REMOVING CONCRETE(MOW STRIP)
|
LF
|
12,499.000
|
$11.000
|
$11.000
|
$5.500
|
$9.400
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
17.000
|
$100.000
|
$453.000
|
$805.000
|
$253.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
70,339.000
|
$4.000
|
$4.000
|
$3.400
|
$3.660
|
|
|
PLANE ASPH CONC PAV (0" TO 3/4")
|
SY
|
15,804.000
|
$4.000
|
$2.650
|
$4.850
|
$3.660
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
20,796.000
|
$15.000
|
$9.500
|
$8.800
|
$32.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
702.000
|
$600.000
|
$495.000
|
$495.000
|
$800.000
|
|
|
STR STEEL (NBIS)
|
LB
|
981.000
|
$15.000
|
$30.000
|
$31.000
|
$15.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
9,161.000
|
$250.000
|
$178.000
|
$192.000
|
$235.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
22.000
|
$2,600.000
|
$1,600.000
|
$1,600.000
|
$1,750.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,102,693.000
|
$1,300,000.000
|
$1,375,000.000
|
$1,191,713.590
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$7,500.000
|
$11,500.000
|
$4,500.000
|
$7,121.140
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,585.000
|
$4.200
|
$5.500
|
$3.000
|
$6.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,585.000
|
$2.400
|
$2.850
|
$1.000
|
$1.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
22,170.000
|
$45.000
|
$35.000
|
$35.000
|
$34.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
64,530.000
|
$7.300
|
$6.000
|
$6.500
|
$11.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
480.000
|
$11.000
|
$20.000
|
$21.000
|
$18.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
21,690.000
|
$25.000
|
$20.000
|
$21.000
|
$15.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
319,395.000
|
$0.200
|
$0.100
|
$0.140
|
$0.080
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
7,811.000
|
$28.000
|
$28.100
|
$24.000
|
$26.430
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
38.000
|
$2,500.000
|
$2,400.000
|
$2,600.000
|
$2,695.780
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
12.000
|
$1,100.000
|
$1,403.000
|
$1,600.000
|
$1,196.950
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
10,682.000
|
$3.500
|
$4.000
|
$1.000
|
$2.120
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
36.000
|
$3,500.000
|
$370.000
|
$2,900.000
|
$3,029.440
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
48.000
|
$350.000
|
$261.000
|
$190.000
|
$317.770
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
27.000
|
$2,000.000
|
$900.000
|
$880.000
|
$1,461.760
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
9.000
|
$1,350.000
|
$800.000
|
$880.000
|
$773.250
|
|
|
CRASH CUSH ATTEN (INSTL) (S) (TL3)
|
EA
|
9.000
|
$15,000.000
|
$7,500.000
|
$9,000.000
|
$8,156.190
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
343.000
|
$25.000
|
$50.000
|
$22.000
|
$42.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
10,764.000
|
$1.000
|
$0.600
|
$0.750
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
107,610.000
|
$1.400
|
$0.300
|
$0.650
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
43,055.000
|
$1.400
|
$0.300
|
$0.650
|
$0.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
13,209.000
|
$2.500
|
$1.700
|
$1.750
|
$1.690
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
26.000
|
$3.500
|
$1.700
|
$1.600
|
$1.690
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,508.000
|
$1.000
|
$0.620
|
$1.600
|
$0.620
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
42,700.000
|
$0.400
|
$0.320
|
$0.250
|
$0.320
|
|
REFL PAV MRK TY II (W) 6" (DOT)
|
LF
|
1,508.000
|
$0.750
|
$0.320
|
$0.700
|
$0.320
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
171,913.000
|
$0.400
|
$0.320
|
$0.200
|
$0.320
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
6,680.000
|
$0.750
|
$0.480
|
$0.450
|
$0.480
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
958.000
|
$4.000
|
$2.000
|
$1.450
|
$2.000
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
171,064.000
|
$0.500
|
$0.320
|
$0.200
|
$0.320
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
42,700.000
|
$1.000
|
$0.660
|
$0.650
|
$0.660
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
171,913.000
|
$0.900
|
$0.660
|
$0.600
|
$0.660
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
171,064.000
|
$1.000
|
$0.660
|
$0.650
|
$0.660
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)1X
|
LF
|
6,680.000
|
$0.900
|
$1.000
|
$1.000
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
958.000
|
$8.000
|
$6.000
|
$9.000
|
$6.000
|
|
PREFAB PAV MRK TY C (W) (SYMBOL)
|
EA
|
7.000
|
$600.000
|
$500.000
|
$2,350.000
|
$500.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,469.000
|
$5.000
|
$5.000
|
$5.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
161,429.000
|
$2.000
|
$0.550
|
$0.600
|
$0.550
|
|
|
STRIP MOWING
|
AC
|
658.000
|
$50.000
|
$100.000
|
$140.000
|
$85.000
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
8.320
|
$12,000.000
|
$3,600.000
|
$5,875.000
|
$6,050.000
|
|
|
TBWC (MEMBRANE)
|
GAL
|
151,810.000
|
$4.500
|
$4.000
|
$3.850
|
$4.210
|
|
|
TBWC PG76-22 SAC-A TY C
|
TON
|
37,953.000
|
$200.000
|
$169.000
|
$175.000
|
$167.500
|
|
|
FILLING MILLED ASPHALT RUMBLE STRIPS
|
LF
|
57,150.000
|
$5.000
|
$3.250
|
$2.500
|
$3.220
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$13,000.000
|
$15,200.000
|
$13,000.000
|
$12,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
302.000
|
$250.000
|
$200.000
|
$220.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
64.000
|
$100.000
|
$100.000
|
$160.000
|
$100.000
|
|
Totals: |
$17,609,534.400
|
$14,385,828.180
|
$14,709,305.400
|
$15,636,699.060
|