REMOVING CONC (DRIVEWAYS)
|
SY
|
635.000
|
$41.000
|
$10.500
|
$10.000
|
$10.000
|
$14.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
1,771.000
|
$3.000
|
$3.800
|
$9.000
|
$4.000
|
$7.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
55,913.000
|
$7.000
|
$3.500
|
$5.000
|
$3.750
|
$3.300
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
236.840
|
$330.000
|
$300.000
|
$372.000
|
$950.000
|
$425.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
5,160.000
|
$10.200
|
$14.400
|
$20.250
|
$20.500
|
$19.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
236.840
|
$130.000
|
$175.000
|
$292.000
|
$275.000
|
$185.000
|
|
|
BLADING
|
HR
|
200.000
|
$100.000
|
$65.250
|
$150.000
|
$125.000
|
$130.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
64,771.000
|
$0.200
|
$0.100
|
$0.150
|
$0.090
|
$0.120
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
64,771.000
|
$0.250
|
$0.350
|
$0.340
|
$0.320
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
1,635.000
|
$17.000
|
$19.500
|
$10.000
|
$5.000
|
$11.500
|
|
|
PROOF ROLLING
|
HR
|
815.000
|
$80.000
|
$68.000
|
$25.000
|
$30.000
|
$85.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
81,540.000
|
$12.000
|
$12.550
|
$10.300
|
$19.500
|
$16.000
|
|
|
CEMENT
|
TON
|
2,419.000
|
$180.000
|
$136.500
|
$132.000
|
$125.000
|
$185.000
|
|
|
CEMENT TREAT (NEW BASE) (8")
|
SY
|
81,540.000
|
$5.000
|
$3.450
|
$2.650
|
$1.400
|
$2.950
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
83,294.000
|
$3.000
|
$2.150
|
$2.100
|
$1.200
|
$2.950
|
|
|
PRIME COAT (AE-P)
|
GAL
|
14,904.000
|
$4.900
|
$2.350
|
$3.100
|
$3.000
|
$2.700
|
|
|
D-GR HMA TY-D PG 70-22 (LEVEL-UP)
|
TON
|
6,148.000
|
$79.000
|
$80.000
|
$73.000
|
$72.000
|
$80.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
|
TON
|
16,033.000
|
$80.000
|
$80.000
|
$81.000
|
$76.150
|
$85.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
777.000
|
$2.500
|
$8.700
|
$15.000
|
$3.000
|
$6.200
|
|
|
FULL-DEPTH REPAIR CPJR (VAR DEPTH)
|
CY
|
100.000
|
$300.000
|
$735.000
|
$714.000
|
$350.000
|
$550.000
|
|
|
CEM STABIL BKFL
|
CY
|
41.000
|
$62.000
|
$105.000
|
$102.000
|
$175.000
|
$220.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
126.000
|
$13.000
|
$52.500
|
$51.000
|
$40.000
|
$80.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
4.000
|
$380.000
|
$580.000
|
$561.000
|
$800.000
|
$745.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
153.000
|
$700.000
|
$420.000
|
$510.000
|
$300.000
|
$590.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
78.000
|
$550.000
|
$525.000
|
$612.000
|
$400.000
|
$692.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
420.000
|
$65.000
|
$89.000
|
$87.000
|
$85.000
|
$100.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$11,350.000
|
$16,800.000
|
$16,500.000
|
$13,500.000
|
$19,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
18.000
|
$7,100.000
|
$4,100.000
|
$3,600.000
|
$2,900.000
|
$4,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$1,280.000
|
$945.000
|
$925.000
|
$1,100.000
|
$1,300.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$282,357.770
|
$140,000.000
|
$357,000.000
|
$400,000.000
|
$341,600.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$7,500.000
|
$825.000
|
$900.000
|
$2,500.000
|
$2,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
730.000
|
$29.000
|
$29.400
|
$25.000
|
$28.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
730.000
|
$8.500
|
$9.450
|
$10.000
|
$9.000
|
$8.200
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
955.000
|
$2.300
|
$3.700
|
$2.000
|
$3.500
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
955.000
|
$0.850
|
$1.050
|
$1.000
|
$1.000
|
$1.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
120.000
|
$56.000
|
$20.000
|
$35.000
|
$85.000
|
$62.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
120.000
|
$5.000
|
$15.000
|
$15.000
|
$25.000
|
$50.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
120.000
|
$6.500
|
$15.000
|
$35.000
|
$40.000
|
$47.000
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (CONC)
|
SY
|
639.000
|
$87.000
|
$73.500
|
$72.000
|
$92.000
|
$120.000
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (ACP)
|
SY
|
977.000
|
$23.000
|
$63.800
|
$62.000
|
$40.000
|
$48.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
1,794.000
|
$20.000
|
$36.300
|
$16.000
|
$38.000
|
$60.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
52,780.000
|
$0.200
|
$0.150
|
$0.130
|
$0.130
|
$0.100
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
22,239.000
|
$0.200
|
$0.150
|
$0.130
|
$0.130
|
$0.200
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$12,600.000
|
$17,640.000
|
$16,000.000
|
$16,000.000
|
$14,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,700.000
|
$5,355.000
|
$3,900.000
|
$4,000.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$990.000
|
$1,050.000
|
$1,000.000
|
$1,000.000
|
$925.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
61.000
|
$240.000
|
$385.000
|
$184.000
|
$365.000
|
$189.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
8.000
|
$240.000
|
$475.000
|
$234.000
|
$455.000
|
$200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
47.000
|
$470.000
|
$380.000
|
$357.000
|
$360.000
|
$380.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$590.000
|
$430.000
|
$393.000
|
$410.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
2.000
|
$660.000
|
$550.000
|
$521.000
|
$525.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$610.000
|
$565.000
|
$545.000
|
$540.000
|
$630.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$745.000
|
$815.000
|
$735.000
|
$775.000
|
$870.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
24.000
|
$350.000
|
$360.000
|
$316.000
|
$340.000
|
$300.000
|
|
|
RELOCATE LRSA
|
EA
|
1.000
|
$3,410.000
|
$4,000.000
|
$3,900.000
|
$3,800.000
|
$3,200.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
12.000
|
$62.000
|
$50.400
|
$51.000
|
$48.000
|
$55.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
47,736.000
|
$0.300
|
$0.150
|
$0.270
|
$0.140
|
$0.270
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
48,181.000
|
$0.300
|
$0.150
|
$0.280
|
$0.150
|
$0.280
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
47,736.000
|
$0.600
|
$0.500
|
$0.360
|
$0.580
|
$0.360
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
48,181.000
|
$0.650
|
$0.500
|
$0.360
|
$0.620
|
$0.360
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,398.000
|
$1.600
|
$0.550
|
$1.500
|
$1.000
|
$1.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
6,470.000
|
$1.100
|
$0.550
|
$1.500
|
$1.000
|
$1.600
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
36.000
|
$1.100
|
$1.050
|
$2.000
|
$1.800
|
$2.050
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,271.000
|
$0.800
|
$0.650
|
$0.710
|
$0.800
|
$0.720
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
3,470.000
|
$0.400
|
$0.400
|
$0.310
|
$0.300
|
$0.310
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
48,394.000
|
$0.350
|
$0.350
|
$0.310
|
$0.280
|
$0.310
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
2,100.000
|
$0.280
|
$0.400
|
$0.680
|
$0.300
|
$0.310
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
50,934.000
|
$0.300
|
$0.350
|
$0.310
|
$0.280
|
$0.310
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
218.000
|
$12.000
|
$15.000
|
$12.250
|
$9.850
|
$12.250
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
17.000
|
$203.000
|
$240.000
|
$189.000
|
$235.000
|
$190.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
13.000
|
$285.000
|
$335.000
|
$230.000
|
$300.000
|
$230.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
231.000
|
$3.350
|
$4.850
|
$3.000
|
$3.000
|
$3.050
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,067.000
|
$6.000
|
$4.850
|
$3.000
|
$3.000
|
$3.050
|
|
|
REMOVE CENTERLINE TEXTURING
|
LF
|
24,288.000
|
$8.000
|
$4.100
|
$3.150
|
$3.000
|
$1.350
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$1,300.000
|
$3,000.000
|
$15,000.000
|
$16,000.000
|
|
Totals: |
$6,053,523.770
|
$5,234,742.150
|
$5,236,355.830
|
$5,787,236.610
|
$6,082,688.740
|