|
|
EXCAVATION (CHANNEL)
|
CY
|
210.000
|
$27.000
|
$85.000
|
$75.000
|
$75.000
|
$74.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
190.000
|
$61.000
|
$57.200
|
$115.000
|
$60.000
|
$90.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
148.000
|
$264.000
|
$273.000
|
$585.000
|
$360.000
|
$766.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
40.000
|
$184.000
|
$301.000
|
$100.000
|
$458.000
|
$309.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
24,764.000
|
$1.500
|
$0.400
|
$0.840
|
$0.420
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
35.000
|
$6.000
|
$263.000
|
$175.000
|
$180.000
|
$83.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
450.000
|
$75.000
|
$109.000
|
$206.000
|
$95.000
|
$129.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
16,712.000
|
$3.000
|
$3.500
|
$9.500
|
$3.000
|
$5.000
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
13,154.000
|
$2.000
|
$3.100
|
$6.000
|
$3.000
|
$3.750
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
110.000
|
$219.000
|
$313.000
|
$256.000
|
$172.000
|
$290.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
200.000
|
$240.000
|
$210.000
|
$348.000
|
$172.000
|
$245.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(24 IN)
|
CY
|
475.000
|
$250.000
|
$276.000
|
$348.000
|
$219.000
|
$236.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
43.000
|
$43.000
|
$796.000
|
$1,100.000
|
$540.000
|
$890.000
|
|
|
RIPRAP (STONE TY R)(GROUT)(24 IN)
|
CY
|
240.000
|
$250.000
|
$355.000
|
$345.000
|
$283.000
|
$342.000
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
127.000
|
$400.000
|
$398.000
|
$366.000
|
$475.000
|
$327.000
|
|
|
GABIONS (5'X 3')(GALV)
|
CY
|
324.000
|
$450.000
|
$364.000
|
$362.000
|
$368.000
|
$485.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$1,500.000
|
$4,598.000
|
$5,000.000
|
$3,000.000
|
$1,110.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$200,000.000
|
$114,000.000
|
$93,000.000
|
$125,059.450
|
$206,600.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
3.000
|
$3,500.000
|
$1,178.000
|
$24,000.000
|
$18,000.000
|
$1,425.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
10.000
|
$44.000
|
$42.300
|
$90.000
|
$131.000
|
$47.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$53.000
|
$48.300
|
$90.000
|
$131.000
|
$47.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
90.000
|
$18.000
|
$18.100
|
$27.000
|
$53.500
|
$13.000
|
|
|
SANDBAGS FOR EROSION CONTROL (12")
|
LF
|
480.000
|
$11.000
|
$19.200
|
$11.000
|
$18.500
|
$13.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,149.000
|
$45.000
|
$27.700
|
$63.000
|
$31.000
|
$36.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
10,849.000
|
$0.800
|
$0.300
|
$0.700
|
$1.500
|
$0.300
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
725.000
|
$32.000
|
$30.200
|
$32.000
|
$29.700
|
$31.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$766.000
|
$1,994.000
|
$1,400.000
|
$1,723.000
|
$1,550.000
|
|
|
TL-3 31" SHORT RADIUS (END ANCHOR)
|
EA
|
2.000
|
$14,500.000
|
$18,127.000
|
$13,000.000
|
$23,765.000
|
$20,000.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$3,313.000
|
$3,686.000
|
$3,700.000
|
$4,159.000
|
$3,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
44.000
|
$1,027.000
|
$556.000
|
$703.000
|
$1,010.000
|
$715.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(P)
|
EA
|
4.000
|
$889.000
|
$906.000
|
$874.000
|
$1,010.000
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
7.000
|
$1,202.000
|
$1,142.000
|
$1,200.000
|
$1,010.000
|
$1,200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
20.000
|
$42.000
|
$42.300
|
$25.000
|
$1,010.000
|
$42.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
5,510.000
|
$0.480
|
$0.500
|
$0.600
|
$0.600
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
4.000
|
$101.000
|
$60.400
|
$133.000
|
$148.500
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
4,863.000
|
$0.480
|
$0.500
|
$0.600
|
$0.750
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
22,220.000
|
$0.400
|
$0.500
|
$0.600
|
$0.650
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
|
LF
|
48.000
|
$5.520
|
$2.400
|
$6.250
|
$4.650
|
$4.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,810.000
|
$0.700
|
$1.200
|
$2.100
|
$1.500
|
$2.500
|
|
|
PAVEMENT SEALER 6"
|
LF
|
12,008.000
|
$0.360
|
$0.400
|
$0.110
|
$0.500
|
$0.350
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
43,034.000
|
$0.990
|
$0.950
|
$1.000
|
$1.250
|
$1.350
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
1,359.000
|
$0.790
|
$0.950
|
$0.950
|
$0.900
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
40,043.000
|
$0.760
|
$0.850
|
$0.950
|
$0.790
|
$0.850
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
104.000
|
$12.000
|
$21.800
|
$21.300
|
$20.800
|
$15.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
7.000
|
$180.000
|
$302.000
|
$345.000
|
$386.000
|
$255.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
10.000
|
$325.000
|
$302.000
|
$425.000
|
$469.400
|
$360.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
10.000
|
$22.000
|
$30.200
|
$42.000
|
$77.250
|
$89.000
|
|
PREFAB PAV MRK TY C (Y) (12") (SLD)
|
LF
|
115.000
|
$11.000
|
$10.900
|
$11.000
|
$9.500
|
$8.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
104.000
|
$11.000
|
$21.800
|
$22.000
|
$18.400
|
$16.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
122.000
|
$3.200
|
$7.700
|
$6.350
|
$7.700
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
771.000
|
$3.200
|
$7.700
|
$6.350
|
$7.700
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
12,008.000
|
$1.330
|
$0.500
|
$0.550
|
$0.750
|
$0.400
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
10,796.000
|
$2.000
|
$8.600
|
$7.000
|
$30.000
|
$16.000
|
|
|
FILTER FABRIC (TY 2)
|
SY
|
850.000
|
$8.500
|
$16.100
|
$2.000
|
$1.800
|
$1.650
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
738.000
|
$110.000
|
$156.000
|
$219.000
|
$132.000
|
$169.000
|
|
|
TACK COAT
|
GAL
|
546.000
|
$15.940
|
$8.900
|
$6.000
|
$4.750
|
$4.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
13,584.000
|
$130.000
|
$123.500
|
$126.000
|
$150.000
|
$149.000
|
|
|
TACK COAT
|
GAL
|
8,415.000
|
$4.000
|
$4.000
|
$6.000
|
$4.750
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
200.000
|
$300.000
|
$98.900
|
$150.000
|
$107.000
|
$207.000
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$350.000
|
$311.000
|
$250.000
|
$186.000
|
$385.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
11.000
|
$376.000
|
$30.200
|
$300.000
|
$654.000
|
$720.000
|
|
Totals: |
$3,253,031.510
|
$3,176,353.600
|
$3,683,191.790
|
$3,830,000.000
|
$3,881,653.550
|