PREPARING ROW
|
STA
|
291.000
|
$1,200.000
|
$300.000
|
$195.000
|
$250.000
|
$900.000
|
$1,361.970
|
$500.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
17,383.000
|
$3.500
|
$2.400
|
$4.500
|
$5.000
|
$3.200
|
$2.980
|
$6.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
19,941.000
|
$11.000
|
$13.380
|
$15.850
|
$15.000
|
$12.500
|
$13.500
|
$13.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
2,840.000
|
$13.500
|
$9.000
|
$3.400
|
$10.000
|
$9.000
|
$13.500
|
$13.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
98,884.000
|
$1.000
|
$0.750
|
$0.140
|
$1.000
|
$0.750
|
$0.990
|
$1.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
98,884.000
|
$0.110
|
$0.140
|
$0.240
|
$0.120
|
$0.130
|
$0.230
|
$0.200
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
49,447.000
|
$0.150
|
$0.140
|
$0.400
|
$0.120
|
$0.090
|
$0.380
|
$0.150
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
49,437.000
|
$0.150
|
$0.140
|
$0.400
|
$0.120
|
$0.090
|
$0.380
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
1,984.000
|
$13.000
|
$25.000
|
$12.000
|
$12.000
|
$12.000
|
$19.980
|
$37.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
98,884.000
|
$1.250
|
$0.900
|
$0.760
|
$1.000
|
$1.140
|
$0.710
|
$1.250
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
20,480.000
|
$47.000
|
$55.420
|
$50.170
|
$58.000
|
$62.000
|
$61.300
|
$72.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
9,772.000
|
$5.000
|
$5.200
|
$4.000
|
$4.000
|
$3.400
|
$3.830
|
$4.820
|
|
|
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
|
TON
|
1,223.000
|
$65.000
|
$78.000
|
$95.400
|
$90.000
|
$90.000
|
$80.210
|
$112.230
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
13,419.000
|
$80.000
|
$63.500
|
$75.920
|
$65.000
|
$68.000
|
$68.120
|
$85.020
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
15,174.000
|
$75.000
|
$73.000
|
$78.000
|
$70.000
|
$73.000
|
$72.320
|
$96.360
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
628.000
|
$90.000
|
$98.500
|
$98.500
|
$95.000
|
$100.000
|
$114.500
|
$122.430
|
|
|
TOM - C (AGGREGATE) SAC - B
|
TON
|
9,279.000
|
$90.000
|
$98.500
|
$98.500
|
$95.000
|
$100.000
|
$114.500
|
$122.430
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
14,697.000
|
$30.000
|
$30.000
|
$27.260
|
$28.000
|
$31.000
|
$31.520
|
$40.810
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,289.000
|
$2.000
|
$3.000
|
$5.900
|
$5.000
|
$4.500
|
$4.660
|
$7.820
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,959.000
|
$27.000
|
$22.000
|
$47.870
|
$35.000
|
$47.000
|
$50.000
|
$32.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
67.000
|
$100.000
|
$145.000
|
$515.000
|
$350.000
|
$290.000
|
$700.000
|
$665.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
16.000
|
$143.000
|
$175.000
|
$1,000.000
|
$350.000
|
$600.000
|
$830.000
|
$802.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
43.000
|
$330.000
|
$502.000
|
$585.000
|
$500.000
|
$515.000
|
$700.000
|
$530.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
26.000
|
$123.000
|
$110.000
|
$213.000
|
$225.000
|
$250.000
|
$544.990
|
$202.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
468.000
|
$450.000
|
$378.000
|
$585.000
|
$500.000
|
$475.000
|
$540.000
|
$518.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
557.000
|
$158.000
|
$150.000
|
$130.000
|
$175.000
|
$100.000
|
$145.000
|
$156.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
48.000
|
$56.000
|
$60.000
|
$69.150
|
$60.000
|
$77.000
|
$80.000
|
$90.000
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
4.000
|
$103.000
|
$100.000
|
$213.000
|
$225.000
|
$395.000
|
$240.000
|
$400.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
18.000
|
$84.000
|
$120.000
|
$133.000
|
$150.000
|
$225.000
|
$150.000
|
$123.000
|
|
|
CMP (GAL STL 15 IN)
|
LF
|
104.000
|
$85.000
|
$50.000
|
$53.000
|
$75.000
|
$58.000
|
$110.000
|
$81.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
36.000
|
$179.000
|
$350.000
|
$452.000
|
$350.000
|
$350.000
|
$450.000
|
$274.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
22.000
|
$809.000
|
$500.000
|
$516.000
|
$750.000
|
$825.000
|
$1,050.000
|
$2,100.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
22.000
|
$801.000
|
$600.000
|
$623.000
|
$800.000
|
$1,000.000
|
$1,400.000
|
$2,050.000
|
|
|
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
|
LF
|
28.000
|
$1,250.000
|
$800.000
|
$900.000
|
$1,000.000
|
$1,600.000
|
$1,050.000
|
$1,400.000
|
|
|
CONC BOX CULV (3 FT X 4 FT)(EXTEND)
|
LF
|
14.000
|
$730.000
|
$500.000
|
$638.000
|
$750.000
|
$890.000
|
$850.000
|
$960.000
|
|
|
HEADWALL (CH - PW - A - 0) (DES= 3)
|
EA
|
7.000
|
$11,932.000
|
$4,590.000
|
$4,787.000
|
$5,000.000
|
$5,700.000
|
$2,600.000
|
$11,500.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
3.000
|
$8,490.000
|
$10,100.000
|
$10,638.000
|
$14,000.000
|
$13,000.000
|
$17,000.000
|
$19,600.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
5.000
|
$9,791.000
|
$12,000.000
|
$15,957.000
|
$20,000.000
|
$24,000.000
|
$20,000.000
|
$26,900.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
5.000
|
$12,250.000
|
$26,000.000
|
$21,276.000
|
$25,000.000
|
$19,000.000
|
$30,000.000
|
$34,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$18,500.000
|
$29,500.000
|
$29,800.000
|
$35,000.000
|
$29,500.000
|
$30,000.000
|
$43,600.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
5.000
|
$20,400.000
|
$31,500.000
|
$35,105.000
|
$36,000.000
|
$29,500.000
|
$42,000.000
|
$52,300.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(P)
|
EA
|
2.000
|
$6,663.000
|
$15,000.000
|
$9,042.000
|
$15,000.000
|
$8,900.000
|
$5,700.000
|
$14,100.000
|
|
|
SET (TY II) (15 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$734.000
|
$950.000
|
$900.000
|
$800.000
|
$1,370.000
|
$1,800.000
|
$1,530.000
|
|
|
SET (TY II) (18 IN) (CMP) (4: 1) (P)
|
EA
|
2.000
|
$914.000
|
$1,250.000
|
$957.000
|
$1,000.000
|
$1,400.000
|
$1,500.000
|
$1,600.000
|
|
|
SET (TY II) (36 IN) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$1,000.000
|
$3,650.000
|
$3,200.000
|
$2,500.000
|
$4,000.000
|
$4,000.000
|
$4,750.000
|
|
|
SET (TY II) (DES 3) (CMP) (4: 1) (C)
|
EA
|
1.000
|
$2,082.000
|
$3,000.000
|
$2,127.000
|
$1,500.000
|
$2,100.000
|
$1,500.000
|
$1,650.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$370.000
|
$700.000
|
$900.000
|
$550.000
|
$395.000
|
$1,200.000
|
$300.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
28.000
|
$1,354.000
|
$750.000
|
$1,070.000
|
$1,000.000
|
$1,550.000
|
$1,800.000
|
$1,200.000
|
|
|
REMOV STR (PIPE)
|
LF
|
168.000
|
$15.000
|
$30.000
|
$32.000
|
$17.000
|
$27.000
|
$40.000
|
$52.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$726,400.000
|
$530,774.000
|
$423,000.000
|
$800,000.000
|
$600,000.000
|
$900,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$6,000.000
|
$1,200.000
|
$5,900.000
|
$5,000.000
|
$1,600.000
|
$9,700.000
|
$2,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,610.000
|
$25.000
|
$34.000
|
$42.550
|
$25.000
|
$26.500
|
$28.810
|
$32.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,610.000
|
$8.000
|
$11.000
|
$13.500
|
$6.000
|
$7.400
|
$6.810
|
$17.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
20,900.000
|
$2.300
|
$1.900
|
$2.130
|
$2.500
|
$2.000
|
$2.000
|
$2.200
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
20,900.000
|
$0.700
|
$0.600
|
$0.500
|
$0.650
|
$0.500
|
$0.390
|
$0.300
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
630.000
|
$7.000
|
$50.000
|
$28.830
|
$20.000
|
$19.000
|
$33.000
|
$14.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
630.000
|
$4.150
|
$20.000
|
$14.000
|
$8.000
|
$5.500
|
$28.000
|
$14.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
630.000
|
$11.640
|
$20.000
|
$15.500
|
$17.000
|
$19.000
|
$28.000
|
$14.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,023.000
|
$36.000
|
$21.000
|
$31.000
|
$25.000
|
$45.000
|
$35.040
|
$32.000
|
|
|
TURNOUTS (ACP)
|
SY
|
297.000
|
$35.000
|
$65.000
|
$173.000
|
$60.000
|
$54.000
|
$39.420
|
$86.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
29,658.000
|
$0.300
|
$0.165
|
$0.200
|
$0.260
|
$0.280
|
$0.200
|
$0.150
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
5,412.500
|
$21.000
|
$21.450
|
$20.740
|
$25.000
|
$21.500
|
$18.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,500.000
|
$1,628.000
|
$1,900.000
|
$2,000.000
|
$2,000.000
|
$215.000
|
$2,150.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$950.000
|
$1,210.000
|
$1,200.000
|
$1,200.000
|
$1,125.000
|
$1,450.000
|
$1,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
520.000
|
$1.000
|
$2.100
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$6.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$125.000
|
$165.000
|
$160.000
|
$200.000
|
$150.000
|
$200.000
|
$175.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
62.000
|
$2,300.000
|
$2,733.500
|
$2,644.000
|
$2,800.000
|
$2,800.000
|
$2,100.000
|
$3,200.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
2.000
|
$1,650.000
|
$4,400.000
|
$2,200.000
|
$1,200.000
|
$950.000
|
$5,000.000
|
$3,800.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,500.000
|
$1,200.000
|
$1,200.000
|
$1,000.000
|
$680.000
|
$1,000.000
|
$3,800.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$750.000
|
$1,100.000
|
$950.000
|
$500.000
|
$950.000
|
$750.000
|
$2,100.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
17.000
|
$242.000
|
$222.430
|
$199.000
|
$160.000
|
$155.000
|
$250.000
|
$170.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
4.000
|
$242.000
|
$271.370
|
$223.000
|
$220.000
|
$212.000
|
$500.000
|
$230.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$342.000
|
$603.700
|
$400.000
|
$345.000
|
$340.000
|
$300.000
|
$370.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
24.000
|
$415.950
|
$603.350
|
$443.000
|
$460.000
|
$456.000
|
$450.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$559.290
|
$973.430
|
$530.000
|
$560.000
|
$557.000
|
$500.000
|
$610.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$74.900
|
$100.000
|
$98.000
|
$100.000
|
$100.000
|
$650.000
|
$110.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
108.000
|
$41.000
|
$71.500
|
$55.000
|
$50.000
|
$50.000
|
$75.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
100.000
|
$13.000
|
$22.000
|
$25.000
|
$20.000
|
$18.250
|
$15.000
|
$20.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
56,430.000
|
$0.550
|
$0.550
|
$0.520
|
$0.500
|
$0.330
|
$0.330
|
$0.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
665.000
|
$0.780
|
$1.150
|
$1.060
|
$1.000
|
$1.000
|
$1.000
|
$1.100
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$115.500
|
$550.000
|
$160.000
|
$150.000
|
$175.000
|
$175.000
|
$165.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
228.000
|
$2.500
|
$11.000
|
$3.400
|
$3.500
|
$4.000
|
$4.000
|
$3.500
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
14,023.000
|
$0.400
|
$0.350
|
$0.380
|
$0.360
|
$0.370
|
$0.370
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
333.000
|
$0.400
|
$0.350
|
$0.380
|
$0.360
|
$0.370
|
$0.370
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
60,616.000
|
$0.400
|
$0.350
|
$0.340
|
$0.320
|
$0.370
|
$0.370
|
$0.350
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
58,210.000
|
$0.750
|
$0.740
|
$0.680
|
$0.650
|
$0.750
|
$0.750
|
$0.700
|
|
REFL PAV MRKR TY I-C
|
EA
|
807.000
|
$3.140
|
$4.400
|
$4.000
|
$4.000
|
$3.100
|
$3.100
|
$4.100
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
687.000
|
$3.550
|
$6.000
|
$4.000
|
$4.000
|
$3.100
|
$3.100
|
$4.100
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
1.000
|
$9,000.000
|
$7,500.000
|
$21,000.000
|
$14,000.000
|
$14,000.000
|
$7,500.000
|
$7,600.000
|
|
|
TMA (STATIONARY)
|
DAY
|
60.000
|
$325.000
|
$280.000
|
$271.000
|
$275.000
|
$250.000
|
$175.000
|
$142.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
120.000
|
$30.000
|
$35.000
|
$50.000
|
$55.000
|
$25.000
|
$100.000
|
$75.000
|
|
Totals: |
$7,990,697.140
|
$7,577,299.425
|
$7,892,390.810
|
$8,142,777.520
|
$8,242,340.070
|
$9,118,213.340
|
$9,707,975.410
|