PREPARING ROW
|
STA
|
16.000
|
$3,500.000
|
$25,000.000
|
$63,000.000
|
$56,000.000
|
$39,062.500
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
14,096.000
|
$20.000
|
$19.000
|
$16.700
|
$22.000
|
$41.550
|
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
2,160.000
|
$20.000
|
$18.000
|
$18.780
|
$22.000
|
$41.550
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
14,607.000
|
$25.000
|
$23.000
|
$29.540
|
$45.000
|
$52.640
|
|
|
|
BLADING
|
HR
|
50.000
|
$100.000
|
$60.000
|
$138.950
|
$100.000
|
$83.120
|
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
634.000
|
$30.000
|
$17.000
|
$8.780
|
$15.000
|
$41.550
|
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
25,346.000
|
$2.000
|
$0.290
|
$0.290
|
$0.290
|
$0.240
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
6,337.000
|
$2.000
|
$0.260
|
$0.260
|
$0.260
|
$0.200
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
6,337.000
|
$2.000
|
$0.260
|
$0.260
|
$0.260
|
$0.200
|
|
|
|
VEGETATIVE WATERING
|
MG
|
215.000
|
$75.000
|
$80.000
|
$21.150
|
$40.000
|
$41.550
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
3,840.000
|
$1.500
|
$2.400
|
$2.400
|
$2.400
|
$2.820
|
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
2,620.700
|
$110.000
|
$123.000
|
$102.580
|
$123.000
|
$138.520
|
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
96.600
|
$295.000
|
$375.000
|
$317.420
|
$340.000
|
$332.450
|
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
6,086.000
|
$6.500
|
$7.000
|
$10.500
|
$10.700
|
$5.540
|
|
|
|
CEMENT
|
TON
|
58.700
|
$300.000
|
$250.000
|
$227.260
|
$275.000
|
$277.050
|
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
6,086.000
|
$7.000
|
$5.500
|
$4.780
|
$5.400
|
$4.980
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,294.000
|
$6.000
|
$6.000
|
$6.810
|
$5.000
|
$6.650
|
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
135.600
|
$450.000
|
$400.000
|
$457.730
|
$225.000
|
$166.230
|
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
33.800
|
$450.000
|
$405.000
|
$564.490
|
$350.000
|
$332.450
|
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
6,070.000
|
$9.500
|
$5.000
|
$5.340
|
$5.000
|
$6.650
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
100.000
|
$100.000
|
$295.000
|
$280.340
|
$200.000
|
$118.730
|
|
|
|
CEM STABIL BKFL
|
CY
|
182.000
|
$185.000
|
$200.000
|
$106.500
|
$280.000
|
$243.800
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,350.000
|
$80.000
|
$70.000
|
$35.020
|
$46.000
|
$37.060
|
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
655.000
|
$350.000
|
$270.000
|
$241.530
|
$347.000
|
$332.430
|
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
3,872.000
|
$420.000
|
$280.000
|
$365.840
|
$441.000
|
$416.590
|
|
|
|
CL C CONC (ABUT)
|
CY
|
67.800
|
$1,600.000
|
$2,800.000
|
$1,368.540
|
$1,800.000
|
$963.610
|
|
|
|
CL C CONC (CAP)
|
CY
|
224.400
|
$1,800.000
|
$2,500.000
|
$2,104.610
|
$2,000.000
|
$1,541.920
|
|
|
|
CL C CONC (COLUMN)
|
CY
|
183.300
|
$1,600.000
|
$2,500.000
|
$1,359.480
|
$1,500.000
|
$2,459.110
|
|
|
|
REINF CONC SLAB
|
SF
|
62,560.000
|
$26.000
|
$25.000
|
$25.470
|
$31.000
|
$24.380
|
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
8,124.000
|
$220.000
|
$187.000
|
$180.410
|
$196.000
|
$178.780
|
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
890.000
|
$220.000
|
$188.000
|
$166.530
|
$208.000
|
$265.270
|
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
2,768.000
|
$105.000
|
$70.000
|
$61.500
|
$104.000
|
$102.330
|
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
180.000
|
$220.000
|
$419.000
|
$254.790
|
$307.000
|
$217.200
|
|
|
|
SET (TY II) (18 IN) (HDPE) (6: 1) (P)
|
EA
|
4.000
|
$1,700.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
1.000
|
$800,000.000
|
$275,000.000
|
$500,000.000
|
$190,000.000
|
$362,924.630
|
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
1,236.000
|
$3.300
|
$10.000
|
$1.580
|
$4.000
|
$3.360
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,000,000.000
|
$800,000.000
|
$1,100,000.000
|
$1,200,000.000
|
$1,250,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$3,500.000
|
$5,000.000
|
$5,000.000
|
$10,000.000
|
$10,590.470
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
50.000
|
$40.000
|
$60.000
|
$60.000
|
$60.000
|
$94.190
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
50.000
|
$10.000
|
$12.500
|
$12.500
|
$13.000
|
$22.160
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,697.000
|
$4.500
|
$3.650
|
$3.650
|
$4.000
|
$4.710
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,697.000
|
$1.000
|
$0.500
|
$0.500
|
$0.500
|
$1.110
|
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,460.000
|
$60.000
|
$34.000
|
$34.400
|
$45.000
|
$68.430
|
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
960.000
|
$25.000
|
$14.000
|
$5.110
|
$18.000
|
$16.630
|
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,460.000
|
$18.000
|
$30.000
|
$11.350
|
$27.000
|
$16.630
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
310.000
|
$40.000
|
$47.700
|
$138.850
|
$77.000
|
$44.330
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
6,966.000
|
$1.000
|
$0.220
|
$0.460
|
$1.600
|
$0.550
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
3,483.000
|
$1.000
|
$0.330
|
$0.700
|
$1.900
|
$0.550
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
450.000
|
$30.000
|
$23.550
|
$23.550
|
$25.000
|
$41.210
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,300.000
|
$1,531.000
|
$1,530.420
|
$2,400.000
|
$2,135.660
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,650.000
|
$2.000
|
$2.150
|
$2.150
|
$2.400
|
$6.650
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$198.000
|
$221.000
|
$220.600
|
$190.000
|
$506.460
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$275.000
|
$221.000
|
$220.600
|
$260.000
|
$344.110
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,500.000
|
$2,639.220
|
$2,639.220
|
$3,100.000
|
$5,287.610
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,200.000
|
$752.000
|
$751.400
|
$2,000.000
|
$1,184.820
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,000.000
|
$452.000
|
$451.800
|
$1,200.000
|
$1,043.690
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$9,500.000
|
$7,641.000
|
$7,641.000
|
$10,000.000
|
$10,687.240
|
|
|
|
WIRE FENCE (TY A)
|
LF
|
1,258.000
|
$17.600
|
$12.000
|
$22.250
|
$18.000
|
$19.940
|
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
1.000
|
$275.000
|
$215.000
|
$205.000
|
$200.000
|
$480.860
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
3.000
|
$600.000
|
$334.000
|
$334.000
|
$400.000
|
$579.550
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
2.000
|
$600.000
|
$336.000
|
$336.000
|
$450.000
|
$571.600
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$110.000
|
$75.000
|
$75.000
|
$250.000
|
$110.820
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
210.000
|
$25.000
|
$18.000
|
$18.000
|
$19.000
|
$13.730
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
8.000
|
$25.000
|
$25.000
|
$25.000
|
$25.000
|
$13.880
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
30.000
|
$35.000
|
$28.000
|
$28.000
|
$29.000
|
$28.510
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
16,224.000
|
$1.000
|
$0.650
|
$0.650
|
$0.920
|
$1.220
|
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
19,372.000
|
$1.000
|
$0.650
|
$0.650
|
$0.920
|
$1.220
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
730.000
|
$2.000
|
$5.000
|
$1.500
|
$1.500
|
$2.440
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
54.000
|
$6.000
|
$7.000
|
$7.000
|
$10.000
|
$6.650
|
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
9,000.000
|
$1.000
|
$0.500
|
$9.000
|
$9.800
|
$3.780
|
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
1,866.900
|
$150.000
|
$150.230
|
$182.850
|
$134.000
|
$237.150
|
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
1,231.500
|
$170.000
|
$176.000
|
$182.850
|
$150.000
|
$249.340
|
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
1,886.800
|
$150.000
|
$155.000
|
$159.530
|
$150.000
|
$249.340
|
|
|
|
TACK COAT
|
GAL
|
2,666.000
|
$5.000
|
$5.000
|
$2.850
|
$4.000
|
$8.310
|
|
|
|
THERMO PIPE(18")(PP)(TY S)(TY II)
|
LF
|
67.000
|
$100.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
|
LF
|
8,719.000
|
$4.000
|
$3.850
|
$3.850
|
$4.200
|
$5.540
|
|
|
|
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
|
LF
|
8,719.000
|
$1.000
|
$0.500
|
$0.500
|
$0.540
|
$1.110
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$7,500.000
|
$10,417.440
|
$22,000.000
|
$17,420.380
|
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$9,000.000
|
$16,000.000
|
$10,000.000
|
$11,000.000
|
$16,622.500
|
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$300.000
|
$350.000
|
$683.280
|
$400.000
|
$239.920
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$300.000
|
$1,460.520
|
$1,086.240
|
$400.000
|
$1,079.630
|
|
|
|
HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MIL
|
LF
|
8,566.000
|
$1.000
|
$0.850
|
$0.850
|
$1.200
|
$0.980
|
|
|
|
HPPM-RIB W/RET REQ TYI(Y)6"(BRK)100MIL
|
LF
|
1,080.000
|
$1.000
|
$2.000
|
$2.000
|
$2.800
|
$0.980
|
|
|
|
PAVEMENT SEALER 6"
|
LF
|
3,060.000
|
$1.000
|
$0.450
|
$0.450
|
$0.640
|
$0.110
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
67.000
|
$100.000
|
$157.100
|
$137.380
|
$160.000
|
$99.950
|
|
2
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,700.000
|
$3,170.000
|
$1,769.690
|
$2,500.000
|
$3,158.280
|
|
Totals: |
$11,648,984.100
|
$10,488,202.657
|
$11,410,086.934
|
$12,599,793.160
|
$12,888,684.183
|