PREPARING ROW
|
STA
|
8.000
|
$2,000.000
|
$7,500.000
|
$10,000.000
|
$6,000.000
|
$350.000
|
|
|
REMOVING CONC (OTHER APPURTENANCES)
|
SY
|
20.000
|
$500.000
|
$600.000
|
$125.000
|
$50.000
|
$350.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
200.000
|
$100.000
|
$125.000
|
$49.000
|
$50.000
|
$165.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2")
|
SY
|
1,992.000
|
$6.000
|
$10.000
|
$5.250
|
$12.000
|
$8.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,810.000
|
$8.000
|
$15.000
|
$18.000
|
$14.000
|
$23.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
565.000
|
$10.000
|
$55.000
|
$18.000
|
$27.000
|
$45.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
4,886.000
|
$0.750
|
$2.000
|
$1.500
|
$2.500
|
$5.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
4,886.000
|
$0.300
|
$0.600
|
$0.550
|
$0.530
|
$1.000
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
4,886.000
|
$0.300
|
$0.550
|
$0.500
|
$0.450
|
$1.000
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
4,886.000
|
$0.300
|
$0.550
|
$0.500
|
$0.450
|
$1.000
|
|
|
FERTILIZER
|
AC
|
1.000
|
$500.000
|
$750.000
|
$500.000
|
$875.000
|
$1,100.000
|
|
|
VEGETATIVE WATERING
|
MG
|
0.120
|
$12.000
|
$200.000
|
$200.000
|
$1,450.000
|
$8,500.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
2,155.000
|
$1.500
|
$1.700
|
$1.500
|
$2.000
|
$6.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2) (6")
|
SY
|
2,640.000
|
$20.000
|
$25.000
|
$16.000
|
$20.000
|
$17.000
|
|
|
CEMENT
|
TON
|
38.000
|
$150.000
|
$225.000
|
$195.000
|
$225.000
|
$125.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
3,483.000
|
$2.500
|
$8.000
|
$4.500
|
$7.500
|
$11.000
|
|
|
ASPH (RC-250)
|
GAL
|
635.000
|
$4.100
|
$18.000
|
$7.000
|
$20.000
|
$45.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
211.000
|
$90.000
|
$85.000
|
$75.000
|
$400.000
|
$75.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG64-22
|
TON
|
420.000
|
$66.970
|
$150.000
|
$135.000
|
$250.000
|
$150.000
|
|
|
CEM STABIL BKFL
|
CY
|
230.000
|
$79.000
|
$180.000
|
$215.000
|
$200.000
|
$55.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,557.000
|
$30.000
|
$35.000
|
$35.500
|
$55.000
|
$45.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
172.000
|
$51.500
|
$75.000
|
$90.000
|
$110.000
|
$239.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
3,761.000
|
$167.000
|
$235.000
|
$235.000
|
$236.000
|
$397.000
|
|
|
CL C CONC (ABUT)
|
CY
|
74.000
|
$952.000
|
$1,250.000
|
$1,075.000
|
$1,300.000
|
$1,671.000
|
|
|
CL C CONC (MISC)
|
CY
|
154.100
|
$1,400.000
|
$1,500.000
|
$1,150.000
|
$1,650.000
|
$1,700.000
|
|
|
REINF CONC SLAB
|
SF
|
5,460.000
|
$22.000
|
$38.000
|
$28.000
|
$26.000
|
$32.000
|
|
|
APPROACH SLAB
|
CY
|
59.200
|
$450.000
|
$900.000
|
$665.000
|
$650.000
|
$750.000
|
|
|
RETAINING WALL (DRILL SHAFT) (FACIA)
|
SF
|
1,006.000
|
$33.000
|
$64.000
|
$215.000
|
$250.000
|
$70.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
906.680
|
$122.000
|
$160.000
|
$250.000
|
$224.000
|
$215.000
|
|
|
PNEUMATICALLY PLACED CONC (ENCASEMENT)
|
SF
|
4,117.000
|
$22.000
|
$13.000
|
$14.500
|
$15.000
|
$15.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1.600
|
$325.000
|
$2,500.000
|
$1,200.000
|
$2,500.000
|
$1,644.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,818.000
|
$98.000
|
$72.000
|
$101.000
|
$125.000
|
$223.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
19.000
|
$400.000
|
$700.000
|
$550.000
|
$550.000
|
$650.000
|
|
|
RAIL (TY T223)
|
LF
|
340.000
|
$105.000
|
$115.000
|
$125.000
|
$110.000
|
$315.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
83.000
|
$120.000
|
$75.000
|
$95.000
|
$100.000
|
$97.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
50.000
|
$100.000
|
$85.000
|
$97.000
|
$105.000
|
$130.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$1,400.000
|
$750.000
|
$1,600.000
|
$1,000.000
|
$1,875.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$850.000
|
$1,750.000
|
$1,000.000
|
$1,600.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,200.000
|
$6,000.000
|
$5,500.000
|
$6,000.000
|
$1,180.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
75.000
|
$60.000
|
$450.000
|
$275.000
|
$200.000
|
$200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$192,475.000
|
$350,000.000
|
$380,000.000
|
$439,000.000
|
$204,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$6,000.000
|
$6,000.000
|
$2,250.000
|
$3,000.000
|
$4,400.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
265.000
|
$30.000
|
$32.000
|
$32.000
|
$35.000
|
$33.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
265.000
|
$7.000
|
$8.000
|
$9.000
|
$11.000
|
$9.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
66.000
|
$25.000
|
$10.000
|
$14.000
|
$33.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
66.000
|
$7.000
|
$4.000
|
$4.000
|
$11.000
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,075.000
|
$2.750
|
$3.000
|
$5.200
|
$3.750
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,075.000
|
$0.650
|
$0.750
|
$0.750
|
$1.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,086.000
|
$45.000
|
$80.000
|
$75.000
|
$155.000
|
$50.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
24.000
|
$4,000.000
|
$3,200.000
|
$2,700.000
|
$2,500.000
|
$2,392.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,510.000
|
$30.000
|
$36.000
|
$84.000
|
$50.000
|
$111.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
160.000
|
$45.000
|
$50.000
|
$88.000
|
$85.000
|
$109.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$45.000
|
$50.000
|
$97.000
|
$85.000
|
$113.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
2,090.000
|
$10.000
|
$6.000
|
$9.000
|
$15.000
|
$5.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,510.000
|
$8.250
|
$10.000
|
$19.000
|
$12.000
|
$23.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
270.000
|
$10.000
|
$10.000
|
$10.000
|
$17.000
|
$23.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$10.000
|
$10.000
|
$10.000
|
$17.000
|
$23.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
194.000
|
$85.000
|
$60.000
|
$45.000
|
$70.000
|
$19.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
325.000
|
$25.000
|
$20.000
|
$26.000
|
$20.500
|
$24.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$1,500.000
|
$2,350.000
|
$1,475.000
|
$2,025.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,500.000
|
$2,700.000
|
$2,800.000
|
$2,700.000
|
$39.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$3,000.000
|
$1,000.000
|
$1,500.000
|
$1,500.000
|
$6,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$3,000.000
|
$1,000.000
|
$950.000
|
$875.000
|
$7,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$8,000.000
|
$13,000.000
|
$9,500.000
|
$8,550.000
|
$26,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$500.000
|
$900.000
|
$850.000
|
$700.000
|
$576.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$23.000
|
$25.000
|
$31.000
|
$33.000
|
$350.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
15.000
|
$31.000
|
$40.000
|
$50.000
|
$40.000
|
$350.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,922.000
|
$0.610
|
$3.300
|
$3.300
|
$3.250
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
77.000
|
$8.250
|
$11.000
|
$11.000
|
$11.500
|
$25.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,916.000
|
$0.750
|
$3.300
|
$3.300
|
$3.250
|
$1.650
|
|
|
PAVEMENT SEALER 4"
|
LF
|
2,864.000
|
$0.250
|
$1.100
|
$1.100
|
$1.110
|
$2.300
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,432.000
|
$0.300
|
$3.300
|
$3.300
|
$3.290
|
$4.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
1,432.000
|
$0.550
|
$3.300
|
$3.300
|
$3.290
|
$8.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
74.000
|
$3.000
|
$11.000
|
$11.000
|
$11.750
|
$8.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,280.000
|
$0.500
|
$2.200
|
$2.200
|
$2.190
|
$2.900
|
|
|
PAV SURF PREP FOR MRK (BLAST CLN)(4")
|
LF
|
2,864.000
|
$0.100
|
$0.550
|
$0.550
|
$0.600
|
$0.100
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,000.000
|
$10,000.000
|
$20,000.000
|
$15,000.000
|
$16,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$9,000.000
|
$10,000.000
|
$1,500.000
|
$25,000.000
|
$580.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$250.000
|
$400.000
|
$100.000
|
$75.000
|
$118.000
|
|
Totals: |
$2,780,998.970
|
$3,722,168.950
|
$3,818,900.750
|
$4,397,592.250
|
$4,781,262.600
|