|
|
PREPARING ROW
|
STA
|
261.880
|
$350.000
|
$415.050
|
$300.000
|
$200.000
|
$285.000
|
$500.000
|
$423.190
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
261.880
|
$600.000
|
$530.250
|
$260.000
|
$420.000
|
$633.850
|
$800.000
|
$601.210
|
|
|
BLADING
|
HR
|
100.000
|
$100.000
|
$57.000
|
$75.000
|
$180.000
|
$114.500
|
$350.000
|
$128.980
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
75,653.000
|
$1.150
|
$1.100
|
$0.550
|
$1.000
|
$1.450
|
$1.000
|
$2.530
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
75,653.000
|
$0.120
|
$0.110
|
$0.120
|
$0.120
|
$0.100
|
$0.150
|
$0.240
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
37,856.000
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.070
|
$0.100
|
$0.190
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
37,856.000
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.070
|
$0.100
|
$0.180
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
75,653.000
|
$1.200
|
$0.890
|
$1.150
|
$1.150
|
$0.870
|
$1.200
|
$1.720
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
9,663.000
|
$55.000
|
$54.210
|
$64.000
|
$81.000
|
$66.050
|
$85.000
|
$73.970
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)
|
TON
|
250.000
|
$70.000
|
$85.800
|
$38.000
|
$70.000
|
$185.000
|
$110.000
|
$52.100
|
|
|
PRIME COAT (RC-250)
|
GAL
|
7,971.000
|
$4.500
|
$3.830
|
$3.300
|
$7.000
|
$3.800
|
$4.000
|
$3.700
|
|
|
ASPH (TIER II)
|
GAL
|
30,842.000
|
$3.000
|
$2.900
|
$2.400
|
$2.550
|
$2.300
|
$3.500
|
$2.930
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
245.000
|
$125.000
|
$49.340
|
$155.000
|
$152.000
|
$222.000
|
$160.000
|
$229.410
|
|
|
AGGR(TY-PD GR-4 SAC-B)
|
CY
|
676.000
|
$100.000
|
$71.420
|
$98.000
|
$103.000
|
$147.000
|
$135.000
|
$118.140
|
|
|
HMCL ACP TY-D AES-300
|
TON
|
150.000
|
$120.000
|
$157.020
|
$80.000
|
$200.000
|
$133.000
|
$130.000
|
$152.290
|
|
|
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
|
TON
|
5,806.000
|
$80.000
|
$65.310
|
$80.000
|
$80.000
|
$81.350
|
$90.000
|
$86.010
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
5,500.000
|
$35.000
|
$22.650
|
$30.000
|
$40.000
|
$38.450
|
$40.000
|
$37.240
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
31.200
|
$500.000
|
$450.000
|
$390.000
|
$600.000
|
$530.000
|
$470.000
|
$640.560
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
6.700
|
$525.000
|
$450.000
|
$420.000
|
$700.000
|
$617.000
|
$490.000
|
$735.490
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
44.000
|
$75.000
|
$43.000
|
$68.000
|
$85.000
|
$67.150
|
$72.000
|
$84.170
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
56.000
|
$100.000
|
$49.000
|
$78.000
|
$100.000
|
$125.000
|
$50.000
|
$77.070
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
108.000
|
$800.000
|
$575.000
|
$795.000
|
$675.000
|
$511.500
|
$220.000
|
$432.230
|
|
|
CONC BOX CULV (7 FT X 5 FT)
|
LF
|
115.020
|
$1,000.000
|
$650.000
|
$910.000
|
$775.000
|
$610.000
|
$615.000
|
$467.320
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
8.000
|
$85.000
|
$120.000
|
$165.000
|
$100.000
|
$142.750
|
$150.000
|
$165.010
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
203.000
|
$80.000
|
$75.000
|
$190.000
|
$65.000
|
$115.150
|
$86.000
|
$57.320
|
|
|
INLET (COMPL)(TY H)
|
EA
|
1.000
|
$4,000.000
|
$4,300.000
|
$2,950.000
|
$4,000.000
|
$4,275.000
|
$2,500.000
|
$4,296.290
|
|
|
WINGWALL (FW - S) (HW=6 FT)
|
EA
|
1.000
|
$11,500.000
|
$9,500.000
|
$10,800.000
|
$9,000.000
|
$24,925.000
|
$12,000.000
|
$19,800.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
7.000
|
$15,000.000
|
$10,500.000
|
$11,800.000
|
$11,500.000
|
$22,665.000
|
$14,000.000
|
$17,465.000
|
|
|
SET (TY II) (18 IN) (CMP) (8: 1) (P)
|
EA
|
14.000
|
$1,200.000
|
$1,800.000
|
$1,450.000
|
$1,000.000
|
$1,560.000
|
$1,700.000
|
$914.060
|
|
|
SET (TY II) (18 IN) (RCP) (8: 1) (P)
|
EA
|
18.000
|
$1,200.000
|
$1,800.000
|
$1,725.000
|
$950.000
|
$1,495.000
|
$1,600.000
|
$851.560
|
|
|
SET (TY II) (24 IN) (CMP) (8: 1) (P)
|
EA
|
4.000
|
$1,200.000
|
$2,200.000
|
$1,500.000
|
$1,175.000
|
$1,790.000
|
$1,900.000
|
$1,082.810
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$2,000.000
|
$1,800.000
|
$1,850.000
|
$1,000.000
|
$1,585.000
|
$2,100.000
|
$832.810
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
5.000
|
$1,400.000
|
$2,000.000
|
$1,900.000
|
$1,125.000
|
$1,660.000
|
$2,200.000
|
$1,007.810
|
|
|
SET (TY II) (24 IN) (RCP) (8: 1) (P)
|
EA
|
12.000
|
$1,300.000
|
$2,400.000
|
$1,900.000
|
$1,125.000
|
$1,695.000
|
$1,900.000
|
$1,007.810
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,300.000
|
$2,100.000
|
$1,900.000
|
$1,575.000
|
$2,820.000
|
$2,500.000
|
$1,064.060
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$3,400.000
|
$2,500.000
|
$3,000.000
|
$2,100.000
|
$2,650.000
|
$3,200.000
|
$1,609.360
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$3,700.000
|
$3,500.000
|
$4,300.000
|
$3,650.000
|
$3,185.000
|
$4,600.000
|
$3,396.860
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$5,000.000
|
$6,200.000
|
$4,800.000
|
$4,200.000
|
$6,265.000
|
$7,500.000
|
$3,965.610
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$4,500.000
|
$4,500.000
|
$4,300.000
|
$5,500.000
|
$5,070.000
|
$4,200.000
|
$5,309.360
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$6,000.000
|
$6,200.000
|
$5,000.000
|
$6,000.000
|
$5,675.000
|
$5,600.000
|
$5,746.860
|
|
|
SET (TY II) (DES 3) (CMP) (8: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$3,000.000
|
$1,500.000
|
$2,000.000
|
$1,820.000
|
$1,500.000
|
$1,871.860
|
|
|
REMOV STR (PIPE)
|
LF
|
233.000
|
$19.000
|
$28.000
|
$27.000
|
$20.000
|
$21.300
|
$65.000
|
$13.370
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$223,300.000
|
$187,644.860
|
$250,000.000
|
$180,000.000
|
$204,730.000
|
$160,000.000
|
$346,575.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$3,500.000
|
$2,921.820
|
$10,300.000
|
$4,000.000
|
$2,400.000
|
$800.000
|
$1,262.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
120.000
|
$30.000
|
$47.120
|
$24.000
|
$24.000
|
$25.150
|
$26.000
|
$35.990
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
120.000
|
$8.000
|
$10.610
|
$6.500
|
$6.500
|
$7.070
|
$7.500
|
$10.250
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,480.000
|
$2.500
|
$5.050
|
$2.500
|
$2.500
|
$2.720
|
$3.000
|
$5.160
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,480.000
|
$0.500
|
$0.660
|
$0.500
|
$0.500
|
$0.540
|
$0.600
|
$1.040
|
|
|
DRIVEWAYS (CONC)
|
SY
|
96.000
|
$100.000
|
$78.000
|
$91.000
|
$100.000
|
$118.600
|
$65.000
|
$111.810
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
500.000
|
$35.000
|
$21.900
|
$26.000
|
$45.750
|
$71.000
|
$30.000
|
$39.770
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
697.000
|
$35.000
|
$39.420
|
$32.000
|
$45.750
|
$128.110
|
$31.000
|
$38.380
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
200.000
|
$20.000
|
$19.000
|
$19.550
|
$20.000
|
$21.250
|
$22.000
|
$27.980
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,500.000
|
$2,275.000
|
$2,287.000
|
$2,300.000
|
$2,485.970
|
$2,600.000
|
$2,522.580
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
21.000
|
$200.000
|
$185.000
|
$185.000
|
$161.000
|
$174.030
|
$210.000
|
$252.030
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$250.000
|
$235.000
|
$265.000
|
$200.000
|
$217.400
|
$300.000
|
$370.160
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$500.000
|
$405.000
|
$550.000
|
$480.000
|
$519.990
|
$610.000
|
$617.660
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
18.000
|
$300.000
|
$220.000
|
$268.000
|
$400.000
|
$430.400
|
$300.000
|
$434.290
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
13.000
|
$240.000
|
$185.000
|
$172.000
|
$315.000
|
$339.690
|
$200.000
|
$392.320
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
4.000
|
$30.000
|
$15.000
|
$17.000
|
$17.000
|
$18.220
|
$23.000
|
$47.990
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
28.000
|
$60.000
|
$45.000
|
$46.000
|
$45.500
|
$49.080
|
$43.000
|
$52.900
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
43,792.000
|
$0.220
|
$0.190
|
$0.100
|
$0.190
|
$0.110
|
$0.200
|
$0.240
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
2,740.000
|
$0.350
|
$0.210
|
$0.100
|
$0.210
|
$0.110
|
$0.250
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
27,370.000
|
$0.300
|
$0.200
|
$0.100
|
$0.200
|
$0.110
|
$0.250
|
$0.220
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,843.000
|
$1.000
|
$1.600
|
$0.650
|
$1.000
|
$0.920
|
$1.600
|
$1.300
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
30.000
|
$8.000
|
$7.000
|
$15.000
|
$7.000
|
$16.310
|
$8.000
|
$11.970
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
52,174.000
|
$0.330
|
$0.300
|
$0.300
|
$0.300
|
$0.330
|
$0.350
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,270.000
|
$0.350
|
$0.320
|
$0.300
|
$0.320
|
$0.330
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
32,663.000
|
$0.340
|
$0.310
|
$0.300
|
$0.310
|
$0.330
|
$0.400
|
$0.390
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
572.000
|
$4.000
|
$3.500
|
$3.000
|
$3.600
|
$3.260
|
$4.000
|
$4.570
|
|
Totals: |
$2,812,077.690
|
$2,468,925.074
|
$2,740,650.010
|
$2,905,801.670
|
$3,057,048.068
|
$3,186,108.850
|
$3,273,863.473
|