
|
$155.000
|
$192.000
|
$231.290
|
$168.196
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
145.000
|
$115.000
|
$125.000
|
$134.200
|
$135.000
|
$142.000
|
$228.980
|
$128.962
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
11,018.000
|
$5.000
|
$5.000
|
$3.200
|
$3.500
|
$3.400
|
$5.430
|
$3.769
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
2,351.000
|
$95.000
|
$90.000
|
$90.900
|
$90.000
|
$94.000
|
$94.050
|
$87.864
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
1,499.000
|
$105.000
|
$95.000
|
$108.400
|
$106.000
|
$80.000
|
$97.200
|
$101.650
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
1,655.000
|
$95.000
|
$95.000
|
$103.300
|
$101.000
|
$84.000
|
$97.200
|
$94.208
|
|
|
TACK COAT
|
GAL
|
1,690.000
|
$4.000
|
$6.000
|
$2.550
|
$3.000
|
$3.000
|
$5.200
|
$3.890
|
|
|
CEM STABIL BKFL
|
CY
|
168.000
|
$80.000
|
$125.000
|
$145.000
|
$150.000
|
$225.000
|
$180.000
|
$94.869
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,909.000
|
$20.000
|
$30.000
|
$22.300
|
$48.000
|
$27.000
|
$20.000
|
$32.012
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,790.000
|
$220.000
|
$265.000
|
$268.250
|
$292.000
|
$281.000
|
$208.850
|
$326.801
|
|
|
CL C CONC (ABUT)
|
CY
|
68.000
|
$1,000.000
|
$950.000
|
$757.000
|
$1,100.000
|
$1,225.000
|
$1,000.000
|
$1,069.974
|
|
|
CL C CONC (CAP)
|
CY
|
41.200
|
$1,200.000
|
$950.000
|
$905.000
|
$1,100.000
|
$1,455.000
|
$1,000.000
|
$1,441.147
|
|
|
CL C CONC (COLUMN)
|
CY
|
48.500
|
$1,200.000
|
$950.000
|
$800.000
|
$950.000
|
$1,105.000
|
$1,000.000
|
$808.947
|
|
|
REINF CONC SLAB
|
SF
|
14,261.000
|
$18.000
|
$19.000
|
$17.450
|
$18.750
|
$20.500
|
$20.000
|
$18.901
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
1,851.240
|
$160.000
|
$165.000
|
$176.750
|
$160.000
|
$196.000
|
$150.000
|
$144.487
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
70.000
|
$400.000
|
$415.000
|
$450.000
|
$375.000
|
$550.000
|
$420.000
|
$517.368
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
582.000
|
$150.000
|
$125.000
|
$123.000
|
$200.000
|
$175.000
|
$225.000
|
$202.800
|
|
|
RAIL (TY T552)
|
LF
|
668.000
|
$120.000
|
$65.000
|
$86.500
|
$70.000
|
$86.000
|
$75.000
|
$83.740
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
91.000
|
$95.000
|
$115.000
|
$122.000
|
$110.000
|
$104.000
|
$150.000
|
$108.495
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
8.000
|
$200.000
|
$800.000
|
$655.000
|
$850.000
|
$285.000
|
$1,000.000
|
$862.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
1.000
|
$6,000.000
|
$4,500.000
|
$6,820.000
|
$7,000.000
|
$5,800.000
|
$4,500.000
|
$11,964.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$70,000.000
|
$75,000.000
|
$57,000.000
|
$60,000.000
|
$70,000.000
|
$100,000.000
|
$114,137.600
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$260,000.000
|
$325,000.000
|
$342,000.000
|
$360,000.000
|
$360,000.000
|
$368,906.730
|
$391,646.233
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$3,500.000
|
$3,500.000
|
$2,100.000
|
$2,000.000
|
$750.000
|
$7,500.000
|
$2,366.998
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
189.000
|
$35.000
|
$25.000
|
$23.600
|
$30.000
|
$28.000
|
$57.750
|
$27.040
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
189.000
|
$10.000
|
$10.000
|
$10.750
|
$10.000
|
$10.000
|
$10.500
|
$10.400
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
622.000
|
$3.000
|
$4.000
|
$3.550
|
$4.000
|
$5.500
|
$3.680
|
$3.640
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
622.000
|
$1.000
|
$2.000
|
$1.100
|
$1.500
|
$1.750
|
$1.580
|
$1.560
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,440.000
|
$35.000
|
$20.000
|
$18.450
|
$20.000
|
$20.000
|
$20.000
|
$33.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,200.000
|
$5.000
|
$10.000
|
$6.600
|
$12.000
|
$8.000
|
$20.000
|
$16.500
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,440.000
|
$10.000
|
$14.000
|
$11.500
|
$20.000
|
$10.000
|
$20.000
|
$27.500
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
94.000
|
$25.000
|
$25.000
|
$19.600
|
$32.000
|
$34.000
|
$48.180
|
$60.500
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
6,984.000
|
$0.250
|
$0.680
|
$0.900
|
$1.250
|
$1.500
|
$1.270
|
$0.645
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
3,492.000
|
$0.250
|
$0.950
|
$1.250
|
$1.250
|
$2.250
|
$1.790
|
$0.905
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
550.000
|
$25.000
|
$23.040
|
$22.200
|
$21.500
|
$23.500
|
$20.950
|
$24.034
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$1,850.000
|
$1,833.700
|
$2,700.000
|
$1,850.000
|
$1,860.000
|
$2,017.000
|
$2,164.900
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
925.000
|
$2.500
|
$2.200
|
$2.350
|
$2.250
|
$2.250
|
$2.000
|
$1.612
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,800.000
|
$3,129.500
|
$2,735.000
|
$2,650.000
|
$3,200.000
|
$2,845.000
|
$3,085.680
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
2.000
|
$1,650.000
|
$1,760.000
|
$1,550.000
|
$1,500.000
|
$1,780.000
|
$1,600.000
|
$1,621.360
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$220.000
|
$190.000
|
$185.000
|
$225.000
|
$200.000
|
$306.800
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,500.000
|
$800.000
|
$750.000
|
$1,500.000
|
$1,400.000
|
$1,259.540
|
$930.800
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$750.000
|
$750.000
|
$500.000
|
$1,000.000
|
$700.000
|
$630.160
|
$384.800
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,500.000
|
$7,250.000
|
$7,400.000
|
$6,500.000
|
$8,600.000
|
$7,750.000
|
$7,534.800
|
|
|
WIRE FENCE (TY A)
|
LF
|
366.000
|
$15.000
|
$15.000
|
$25.000
|
$10.000
|
$22.000
|
$19.000
|
$19.760
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$600.000
|
$594.480
|
$670.000
|
$600.000
|
$600.000
|
$540.440
|
$562.058
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
2.000
|
$400.000
|
$457.790
|
$670.000
|
$500.000
|
$465.000
|
$416.180
|
$432.827
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$85.000
|
$126.500
|
$150.000
|
$150.000
|
$128.000
|
$115.000
|
$119.600
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
80.000
|
$15.000
|
$14.850
|
$16.000
|
$25.000
|
$15.000
|
$13.500
|
$14.040
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
7.000
|
$20.000
|
$17.850
|
$100.000
|
$20.000
|
$18.000
|
$16.230
|
$16.879
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
36.000
|
$22.000
|
$18.650
|
$16.000
|
$20.000
|
$19.000
|
$16.950
|
$17.628
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
14,630.000
|
$1.000
|
$0.600
|
$0.650
|
$1.150
|
$0.670
|
$0.630
|
$0.655
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
15,210.000
|
$1.000
|
$0.600
|
$0.650
|
$1.150
|
$0.780
|
$0.630
|
$0.655
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
760.000
|
$2.000
|
$0.820
|
$2.750
|
$2.000
|
$1.000
|
$1.780
|
$1.782
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
9,504.000
|
$0.750
|
$0.820
|
$0.650
|
$0.630
|
$0.830
|
$0.630
|
$0.655
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
377.000
|
$0.750
|
$0.820
|
$0.650
|
$0.630
|
$1.110
|
$0.630
|
$0.655
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,110.000
|
$0.750
|
$0.820
|
$0.650
|
$0.630
|
$0.860
|
$0.630
|
$0.655
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
105.000
|
$5.000
|
$5.500
|
$12.500
|
$12.000
|
$13.500
|
$12.000
|
$12.480
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$8,500.000
|
$15,000.000
|
$5,550.000
|
$6,000.000
|
$7,800.000
|
$7,703.450
|
$12,100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$300.000
|
$300.000
|
$400.000
|
$300.000
|
$273.000
|
$359.490
|
$330.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$400.000
|
$300.000
|
$360.000
|
$750.000
|
$273.000
|
$513.560
|
$522.500
|
|
Totals: |
$3,445,865.250
|
$3,442,520.810
|
$3,543,248.930
|
$3,678,643.890
|
$3,747,695.060
|
$3,847,190.510
|
$3,951,729.960
|