PREPARING ROW
|
STA
|
14.200
|
$2,200.000
|
$2,100.000
|
$1,650.000
|
$1,970.000
|
$1,600.000
|
$3,000.000
|
$1,400.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,577.000
|
$11.000
|
$12.000
|
$15.000
|
$13.600
|
$16.000
|
$14.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
1,819.000
|
$14.000
|
$18.000
|
$22.000
|
$21.800
|
$15.000
|
$14.500
|
$25.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
3,832.000
|
$1.250
|
$2.500
|
$1.000
|
$2.010
|
$2.500
|
$5.000
|
$1.250
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
3,832.000
|
$1.000
|
$0.960
|
$1.500
|
$1.780
|
$1.250
|
$1.650
|
$0.810
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
1,917.000
|
$1.000
|
$0.960
|
$1.500
|
$0.260
|
$1.250
|
$1.650
|
$1.350
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
1,917.000
|
$1.000
|
$0.950
|
$1.500
|
$0.270
|
$1.250
|
$1.650
|
$1.350
|
|
|
VEGETATIVE WATERING
|
MG
|
38.300
|
$12.500
|
$45.000
|
$50.000
|
$5.700
|
$25.000
|
$10.000
|
$56.000
|
|
|
FL BS (CMP IN PLC)(TY-D GR-1-2)(7")
|
SY
|
4,703.000
|
$12.000
|
$16.000
|
$14.000
|
$15.600
|
$24.000
|
$21.500
|
$44.000
|
|
|
CEMENT
|
TON
|
57.000
|
$170.000
|
$200.000
|
$200.000
|
$140.000
|
$175.000
|
$200.000
|
$200.000
|
|
|
CEMENT TREAT (EXIST MATL) (DC) (9")
|
SY
|
5,102.000
|
$8.000
|
$4.650
|
$4.000
|
$3.680
|
$5.000
|
$3.000
|
$32.000
|
|
|
ASPH (RC-250)
|
GAL
|
1,099.000
|
$3.850
|
$10.000
|
$5.500
|
$10.500
|
$7.000
|
$10.750
|
$15.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
32.000
|
$90.000
|
$600.000
|
$310.000
|
$315.000
|
$600.000
|
$575.000
|
$400.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
70.000
|
$125.000
|
$500.000
|
$300.000
|
$420.000
|
$600.000
|
$350.000
|
$400.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
3,690.000
|
$3.700
|
$10.000
|
$4.250
|
$10.500
|
$6.000
|
$6.000
|
$15.000
|
|
|
CEM STABIL BKFL
|
CY
|
151.000
|
$100.000
|
$200.000
|
$200.000
|
$167.000
|
$110.000
|
$300.000
|
$222.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,037.000
|
$12.000
|
$40.000
|
$25.000
|
$9.800
|
$35.000
|
$46.000
|
$46.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
630.000
|
$200.000
|
$194.000
|
$200.000
|
$168.000
|
$175.000
|
$200.000
|
$325.085
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
350.000
|
$190.000
|
$269.000
|
$225.000
|
$254.000
|
$250.000
|
$305.000
|
$356.548
|
|
|
CL C CONC (ABUT)
|
CY
|
57.600
|
$1,400.000
|
$1,050.000
|
$1,600.000
|
$1,130.000
|
$1,800.000
|
$1,150.000
|
$2,200.000
|
|
|
CL C CONC (CAP)
|
CY
|
19.000
|
$1,500.000
|
$1,250.000
|
$2,000.000
|
$1,510.000
|
$1,800.000
|
$1,150.000
|
$2,200.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
9.400
|
$1,400.000
|
$1,500.000
|
$2,000.000
|
$1,340.000
|
$1,800.000
|
$1,950.000
|
$2,200.000
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
2,611.000
|
$16.000
|
$16.000
|
$22.000
|
$18.500
|
$22.000
|
$20.000
|
$26.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
2,875.000
|
$22.000
|
$17.000
|
$23.000
|
$21.300
|
$22.000
|
$20.000
|
$26.000
|
|
|
APPROACH SLAB
|
CY
|
119.600
|
$640.000
|
$575.000
|
$587.000
|
$631.000
|
$850.000
|
$500.000
|
$660.000
|
|
|
SHEAR KEY
|
CY
|
11.200
|
$380.000
|
$425.000
|
$400.000
|
$478.000
|
$1,000.000
|
$565.000
|
$670.000
|
|
|
PRESTR CONC BOX BEAM (5B20)
|
LF
|
516.000
|
$200.000
|
$187.000
|
$210.000
|
$188.000
|
$178.000
|
$200.000
|
$282.470
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
147.000
|
$210.000
|
$174.000
|
$210.000
|
$156.000
|
$265.000
|
$150.000
|
$282.470
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
441.000
|
$255.000
|
$182.000
|
$210.000
|
$156.000
|
$190.000
|
$150.000
|
$236.548
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,250.000
|
$160.000
|
$110.000
|
$89.000
|
$141.000
|
$75.000
|
$160.000
|
$145.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
41.000
|
$400.000
|
$450.000
|
$490.000
|
$563.000
|
$700.000
|
$650.000
|
$500.000
|
|
|
RAIL (TY T223)
|
LF
|
336.000
|
$110.000
|
$108.000
|
$122.000
|
$135.000
|
$220.000
|
$85.000
|
$95.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
154.000
|
$105.000
|
$90.000
|
$95.000
|
$105.000
|
$50.000
|
$100.000
|
$95.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
42.000
|
$55.000
|
$99.000
|
$105.000
|
$66.000
|
$64.000
|
$100.000
|
$80.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
19.000
|
$160.000
|
$113.000
|
$250.000
|
$160.000
|
$160.000
|
$150.000
|
$180.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$1,000.000
|
$995.000
|
$1,210.000
|
$750.000
|
$750.000
|
$1,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,400.000
|
$2,500.000
|
$2,000.000
|
$3,300.000
|
$1,600.000
|
$2,000.000
|
$2,450.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$20,000.000
|
$20,000.000
|
$28,500.000
|
$26,100.000
|
$25,000.000
|
$35,000.000
|
$41,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$150,000.000
|
$200,000.000
|
$200,000.000
|
$148,000.000
|
$200,000.000
|
$175,000.000
|
$386,461.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
21.000
|
$7,500.000
|
$2,000.000
|
$600.000
|
$903.000
|
$4,000.000
|
$5,000.000
|
$1,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$28.000
|
$38.000
|
$41.000
|
$54.000
|
$36.000
|
$42.000
|
$65.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$8.000
|
$9.000
|
$15.000
|
$14.800
|
$12.000
|
$16.500
|
$65.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
624.000
|
$20.000
|
$35.000
|
$10.000
|
$20.700
|
$20.000
|
$20.000
|
$28.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
624.000
|
$8.000
|
$9.000
|
$3.000
|
$6.400
|
$10.000
|
$10.000
|
$28.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,025.000
|
$2.500
|
$4.000
|
$4.000
|
$4.420
|
$3.000
|
$3.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,025.000
|
$0.600
|
$1.000
|
$1.000
|
$1.120
|
$1.000
|
$1.100
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
551.000
|
$53.110
|
$100.000
|
$65.000
|
$79.000
|
$125.000
|
$75.000
|
$110.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
18.000
|
$4,200.000
|
$3,000.000
|
$4,000.000
|
$2,420.000
|
$6,500.000
|
$8,000.000
|
$15,000.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,530.000
|
$50.000
|
$44.000
|
$99.000
|
$168.000
|
$50.000
|
$105.000
|
$42.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,230.000
|
$8.000
|
$6.000
|
$10.000
|
$5.600
|
$14.000
|
$18.000
|
$39.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,530.000
|
$11.000
|
$10.000
|
$15.000
|
$8.900
|
$12.000
|
$12.000
|
$15.000
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
288.000
|
$0.250
|
$34.300
|
$22.000
|
$22.000
|
$16.000
|
$16.000
|
$44.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
200.000
|
$20.000
|
$21.500
|
$22.000
|
$25.900
|
$22.000
|
$22.000
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,950.000
|
$1,490.000
|
$2,200.000
|
$1,760.000
|
$1,700.000
|
$1,500.000
|
$2,100.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,700.000
|
$2,819.000
|
$2,800.000
|
$2,810.000
|
$2,900.000
|
$2,500.000
|
$2,800.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
6.000
|
$11,000.000
|
$13,200.000
|
$12,500.000
|
$13,300.000
|
$13,000.000
|
$13,750.000
|
$14,888.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,700.000
|
$2,665.000
|
$2,000.000
|
$1,860.000
|
$2,200.000
|
$2,750.000
|
$1,900.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,500.000
|
$1,070.000
|
$750.000
|
$1,060.000
|
$1,400.000
|
$1,100.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$640.000
|
$750.000
|
$600.000
|
$574.000
|
$530.000
|
$525.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$500.000
|
$800.000
|
$700.000
|
$664.000
|
$610.000
|
$605.000
|
$477.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$90.000
|
$250.000
|
$75.000
|
$105.000
|
$85.000
|
$85.000
|
$125.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
4.000
|
$140.000
|
$65.000
|
$44.000
|
$72.000
|
$25.000
|
$50.000
|
$66.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
4.000
|
$17.000
|
$30.000
|
$23.000
|
$33.000
|
$25.000
|
$16.500
|
$36.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
8.000
|
$21.000
|
$30.000
|
$23.000
|
$33.000
|
$25.000
|
$22.000
|
$36.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
4.000
|
$87.000
|
$65.000
|
$108.000
|
$77.000
|
$75.000
|
$50.000
|
$70.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
6,704.000
|
$0.700
|
$1.300
|
$1.000
|
$1.310
|
$1.400
|
$1.400
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
48.000
|
$7.050
|
$12.000
|
$54.000
|
$10.500
|
$12.000
|
$11.000
|
$68.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
14,400.000
|
$0.900
|
$1.300
|
$0.600
|
$1.310
|
$1.400
|
$1.400
|
$0.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
209.000
|
$0.690
|
$5.600
|
$1.500
|
$1.080
|
$0.600
|
$1.200
|
$2.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
2,800.000
|
$0.380
|
$5.300
|
$0.800
|
$5.300
|
$5.500
|
$5.500
|
$1.550
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
2,800.000
|
$0.380
|
$5.300
|
$2.850
|
$5.300
|
$5.500
|
$5.500
|
$2.880
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
360.000
|
$2.610
|
$5.500
|
$7.500
|
$5.300
|
$5.500
|
$5.500
|
$18.000
|
|
TRAFFIC BUTTON TY II-A-A
|
EA
|
35.000
|
$3.400
|
$7.300
|
$3.250
|
$5.300
|
$5.500
|
$5.500
|
$9.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
18,530.000
|
$0.900
|
$0.380
|
$0.700
|
$0.370
|
$0.360
|
$0.400
|
$1.000
|
|
Totals: |
$2,034,217.020
|
$2,035,077.890
|
$2,078,811.450
|
$2,125,349.920
|
$2,287,178.300
|
$2,401,306.550
|
$3,261,098.248
|