|
|
PREPARING ROW
|
STA
|
15.620
|
$8,500.000
|
$3,220.000
|
$90,927.133
|
$92,029.000
|
$3,977.610
|
$67,421.000
|
$107,933.990
|
$108,515.000
|
$6,875.000
|
$3,400.000
|
$46,807.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
390.000
|
$37.500
|
$16.500
|
$29.331
|
$13.240
|
$35.300
|
$23.150
|
$20.000
|
$12.630
|
$15.000
|
$25.000
|
$35.000
|
|
|
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
|
SY
|
208.000
|
$60.000
|
$15.500
|
$10.999
|
$4.450
|
$5.430
|
$14.380
|
$25.000
|
$12.630
|
$15.000
|
$20.000
|
$55.000
|
|
|
RMV (6") TRT/UNTRT BASE & ASPH PAV
|
SY
|
7,597.000
|
$25.000
|
$6.100
|
$7.085
|
$5.940
|
$4.740
|
$6.630
|
$8.300
|
$12.630
|
$15.000
|
$10.000
|
$9.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
12,259.900
|
$24.500
|
$15.000
|
$7.045
|
$11.200
|
$32.910
|
$39.420
|
$22.610
|
$30.820
|
$25.000
|
$30.000
|
$16.000
|
|
|
EMBANK (FNL)(OC)(TY B)
|
CY
|
13,172.100
|
$22.500
|
$16.900
|
$23.401
|
$4.210
|
$53.450
|
$70.360
|
$23.080
|
$30.820
|
$6.500
|
$12.000
|
$120.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
1,000.000
|
$3.000
|
$4.200
|
$2.933
|
$3.000
|
$8.860
|
$4.570
|
$18.000
|
$3.540
|
$10.000
|
$6.000
|
$16.000
|
|
|
BROADCAST SEED (PERM_RURAL_SAND)
|
SY
|
1,000.000
|
$2.800
|
$0.610
|
$0.733
|
$0.580
|
$0.650
|
$1.000
|
$2.000
|
$2.020
|
$0.580
|
$3.000
|
$0.580
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
|
SY
|
1,000.000
|
$1.700
|
$1.450
|
$1.649
|
$1.350
|
$1.500
|
$2.500
|
$3.000
|
$3.030
|
$1.350
|
$4.000
|
$1.350
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
53.000
|
$85.000
|
$324.000
|
$78.132
|
$118.630
|
$131.740
|
$175.480
|
$251.030
|
$74.360
|
$75.000
|
$175.000
|
$300.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 5)(FNAL POS)
|
CY
|
1,512.000
|
$85.000
|
$120.000
|
$44.676
|
$69.570
|
$74.940
|
$92.100
|
$104.730
|
$74.360
|
$100.000
|
$96.000
|
$150.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
1,336.000
|
$5.100
|
$5.300
|
$4.644
|
$5.550
|
$9.460
|
$4.750
|
$5.600
|
$4.800
|
$4.750
|
$9.500
|
$8.200
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
1,837.000
|
$125.000
|
$140.000
|
$135.521
|
$132.250
|
$103.190
|
$125.000
|
$132.250
|
$126.310
|
$125.000
|
$175.000
|
$133.760
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
735.000
|
$205.000
|
$189.000
|
$198.491
|
$172.600
|
$119.220
|
$169.000
|
$172.600
|
$170.780
|
$169.000
|
$240.000
|
$154.370
|
|
|
TACK COAT
|
GAL
|
1,203.000
|
$4.000
|
$4.650
|
$4.057
|
$6.400
|
$4.400
|
$4.150
|
$6.400
|
$4.190
|
$4.150
|
$9.500
|
$6.670
|
|
|
TOM-C PG76-22 SAC-A
|
TON
|
368.000
|
$310.000
|
$224.000
|
$195.545
|
$245.300
|
$163.130
|
$200.000
|
$245.300
|
$202.100
|
$200.000
|
$350.000
|
$205.340
|
|
|
PLAN & TEXT CONC PAV(0" TO 0.5")
|
SY
|
6,681.000
|
$5.000
|
$3.550
|
$3.893
|
$3.450
|
$1.660
|
$1.750
|
$6.000
|
$15.160
|
$4.000
|
$5.500
|
$4.030
|
|
|
PLANE ASPH CONC PAV(0" TO 0.5" MICRO)
|
SY
|
44.000
|
$0.250
|
$279.000
|
$244.431
|
$5.000
|
$2.880
|
$253.000
|
$25.000
|
$252.630
|
$4.000
|
$5.500
|
$10.350
|
|
|
CONC PVMT (CRCP)(HES) (11")
|
SY
|
400.000
|
$125.000
|
$165.000
|
$90.921
|
$126.170
|
$150.000
|
$154.630
|
$150.000
|
$107.370
|
$250.000
|
$235.000
|
$400.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
307.000
|
$250.000
|
$333.000
|
$98.750
|
$112.080
|
$145.000
|
$145.550
|
$284.650
|
$353.680
|
$50.000
|
$95.000
|
$172.720
|
|
|
CEM STABIL BKFL
|
CY
|
2,234.000
|
$260.000
|
$107.000
|
$138.199
|
$1.000
|
$105.000
|
$168.250
|
$160.890
|
$153.600
|
$75.000
|
$215.000
|
$156.330
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
810.000
|
$26.000
|
$19.100
|
$11.732
|
$2.110
|
$25.000
|
$9.900
|
$18.000
|
$27.280
|
$10.000
|
$30.000
|
$57.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
15,666.000
|
$32.000
|
$42.100
|
$37.909
|
$44.300
|
$43.500
|
$84.150
|
$39.900
|
$40.420
|
$95.000
|
$65.000
|
$85.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,575.000
|
$310.000
|
$320.000
|
$332.622
|
$219.070
|
$304.520
|
$228.130
|
$255.320
|
$276.680
|
$350.000
|
$565.000
|
$450.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
912.000
|
$395.000
|
$328.000
|
$385.934
|
$323.770
|
$451.610
|
$299.440
|
$297.430
|
$381.310
|
$575.000
|
$635.000
|
$620.000
|
|
|
CL B CONC (FLUME)
|
CY
|
18.000
|
$950.000
|
$845.000
|
$890.488
|
$488.830
|
$1,100.000
|
$996.630
|
$2,099.590
|
$1,247.970
|
$450.000
|
$1,600.000
|
$1,140.000
|
|
|
CL C CONC (ABUT)
|
CY
|
130.900
|
$1,340.000
|
$1,080.000
|
$1,041.656
|
$1,000.000
|
$1,600.000
|
$1,350.940
|
$1,357.790
|
$1,605.120
|
$1,800.000
|
$1,900.000
|
$1,200.000
|
|
|
CL C CONC (CAP)
|
CY
|
185.500
|
$1,650.000
|
$1,270.000
|
$1,165.066
|
$1,100.000
|
$1,500.000
|
$1,300.550
|
$1,450.190
|
$2,023.500
|
$1,775.000
|
$1,950.000
|
$1,500.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
125.500
|
$1,725.000
|
$1,160.000
|
$1,233.997
|
$1,200.000
|
$1,010.000
|
$1,049.060
|
$1,602.380
|
$1,864.120
|
$1,800.000
|
$1,800.000
|
$1,450.000
|
|
|
CL C CONC (CRASHWALL)
|
CY
|
228.800
|
$1,200.000
|
$1,010.000
|
$602.435
|
$964.580
|
$1,400.000
|
$1,080.290
|
$1,227.270
|
$887.470
|
$1,800.000
|
$1,500.000
|
$985.000
|
|
|
REINF CONC SLAB
|
SF
|
29,771.500
|
$28.000
|
$30.000
|
$17.758
|
$25.000
|
$29.000
|
$25.970
|
$27.860
|
$20.370
|
$50.000
|
$40.000
|
$41.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
4,104.000
|
$35.000
|
$13.900
|
$12.548
|
$12.110
|
$14.770
|
$24.550
|
$16.710
|
$10.310
|
$15.000
|
$20.000
|
$11.000
|
|
|
APPROACH SLAB
|
CY
|
534.400
|
$800.000
|
$733.000
|
$413.052
|
$500.000
|
$750.000
|
$577.050
|
$578.180
|
$853.140
|
$700.000
|
$850.000
|
$662.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
31,777.000
|
$90.000
|
$72.050
|
$90.604
|
$103.250
|
$99.260
|
$93.160
|
$97.920
|
$87.850
|
$120.000
|
$175.000
|
$150.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
1,092.000
|
$26.000
|
$36.000
|
$23.465
|
$30.000
|
$36.000
|
$61.170
|
$37.400
|
$39.160
|
$50.000
|
$97.000
|
$125.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,965.546
|
$200.000
|
$228.000
|
$179.073
|
$200.000
|
$190.000
|
$222.520
|
$206.640
|
$251.510
|
$265.000
|
$275.000
|
$300.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
25.000
|
$940.000
|
$721.000
|
$549.971
|
$765.640
|
$1,022.340
|
$556.640
|
$616.000
|
$1,243.930
|
$450.000
|
$850.000
|
$650.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
255.000
|
$760.000
|
$624.000
|
$405.954
|
$463.680
|
$787.200
|
$679.530
|
$625.000
|
$732.620
|
$450.000
|
$800.000
|
$695.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(8 IN)
|
CY
|
6.700
|
$280.000
|
$206.000
|
$196.156
|
$303.130
|
$318.790
|
$427.790
|
$280.000
|
$282.940
|
$550.000
|
$250.000
|
$395.000
|
|
|
ELASTOMERIC BEARING (EE6)
|
EA
|
11.000
|
$3,100.000
|
$3,060.000
|
$1,844.970
|
$2,253.050
|
$2,500.000
|
$2,688.710
|
$2,887.000
|
$2,526.260
|
$4,500.000
|
$3,750.000
|
$3,000.000
|
|
|
ELASTOMERIC BEARING (EF6)
|
EA
|
11.000
|
$4,800.000
|
$3,060.000
|
$1,844.970
|
$2,253.050
|
$2,500.000
|
$2,688.710
|
$2,377.000
|
$2,526.260
|
$4,500.000
|
$3,750.000
|
$3,000.000
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
901,135.300
|
$2.400
|
$2.670
|
$2.409
|
$2.200
|
$2.910
|
$2.410
|
$2.460
|
$2.710
|
$3.500
|
$2.500
|
$3.050
|
|
|
STR STEEL (MISC NON-BRIDGE)
|
LB
|
1,043.800
|
$25.000
|
$22.500
|
$14.665
|
$29.590
|
$28.130
|
$21.940
|
$24.710
|
$10.610
|
$40.000
|
$30.000
|
$15.000
|
|
|
RAIL (TY T221)
|
LF
|
342.000
|
$250.000
|
$87.500
|
$171.413
|
$89.940
|
$77.300
|
$96.640
|
$153.090
|
$103.410
|
$75.000
|
$77.000
|
$208.000
|
|
|
RAIL (TY C221)
|
LF
|
1,242.000
|
$185.000
|
$114.000
|
$178.734
|
$117.910
|
$109.430
|
$120.600
|
$176.030
|
$302.660
|
$145.000
|
$172.000
|
$122.000
|
|
|
RAIL (CLF-RO)
|
LF
|
313.700
|
$162.000
|
$79.900
|
$123.193
|
$90.000
|
$92.700
|
$134.120
|
$180.000
|
$116.210
|
$100.000
|
$144.000
|
$130.000
|
|
|
RAIL (CLF-RO)(MOD)
|
LF
|
300.200
|
$162.000
|
$81.300
|
$124.660
|
$110.000
|
$113.300
|
$140.980
|
$250.000
|
$122.270
|
$150.000
|
$151.000
|
$152.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
579.444
|
$225.000
|
$241.000
|
$163.195
|
$200.670
|
$225.000
|
$199.480
|
$212.650
|
$202.100
|
$265.000
|
$255.000
|
$250.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
87.000
|
$375.000
|
$336.000
|
$420.178
|
$453.400
|
$350.000
|
$318.810
|
$530.710
|
$573.000
|
$650.000
|
$1,240.000
|
$1,400.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
728.000
|
$120.000
|
$85.900
|
$141.260
|
$79.590
|
$170.000
|
$102.480
|
$106.100
|
$164.030
|
$150.000
|
$263.000
|
$180.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
1.000
|
$10,000.000
|
$8,180.000
|
$8,799.543
|
$6,647.110
|
$14,000.000
|
$5,704.640
|
$8,250.210
|
$6,745.120
|
$16,000.000
|
$15,250.000
|
$11,780.000
|
|
|
INLET (COMPL)(PCO)(5FT)(RIGHT)
|
EA
|
1.000
|
$23,000.000
|
$12,100.000
|
$6,874.643
|
$9,442.650
|
$17,000.000
|
$12,138.500
|
$11,566.660
|
$10,585.040
|
$13,000.000
|
$16,100.000
|
$19,708.000
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
2.000
|
$9,900.000
|
$8,800.000
|
$7,097.748
|
$6,438.750
|
$13,000.000
|
$9,189.410
|
$8,819.260
|
$7,553.520
|
$12,000.000
|
$13,300.000
|
$11,525.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
2.000
|
$11,700.000
|
$10,200.000
|
$8,555.114
|
$12,264.810
|
$7,500.000
|
$23,203.810
|
$15,000.000
|
$21,220.610
|
$13,900.000
|
$12,500.000
|
$12,056.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,200.000
|
$2,000.000
|
$1,568.518
|
$1,448.070
|
$2,800.000
|
$1,303.410
|
$2,882.030
|
$2,526.260
|
$2,600.000
|
$6,000.000
|
$4,800.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
6.000
|
$1,750.000
|
$313.000
|
$1,569.035
|
$1,573.490
|
$1,100.000
|
$1,402.470
|
$2,250.000
|
$2,652.580
|
$1,000.000
|
$200.000
|
$2,050.000
|
|
|
REMOV STR (PIPE)
|
LF
|
255.000
|
$46.000
|
$21.300
|
$23.025
|
$59.950
|
$13.000
|
$31.120
|
$33.830
|
$35.370
|
$30.000
|
$35.000
|
$80.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$150,000.000
|
$260,000.000
|
$239,738.674
|
$337,273.170
|
$325,000.000
|
$192,933.460
|
$274,038.680
|
$301,181.020
|
$350,000.000
|
$404,550.000
|
$600,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,193,579.940
|
$1,020,000.000
|
$1,427,454.966
|
$1,437,500.000
|
$1,205,522.930
|
$827,833.300
|
$1,815,232.980
|
$1,525,000.000
|
$550,000.000
|
$1,750,000.000
|
$2,258,600.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$9,250.000
|
$12,900.000
|
$3,666.476
|
$6,800.000
|
$6,058.740
|
$7,106.370
|
$15,000.000
|
$7,326.160
|
$9,950.000
|
$21,300.000
|
$40,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
1.000
|
$8,000.000
|
$20,300.000
|
$7,048.529
|
$15,909.330
|
$7,740.380
|
$14,657.820
|
$5,384.070
|
$20,210.100
|
$25,000.000
|
$21,700.000
|
$27,800.000
|
|
|
TMA (STATIONARY)
|
DAY
|
162.000
|
$225.000
|
$285.000
|
$162.989
|
$350.000
|
$180.610
|
$786.940
|
$500.000
|
$1,010.510
|
$250.000
|
$325.000
|
$162.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,655.000
|
$4.500
|
$3.150
|
$3.351
|
$3.000
|
$3.340
|
$4.250
|
$3.600
|
$3.640
|
$3.000
|
$5.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,655.000
|
$1.800
|
$1.050
|
$1.011
|
$1.000
|
$1.110
|
$1.250
|
$1.200
|
$1.210
|
$1.000
|
$1.500
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
60.000
|
$8.900
|
$5.800
|
$5.536
|
$5.500
|
$6.130
|
$6.000
|
$10.000
|
$10.110
|
$5.500
|
$10.000
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
60.000
|
$3.000
|
$1.050
|
$1.466
|
$1.000
|
$1.110
|
$1.000
|
$2.500
|
$5.050
|
$1.000
|
$5.000
|
$1.000
|
|
|
PCTB (FUR&INST)(F-SHAPE OR SNGL SLP)TY1
|
LF
|
1,092.000
|
$50.000
|
$19.000
|
$53.556
|
$25.580
|
$65.000
|
$47.380
|
$100.000
|
$62.650
|
$80.000
|
$95.000
|
$200.000
|
|
|
PCTB (MOVE)(F-SHAPE OR SNGL SLP)TY1
|
LF
|
480.000
|
$25.000
|
$8.600
|
$17.379
|
$12.970
|
$34.000
|
$19.180
|
$35.000
|
$7.070
|
$40.000
|
$35.000
|
$80.000
|
|
|
PCTB (REMOVE)(F-SHAPE OR SNGL SLP)TY1
|
LF
|
1,092.000
|
$26.000
|
$19.900
|
$21.778
|
$13.320
|
$45.000
|
$13.000
|
$30.000
|
$12.130
|
$20.000
|
$20.000
|
$10.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,176.000
|
$70.000
|
$41.200
|
$45.830
|
$48.380
|
$45.440
|
$40.070
|
$35.000
|
$9.090
|
$50.000
|
$50.000
|
$38.600
|
|
|
DRIVEWAYS (CONC)
|
SY
|
321.000
|
$125.000
|
$88.100
|
$87.995
|
$179.930
|
$106.780
|
$95.350
|
$125.000
|
$116.210
|
$120.000
|
$185.000
|
$300.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
948.000
|
$85.000
|
$40.000
|
$134.644
|
$47.990
|
$96.550
|
$76.250
|
$106.320
|
$96.250
|
$110.000
|
$135.000
|
$300.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$3,370.000
|
$2,430.000
|
$2,493.203
|
$1,784.860
|
$2,385.460
|
$2,865.670
|
$5,000.000
|
$3,905.600
|
$2,100.000
|
$3,900.000
|
$1,730.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
729.000
|
$25.000
|
$29.500
|
$21.038
|
$26.000
|
$26.780
|
$23.000
|
$26.000
|
$27.740
|
$26.500
|
$35.000
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,400.000
|
$2,600.000
|
$1,833.238
|
$2,000.000
|
$2,060.000
|
$1,550.000
|
$2,000.000
|
$2,005.850
|
$2,150.000
|
$2,500.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
767.000
|
$4.500
|
$0.620
|
$2.361
|
$0.550
|
$0.570
|
$3.000
|
$0.550
|
$3.030
|
$3.000
|
$4.000
|
$5.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$325.000
|
$283.000
|
$202.022
|
$250.000
|
$257.500
|
$200.000
|
$250.000
|
$222.310
|
$350.000
|
$275.000
|
$150.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,500.000
|
$3,630.000
|
$2,443.002
|
$3,200.000
|
$3,296.000
|
$3,000.000
|
$3,200.000
|
$3,016.360
|
$3,150.000
|
$3,750.000
|
$3,200.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$345.000
|
$227.000
|
$234.654
|
$200.000
|
$206.000
|
$200.000
|
$200.000
|
$333.470
|
$200.000
|
$415.000
|
$275.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,600.000
|
$2,830.000
|
$1,206.270
|
$2,500.000
|
$2,575.000
|
$3,000.000
|
$2,500.000
|
$3,031.520
|
$4,000.000
|
$3,150.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,100.000
|
$2,270.000
|
$733.295
|
$2,500.000
|
$2,060.000
|
$1,000.000
|
$2,000.000
|
$1,040.820
|
$1,850.000
|
$1,700.000
|
$575.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$12,000.000
|
$31,700.000
|
$23,465.449
|
$28,000.000
|
$28,840.000
|
$28,400.000
|
$28,000.000
|
$31,876.380
|
$29,000.000
|
$34,500.000
|
$28,000.000
|
|
|
PIPE UNDERDRAINS (TY 6)(8")
|
LF
|
1,927.000
|
$45.000
|
$26.300
|
$7.912
|
$26.220
|
$41.900
|
$32.060
|
$15.000
|
$7.170
|
$55.000
|
$79.500
|
$14.000
|
|
|
REMOVE RD IL ASM (BRIDGE MOUNT)
|
EA
|
4.000
|
$200.000
|
$1,060.000
|
$1,539.920
|
$750.000
|
$937.000
|
$900.000
|
$490.000
|
$946.840
|
$1,000.000
|
$2,000.000
|
$1,000.000
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
20.000
|
$1,600.000
|
$1,200.000
|
$1,036.390
|
$1,060.000
|
$1,651.880
|
$1,060.000
|
$1,060.000
|
$1,669.230
|
$1,060.000
|
$1,325.000
|
$1,060.000
|
|
|
IN RD IL (TY SA) 40B-8 (250W EQ) LED
|
EA
|
4.000
|
$1,450.000
|
$5,090.000
|
$4,399.771
|
$4,500.000
|
$5,062.990
|
$4,500.000
|
$4,500.000
|
$5,116.180
|
$4,500.000
|
$5,625.000
|
$4,500.000
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
415.000
|
$38.000
|
$25.400
|
$21.949
|
$22.450
|
$23.040
|
$22.450
|
$22.450
|
$23.280
|
$22.450
|
$28.000
|
$22.450
|
|
|
CONDT (RM) (3/4")
|
LF
|
2,375.000
|
$22.000
|
$16.200
|
$13.981
|
$14.300
|
$21.990
|
$14.300
|
$14.300
|
$22.220
|
$14.300
|
$18.000
|
$14.300
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,955.000
|
$2.000
|
$1.350
|
$1.173
|
$1.200
|
$2.550
|
$1.200
|
$1.200
|
$2.580
|
$1.200
|
$1.500
|
$1.200
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
11,100.000
|
$2.100
|
$1.600
|
$1.398
|
$1.430
|
$3.020
|
$1.430
|
$1.430
|
$3.050
|
$1.430
|
$1.750
|
$1.430
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
2.000
|
$1,600.000
|
$2,440.000
|
$2,107.001
|
$2,155.000
|
$1,373.320
|
$2,155.000
|
$2,155.000
|
$1,387.750
|
$2,255.000
|
$2,700.000
|
$2,155.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$6,700.000
|
$7,350.000
|
$6,355.225
|
$6,500.000
|
$7,560.620
|
$6,500.000
|
$6,500.000
|
$7,640.040
|
$6,500.000
|
$8,125.000
|
$6,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
5.000
|
$900.000
|
$351.000
|
$733.295
|
$332.000
|
$341.960
|
$670.000
|
$332.000
|
$677.040
|
$750.000
|
$835.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$900.000
|
$438.000
|
$928.840
|
$415.000
|
$427.450
|
$855.000
|
$415.000
|
$863.980
|
$950.000
|
$1,075.000
|
$945.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,200.000
|
$517.000
|
$977.727
|
$490.000
|
$504.700
|
$1,075.000
|
$490.000
|
$1,086.290
|
$1,000.000
|
$1,350.000
|
$1,110.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$150.000
|
$158.000
|
$97.772
|
$150.000
|
$154.500
|
$110.000
|
$150.000
|
$111.160
|
$100.000
|
$135.000
|
$150.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GF2(BI)
|
EA
|
8.000
|
$24.000
|
$37.000
|
$48.886
|
$35.000
|
$36.050
|
$30.000
|
$35.000
|
$30.320
|
$35.000
|
$37.500
|
$35.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
|
EA
|
16.000
|
$35.000
|
$21.100
|
$29.331
|
$20.000
|
$20.600
|
$24.500
|
$20.000
|
$24.760
|
$28.500
|
$31.000
|
$8.950
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
120.000
|
$1.000
|
$17.400
|
$2.933
|
$3.000
|
$10.600
|
$3.000
|
$16.500
|
$16.670
|
$16.500
|
$20.000
|
$3.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
11.000
|
$7.000
|
$34.800
|
$19.554
|
$20.000
|
$25.000
|
$20.000
|
$33.000
|
$33.350
|
$33.000
|
$41.000
|
$20.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
3.000
|
$90.000
|
$211.000
|
$342.204
|
$350.000
|
$520.000
|
$350.000
|
$200.000
|
$202.100
|
$200.000
|
$250.000
|
$350.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
22.000
|
$17.000
|
$37.000
|
$19.554
|
$20.000
|
$25.000
|
$20.000
|
$35.000
|
$35.370
|
$35.000
|
$44.000
|
$20.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
1,383.000
|
$0.850
|
$2.650
|
$2.199
|
$2.250
|
$7.000
|
$2.250
|
$2.500
|
$2.530
|
$2.500
|
$3.000
|
$2.250
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
113.000
|
$1.750
|
$4.200
|
$3.422
|
$3.500
|
$2.500
|
$3.500
|
$4.000
|
$4.040
|
$4.000
|
$5.000
|
$3.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
38.000
|
$11.000
|
$14.800
|
$14.665
|
$15.000
|
$10.600
|
$15.000
|
$14.000
|
$14.150
|
$14.000
|
$17.500
|
$15.000
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
2,680.000
|
$0.850
|
$1.600
|
$0.733
|
$0.750
|
$1.600
|
$0.750
|
$1.500
|
$1.520
|
$1.500
|
$2.000
|
$0.750
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
670.000
|
$1.000
|
$3.150
|
$1.955
|
$2.000
|
$1.600
|
$2.000
|
$3.000
|
$3.030
|
$3.000
|
$3.750
|
$2.000
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
670.000
|
$0.700
|
$3.150
|
$1.955
|
$2.000
|
$1.600
|
$2.000
|
$3.000
|
$3.030
|
$3.000
|
$3.750
|
$2.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
2,680.000
|
$1.000
|
$3.150
|
$1.466
|
$1.500
|
$1.600
|
$1.500
|
$3.000
|
$3.030
|
$3.000
|
$3.750
|
$1.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
34.000
|
$7.000
|
$7.700
|
$4.644
|
$4.750
|
$10.600
|
$4.750
|
$7.250
|
$7.330
|
$7.250
|
$9.000
|
$4.750
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
68.000
|
$7.500
|
$7.700
|
$4.644
|
$4.750
|
$10.600
|
$4.750
|
$7.250
|
$7.330
|
$7.250
|
$9.000
|
$4.750
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
2,952.000
|
$0.360
|
$0.260
|
$0.391
|
$0.400
|
$1.600
|
$0.400
|
$0.250
|
$0.250
|
$0.250
|
$0.300
|
$0.400
|
|
Totals: |
$14,780,998.480
|
$13,219,085.433
|
$14,346,152.892
|
$14,375,000.005
|
$15,389,854.662
|
$15,867,337.985
|
$16,819,807.393
|
$16,951,572.842
|
$17,553,803.250
|
$20,631,696.920
|
$22,759,068.995
|