PREPARING ROW
|
STA
|
15.800
|
$2,500.000
|
$950.000
|
$2,600.000
|
$2,300.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
559.000
|
$10.000
|
$12.000
|
$30.000
|
$23.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
83.000
|
$15.000
|
$25.000
|
$30.000
|
$37.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,865.000
|
$10.000
|
$12.000
|
$12.000
|
$10.000
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
3,510.000
|
$5.000
|
$6.000
|
$8.000
|
$6.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
707.000
|
$13.000
|
$16.000
|
$20.000
|
$22.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
160.000
|
$13.000
|
$40.000
|
$20.000
|
$48.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,413.000
|
$16.000
|
$17.500
|
$20.000
|
$42.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
10,065.000
|
$2.000
|
$5.000
|
$4.000
|
$2.600
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
10,065.000
|
$0.700
|
$0.750
|
$0.500
|
$0.450
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
10,065.000
|
$0.700
|
$0.750
|
$0.500
|
$0.350
|
|
|
VEGETATIVE WATERING
|
MG
|
165.000
|
$25.000
|
$20.000
|
$1.000
|
$22.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
1,532.000
|
$2.000
|
$5.000
|
$3.000
|
$2.100
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
1,203.000
|
$55.000
|
$77.000
|
$60.000
|
$68.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
753.000
|
$5.000
|
$14.000
|
$5.000
|
$10.000
|
|
|
ASPH (CRS-2)
|
GAL
|
1,695.000
|
$5.000
|
$8.500
|
$3.000
|
$5.600
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
29.000
|
$300.000
|
$675.000
|
$400.000
|
$750.000
|
|
|
CEM STABIL BKFL
|
CY
|
324.000
|
$150.000
|
$245.000
|
$250.000
|
$200.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
140.000
|
$110.000
|
$145.000
|
$80.000
|
$180.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,313.000
|
$200.000
|
$232.000
|
$145.000
|
$230.000
|
|
|
CL B CONC (FLUME)
|
CY
|
14.800
|
$500.000
|
$800.000
|
$550.000
|
$770.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
102.100
|
$1,000.000
|
$825.000
|
$950.000
|
$1,800.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
93.500
|
$1,200.000
|
$975.000
|
$1,100.000
|
$1,800.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
55.900
|
$1,500.000
|
$1,200.000
|
$1,100.000
|
$1,000.000
|
|
|
REINF CONC SLAB
|
SF
|
17,850.000
|
$19.000
|
$15.250
|
$22.000
|
$23.000
|
|
|
APPROACH SLAB
|
CY
|
113.700
|
$500.000
|
$500.000
|
$600.000
|
$1,000.000
|
|
|
PRESTR CONC BOX BEAM (5XB20)
|
LF
|
534.000
|
$220.000
|
$195.000
|
$270.000
|
$210.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
1,550.000
|
$150.000
|
$175.000
|
$270.000
|
$190.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
1,111.000
|
$110.000
|
$105.000
|
$125.000
|
$90.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
2,221.000
|
$115.000
|
$105.000
|
$125.000
|
$90.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
82.000
|
$425.000
|
$400.000
|
$550.000
|
$600.000
|
|
|
RAIL (TY T1W)
|
LF
|
856.000
|
$190.000
|
$180.000
|
$170.000
|
$220.000
|
|
|
RAIL (TY T223)
|
LF
|
310.000
|
$110.000
|
$150.000
|
$140.000
|
$220.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
168.000
|
$110.000
|
$94.000
|
$80.000
|
$100.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$30,000.000
|
$35,000.000
|
$60,000.000
|
$34,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$100,000.000
|
$75,000.000
|
$120,000.000
|
$55,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$265,000.000
|
$90,000.000
|
$310,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$5,000.000
|
$7,500.000
|
$2,500.000
|
$4,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
132.000
|
$30.000
|
$35.000
|
$5.000
|
$37.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
132.000
|
$10.000
|
$14.000
|
$5.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,245.000
|
$3.000
|
$3.250
|
$1.000
|
$2.200
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,245.000
|
$1.000
|
$1.350
|
$1.000
|
$0.750
|
|
|
DRIVEWAYS (CONC)
|
SY
|
69.000
|
$75.000
|
$70.000
|
$60.000
|
$165.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
1,623.000
|
$0.250
|
$2.250
|
$2.000
|
$3.200
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
811.000
|
$0.250
|
$2.250
|
$2.000
|
$5.500
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
650.000
|
$25.000
|
$36.380
|
$30.000
|
$27.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,750.000
|
$2,361.210
|
$1,900.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
875.000
|
$3.000
|
$3.250
|
$2.500
|
$2.200
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$235.000
|
$200.000
|
$200.000
|
$220.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,500.000
|
$4,750.000
|
$2,800.000
|
$2,700.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$325.000
|
$180.990
|
$250.000
|
$220.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$600.000
|
$575.000
|
$800.000
|
$530.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$100.000
|
$379.300
|
$100.000
|
$160.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
28.000
|
$25.000
|
$19.150
|
$30.000
|
$16.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
35.000
|
$35.000
|
$44.670
|
$30.000
|
$40.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
1,900.000
|
$2.000
|
$2.470
|
$2.000
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,260.000
|
$2.000
|
$2.470
|
$2.000
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
158.000
|
$2.000
|
$2.960
|
$2.000
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
1,900.000
|
$2.000
|
$2.470
|
$2.000
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
630.000
|
$2.000
|
$2.470
|
$2.000
|
$2.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
40.000
|
$20.000
|
$19.760
|
$10.000
|
$11.000
|
|
|
TACK COAT
|
GAL
|
942.000
|
$3.000
|
$5.390
|
$2.000
|
$7.800
|
|
|
D-GR HMA TY-C SAC-B PG64-22 (EXEMPT)
|
TON
|
412.000
|
$130.000
|
$140.000
|
$118.000
|
$225.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$6,000.000
|
$30,000.000
|
$10,000.000
|
|
Totals: |
$2,910,759.500
|
$2,816,412.460
|
$3,336,527.500
|
$3,407,720.650
|