PREPARING ROW(TREE)(12" TO 24" DIA)
|
EA
|
12.000
|
$1,000.000
|
$1,120.000
|
$1,000.000
|
$1,100.000
|
$1,000.000
|
$1,000.000
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
2.000
|
$1,500.000
|
$1,880.000
|
$2,000.000
|
$1,500.000
|
$1,250.000
|
$2,700.000
|
|
|
PREP ROW (TREE) (2" TO 12" DIA)
|
EA
|
56.000
|
$500.000
|
$790.000
|
$500.000
|
$300.000
|
$1,000.000
|
$700.000
|
|
|
PREPARING ROW (TREE) (36" TO 48" DIA)
|
EA
|
2.000
|
$3,000.000
|
$3,600.000
|
$3,500.000
|
$4,350.000
|
$1,500.000
|
$3,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
148.000
|
$40.000
|
$150.000
|
$20.000
|
$45.000
|
$50.000
|
$21.540
|
|
|
REMOVING STAB BASE AND ASPH PAV(15")
|
SY
|
977.000
|
$15.000
|
$22.600
|
$25.000
|
$25.000
|
$25.000
|
$42.660
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,117.000
|
$35.000
|
$18.750
|
$25.000
|
$44.000
|
$50.000
|
$21.410
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
6,144.000
|
$38.000
|
$34.600
|
$38.000
|
$44.000
|
$50.000
|
$37.380
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
9.150
|
$1,000.000
|
$925.000
|
$900.000
|
$845.000
|
$900.000
|
$1,418.840
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
9.150
|
$800.000
|
$810.000
|
$900.000
|
$740.000
|
$800.000
|
$1,221.540
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
7,359.000
|
$3.000
|
$2.000
|
$2.750
|
$2.150
|
$2.500
|
$2.330
|
|
|
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")
|
SY
|
1,597.000
|
$60.000
|
$47.500
|
$55.000
|
$41.150
|
$50.000
|
$69.140
|
|
|
CEMENT
|
TON
|
18.000
|
$280.000
|
$300.000
|
$350.000
|
$370.000
|
$300.000
|
$281.100
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
1,597.000
|
$14.000
|
$7.500
|
$20.000
|
$11.250
|
$20.000
|
$34.080
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
399.000
|
$9.000
|
$9.000
|
$20.000
|
$10.400
|
$8.000
|
$8.780
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
1,480.000
|
$6.000
|
$14.000
|
$14.000
|
$16.650
|
$20.000
|
$17.960
|
|
|
CEM STABIL BKFL
|
CY
|
484.000
|
$290.000
|
$255.000
|
$250.000
|
$230.000
|
$500.000
|
$322.760
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,237.000
|
$75.000
|
$107.000
|
$20.000
|
$145.000
|
$65.000
|
$68.770
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
3,640.000
|
$5.000
|
$122.000
|
$20.000
|
$50.000
|
$45.000
|
$93.780
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
236.000
|
$200.000
|
$140.000
|
$140.000
|
$120.000
|
$100.000
|
$118.680
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
3,364.000
|
$490.000
|
$355.000
|
$350.000
|
$325.000
|
$300.000
|
$310.440
|
|
|
CL B CONC (FLUME)
|
CY
|
12.700
|
$850.000
|
$780.000
|
$2,000.000
|
$1,010.000
|
$2,000.000
|
$4,180.100
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
135.700
|
$1,650.000
|
$1,490.000
|
$2,000.000
|
$1,550.000
|
$2,000.000
|
$3,463.180
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
185.400
|
$2,000.000
|
$1,485.000
|
$2,000.000
|
$1,975.000
|
$2,000.000
|
$3,093.020
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
61.800
|
$2,000.000
|
$2,145.000
|
$2,000.000
|
$1,975.000
|
$2,000.000
|
$3,361.850
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
46,200.000
|
$42.000
|
$38.500
|
$40.000
|
$43.600
|
$37.000
|
$59.800
|
|
|
APPROACH SLAB (HPC)
|
CY
|
131.700
|
$1,000.000
|
$1,100.000
|
$1,500.000
|
$975.000
|
$2,000.000
|
$2,030.900
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
5,370.000
|
$275.000
|
$290.000
|
$350.000
|
$255.000
|
$250.000
|
$376.730
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
597.500
|
$300.000
|
$390.000
|
$350.000
|
$335.000
|
$360.000
|
$462.660
|
|
|
EPOXY WATERPROOF FINISH (TY X)
|
SF
|
2,863.000
|
$45.000
|
$13.500
|
$15.000
|
$10.500
|
$15.000
|
$14.760
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
70.000
|
$850.000
|
$895.000
|
$850.000
|
$650.000
|
$1,000.000
|
$650.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
510.000
|
$250.000
|
$220.000
|
$210.000
|
$140.000
|
$250.000
|
$93.100
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
3.000
|
$1,000.000
|
$850.000
|
$850.000
|
$740.000
|
$700.000
|
$4,731.760
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
2,182.000
|
$175.000
|
$180.000
|
$160.000
|
$215.000
|
$125.000
|
$294.530
|
|
|
HEADER TYPE EXPANSION JOINT
|
LF
|
317.000
|
$230.000
|
$135.000
|
$280.000
|
$185.000
|
$150.000
|
$251.610
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
142.000
|
$270.000
|
$450.000
|
$380.000
|
$280.000
|
$500.000
|
$334.750
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$200,000.000
|
$100,000.000
|
$75,000.000
|
$396,000.000
|
$450,000.000
|
$50,053.370
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
1.000
|
$350,000.000
|
$265,000.000
|
$400,000.000
|
$950,000.000
|
$1,300,000.000
|
$219,678.300
|
|
|
REMOV STR (SMALL)
|
EA
|
8.000
|
$1,000.000
|
$2,500.000
|
$2,000.000
|
$820.000
|
$1,000.000
|
$665.080
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
3,490.000
|
$5.000
|
$3.300
|
$5.000
|
$3.700
|
$2.000
|
$3.000
|
|
|
REMOV STR (TIMBER PILING)
|
EA
|
9.000
|
$500.000
|
$2,500.000
|
$1,000.000
|
$825.000
|
$900.000
|
$787.610
|
|
|
REMOV STR (TOP OF WALL)
|
LF
|
90.000
|
$55.000
|
$200.000
|
$100.000
|
$85.000
|
$50.000
|
$172.400
|
|
|
REMOVING ROCK RIPRAP
|
LF
|
165.000
|
$110.000
|
$75.000
|
$100.000
|
$45.000
|
$50.000
|
$28.430
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$875,000.000
|
$1,130,000.000
|
$1,200,000.000
|
$1,200,000.000
|
$1,200,000.000
|
$1,312,859.580
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$35,000.000
|
$4,000.000
|
$3,500.000
|
$57,000.000
|
$40,000.000
|
$35,250.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$65.000
|
$75.000
|
$80.000
|
$85.000
|
$70.000
|
$65.620
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$13.000
|
$30.000
|
$10.000
|
$15.000
|
$30.000
|
$26.620
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
3,800.000
|
$6.000
|
$3.000
|
$5.000
|
$7.000
|
$3.000
|
$5.570
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,800.000
|
$2.500
|
$1.000
|
$1.300
|
$3.350
|
$1.000
|
$1.220
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,047.000
|
$110.000
|
$145.000
|
$145.000
|
$150.000
|
$200.000
|
$85.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
8.000
|
$8,000.000
|
$5,000.000
|
$5,000.000
|
$10,000.000
|
$3,100.000
|
$8,000.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
1,200.000
|
$28.000
|
$25.000
|
$55.000
|
$27.000
|
$20.000
|
$41.870
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
1,200.000
|
$25.000
|
$23.000
|
$35.000
|
$27.000
|
$20.000
|
$41.130
|
|
|
DRIVEWAYS (ACP)
|
SY
|
49.000
|
$50.000
|
$160.000
|
$75.000
|
$150.000
|
$150.000
|
$96.940
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
900.000
|
$40.000
|
$34.000
|
$45.000
|
$34.850
|
$33.000
|
$37.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$3,000.000
|
$2,480.000
|
$2,000.000
|
$2,955.000
|
$2,800.000
|
$2,745.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,030.000
|
$4.000
|
$2.250
|
$8.000
|
$3.200
|
$3.000
|
$3.100
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$350.000
|
$236.000
|
$350.000
|
$320.000
|
$300.000
|
$355.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,500.000
|
$3,570.000
|
$3,200.000
|
$3,460.000
|
$3,275.000
|
$3,380.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$310.000
|
$235.000
|
$500.000
|
$320.000
|
$300.000
|
$320.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,600.000
|
$1,150.000
|
$2,000.000
|
$2,100.000
|
$2,000.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$12,400.000
|
$12,000.000
|
$8,000.000
|
$7,500.000
|
$10,000.000
|
|
|
GATE (REMOVE)
|
EA
|
1.000
|
$550.000
|
$1,000.000
|
$300.000
|
$1,055.000
|
$1,000.000
|
$750.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
4,515.000
|
$20.000
|
$20.000
|
$18.000
|
$21.100
|
$20.000
|
$33.700
|
|
|
GATE (TY 1)
|
EA
|
6.000
|
$2,500.000
|
$2,600.000
|
$2,000.000
|
$2,640.000
|
$2,500.000
|
$5,330.800
|
|
|
CORNER OR PULL POST AM(REM/REP)(METAL)
|
EA
|
19.000
|
$760.000
|
$1,500.000
|
$750.000
|
$1,320.000
|
$1,250.000
|
$8,908.380
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$1,150.000
|
$1,092.000
|
$1,000.000
|
$975.000
|
$925.000
|
$900.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$150.000
|
$100.000
|
$150.000
|
$105.000
|
$100.000
|
$125.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
26.000
|
$20.000
|
$47.000
|
$35.000
|
$37.000
|
$35.000
|
$30.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
14.000
|
$40.000
|
$23.000
|
$5.000
|
$16.000
|
$15.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
27.000
|
$50.000
|
$47.000
|
$35.000
|
$48.000
|
$45.000
|
$40.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
10,465.000
|
$1.600
|
$1.250
|
$1.500
|
$2.100
|
$1.220
|
$2.040
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
2,000.000
|
$0.200
|
$0.300
|
$0.500
|
$0.550
|
$0.290
|
$0.510
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
2,000.000
|
$0.200
|
$0.300
|
$0.500
|
$0.550
|
$0.290
|
$0.510
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
5,316.000
|
$1.400
|
$2.000
|
$2.000
|
$2.100
|
$1.750
|
$2.040
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
5,316.000
|
$1.400
|
$2.000
|
$2.000
|
$2.100
|
$1.750
|
$2.040
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
650.000
|
$1.500
|
$1.100
|
$1.300
|
$12.700
|
$1.000
|
$12.240
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
4,000.000
|
$0.200
|
$0.250
|
$0.400
|
$2.100
|
$0.220
|
$2.040
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
939.000
|
$215.000
|
$239.000
|
$290.000
|
$250.000
|
$225.000
|
$243.880
|
|
|
TACK COAT
|
GAL
|
901.000
|
$6.000
|
$9.500
|
$20.000
|
$9.000
|
$15.000
|
$9.690
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
4.000
|
$1,000.000
|
$700.000
|
$500.000
|
$450.000
|
$2,000.000
|
$247.970
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$20,000.000
|
$9,500.000
|
$20,000.000
|
$15,000.000
|
$20,000.000
|
$14,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
2.000
|
$500.000
|
$590.000
|
$500.000
|
$350.000
|
$1,500.000
|
$7,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
8.000
|
$100.000
|
$235.000
|
$150.000
|
$95.000
|
$95.000
|
$1,500.000
|
|
Totals: |
$10,968,220.800
|
$10,425,012.350
|
$10,842,795.750
|
$12,203,646.700
|
$12,276,727.800
|
$13,396,526.331
|