|
|
PREPARING ROW
|
STA
|
4.000
|
$1,400.000
|
$1,371.960
|
$2,243.000
|
$7,107.680
|
$5,000.000
|
$2,500.000
|
$3,126.780
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,592.000
|
$8.000
|
$12.270
|
$8.100
|
$11.394
|
$17.750
|
$9.500
|
$11.200
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
3,088.000
|
$9.600
|
$15.420
|
$9.260
|
$14.631
|
$16.200
|
$13.000
|
$10.490
|
|
|
BLADING
|
HR
|
50.000
|
$75.000
|
$102.600
|
$125.000
|
$95.440
|
$65.000
|
$100.000
|
$133.220
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
11,200.000
|
$0.320
|
$0.230
|
$0.180
|
$0.187
|
$0.200
|
$0.250
|
$0.190
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,800.000
|
$0.200
|
$0.400
|
$0.300
|
$0.312
|
$0.320
|
$0.440
|
$0.300
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
2,800.000
|
$0.200
|
$0.400
|
$0.300
|
$0.312
|
$0.320
|
$0.440
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
93.700
|
$16.000
|
$18.930
|
$20.000
|
$32.360
|
$20.000
|
$50.000
|
$28.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
4,790.000
|
$52.000
|
$63.250
|
$62.690
|
$58.935
|
$56.000
|
$65.750
|
$67.750
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
15,489.000
|
$2.600
|
$3.420
|
$2.420
|
$2.328
|
$3.000
|
$4.500
|
$2.750
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
111.000
|
$128.000
|
$153.300
|
$145.000
|
$145.749
|
$180.000
|
$200.000
|
$221.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,650.000
|
$3.600
|
$4.060
|
$5.210
|
$4.237
|
$3.000
|
$4.000
|
$4.000
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
156.000
|
$64.000
|
$86.700
|
$132.570
|
$123.462
|
$225.000
|
$125.000
|
$127.000
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
168.000
|
$64.000
|
$86.700
|
$133.640
|
$94.722
|
$143.000
|
$125.000
|
$121.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
12,723.000
|
$2.400
|
$3.340
|
$4.060
|
$3.126
|
$2.750
|
$3.300
|
$2.800
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
100.000
|
$40.000
|
$65.510
|
$205.330
|
$99.188
|
$126.850
|
$55.000
|
$300.000
|
|
|
CEM STABIL BKFL
|
CY
|
12.000
|
$80.000
|
$190.870
|
$87.000
|
$130.000
|
$125.000
|
$500.000
|
$210.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
30.000
|
$12.000
|
$20.000
|
$160.000
|
$156.000
|
$150.000
|
$165.000
|
$215.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
20.000
|
$120.000
|
$255.000
|
$281.000
|
$265.200
|
$255.000
|
$275.000
|
$450.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
0.700
|
$400.000
|
$550.000
|
$1,200.000
|
$1,040.000
|
$1,000.000
|
$1,100.000
|
$1,100.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
32.000
|
$60.000
|
$180.000
|
$74.000
|
$67.600
|
$65.000
|
$70.000
|
$75.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
13.000
|
$280.000
|
$700.000
|
$590.000
|
$676.000
|
$650.000
|
$710.000
|
$550.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
14.000
|
$320.000
|
$900.000
|
$625.000
|
$884.000
|
$850.000
|
$925.000
|
$600.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$14,400.000
|
$12,000.000
|
$9,800.000
|
$14,560.000
|
$14,000.000
|
$15,250.000
|
$24,500.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$16,000.000
|
$16,000.000
|
$12,780.000
|
$17,680.000
|
$17,000.000
|
$18,500.000
|
$28,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
2.000
|
$4,000.000
|
$3,000.000
|
$5,800.000
|
$7,280.000
|
$7,000.000
|
$7,650.000
|
$16,250.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$1,000.000
|
$1,200.000
|
$2,100.000
|
$1,040.000
|
$1,000.000
|
$1,100.000
|
$1,200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$69,000.000
|
$120,863.950
|
$93,530.000
|
$128,327.866
|
$110,000.000
|
$134,500.000
|
$175,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$3,000.000
|
$2,348.810
|
$1,581.000
|
$6,671.198
|
$2,000.000
|
$2,450.000
|
$1,700.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
50.000
|
$40.000
|
$40.000
|
$40.000
|
$41.600
|
$40.000
|
$40.000
|
$43.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
50.000
|
$8.000
|
$11.000
|
$10.000
|
$11.440
|
$10.000
|
$10.000
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
300.000
|
$2.400
|
$4.000
|
$4.000
|
$4.160
|
$4.000
|
$4.250
|
$4.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
300.000
|
$1.600
|
$1.000
|
$3.000
|
$1.040
|
$3.000
|
$3.250
|
$3.250
|
|
|
INTERSECTIONS (ACP)
|
SY
|
800.000
|
$28.000
|
$43.980
|
$42.690
|
$19.721
|
$61.200
|
$55.000
|
$40.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
202.000
|
$56.000
|
$90.000
|
$130.500
|
$130.000
|
$125.000
|
$135.000
|
$95.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
531.000
|
$20.000
|
$30.660
|
$21.270
|
$37.163
|
$28.000
|
$50.000
|
$31.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
5,640.000
|
$0.200
|
$1.520
|
$0.850
|
$0.520
|
$1.000
|
$0.550
|
$0.850
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
10.000
|
$140.000
|
$125.000
|
$125.000
|
$130.000
|
$200.000
|
$265.000
|
$215.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
2.000
|
$2,000.000
|
$1,950.000
|
$1,200.000
|
$2,028.000
|
$2,100.000
|
$2,100.000
|
$2,850.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
285.000
|
$6.800
|
$11.000
|
$15.000
|
$11.440
|
$12.000
|
$12.000
|
$25.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
90.000
|
$9.600
|
$20.000
|
$18.000
|
$20.800
|
$22.000
|
$22.000
|
$70.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
375.000
|
$0.960
|
$2.350
|
$2.000
|
$2.444
|
$2.500
|
$2.550
|
$3.250
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
750.000
|
$1.000
|
$2.500
|
$2.500
|
$2.600
|
$2.650
|
$2.750
|
$3.250
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$480.000
|
$1,100.000
|
$1,000.000
|
$1,144.000
|
$1,250.000
|
$1,200.000
|
$1,500.000
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$240.000
|
$200.000
|
$300.000
|
$208.000
|
$225.000
|
$220.000
|
$275.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$360.000
|
$500.000
|
$500.000
|
$520.000
|
$510.000
|
$850.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$440.000
|
$540.000
|
$540.000
|
$561.600
|
$650.000
|
$850.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$600.000
|
$775.000
|
$775.000
|
$806.000
|
$1,000.000
|
$1,125.000
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
9.000
|
$300.000
|
$325.000
|
$325.000
|
$338.000
|
$425.000
|
$600.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
2.000
|
$340.000
|
$365.000
|
$365.000
|
$379.600
|
$520.000
|
$650.000
|
$550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
16.000
|
$44.000
|
$75.000
|
$75.000
|
$78.000
|
$125.000
|
$150.000
|
$75.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
6.000
|
$52.000
|
$55.000
|
$55.000
|
$57.200
|
$55.000
|
$90.000
|
$55.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
10,080.000
|
$0.180
|
$0.600
|
$0.600
|
$0.624
|
$0.650
|
$0.600
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
13,440.000
|
$0.180
|
$0.600
|
$0.600
|
$0.624
|
$0.650
|
$0.600
|
$0.650
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
672.000
|
$1.050
|
$1.780
|
$1.500
|
$1.516
|
$1.100
|
$1.000
|
$0.550
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
147.000
|
$1.000
|
$1.000
|
$1.000
|
$1.040
|
$1.100
|
$1.000
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
250.000
|
$0.900
|
$1.000
|
$1.000
|
$1.040
|
$1.100
|
$1.000
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
6,720.000
|
$0.400
|
$0.500
|
$0.500
|
$0.520
|
$0.520
|
$0.500
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
680.000
|
$0.350
|
$0.500
|
$0.500
|
$0.520
|
$0.520
|
$0.500
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
9,190.000
|
$0.350
|
$0.500
|
$0.500
|
$0.520
|
$0.520
|
$0.500
|
$0.550
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
50.000
|
$14.000
|
$12.000
|
$12.000
|
$12.480
|
$13.000
|
$12.000
|
$13.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$400.000
|
$210.000
|
$210.000
|
$218.400
|
$220.000
|
$210.000
|
$225.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
635.000
|
$11.000
|
$12.000
|
$12.000
|
$12.480
|
$13.000
|
$12.000
|
$13.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
26.000
|
$4.000
|
$5.000
|
$5.000
|
$5.200
|
$5.500
|
$5.000
|
$5.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
382.000
|
$4.000
|
$5.000
|
$5.000
|
$5.200
|
$5.100
|
$5.000
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,495.000
|
$0.360
|
$0.700
|
$0.700
|
$0.728
|
$0.750
|
$0.750
|
$1.750
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
3,403.000
|
$76.000
|
$80.370
|
$90.690
|
$84.684
|
$91.500
|
$88.000
|
$111.000
|
|
|
TACK COAT
|
GAL
|
896.000
|
$3.200
|
$3.060
|
$3.600
|
$2.697
|
$3.000
|
$3.000
|
$3.200
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$7,500.000
|
$10,000.000
|
$10,400.000
|
$8,000.000
|
$10,000.000
|
$5,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$240.000
|
$304.690
|
$500.000
|
$243.000
|
$500.000
|
$250.000
|
$270.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$400.000
|
$507.820
|
$250.000
|
$491.400
|
$250.000
|
$250.000
|
$27.000
|
|
Totals: |
$955,596.700
|
$1,216,444.861
|
$1,217,628.420
|
$1,252,876.270
|
$1,290,912.500
|
$1,345,305.900
|
$1,463,706.390
|