|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
3,155.000
|
$60.000
|
$10.500
|
$16.900
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
168.000
|
$240.000
|
$250.000
|
$494.500
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
7.400
|
$2,829.750
|
$1,000.000
|
$646.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,052.000
|
$600.000
|
$500.000
|
$522.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
4,919.000
|
$500.000
|
$200.000
|
$219.100
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
23.000
|
$800.000
|
$1,751.750
|
$1,685.700
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,404,290.000
|
$1,305,513.990
|
$1,160,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$10,000.000
|
$3,900.000
|
$18,650.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,210.000
|
$8.000
|
$4.500
|
$3.200
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,210.000
|
$2.000
|
$0.500
|
$1.900
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
10,470.000
|
$90.000
|
$38.000
|
$45.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
31,230.000
|
$8.000
|
$18.000
|
$16.900
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
150.000
|
$13.000
|
$16.000
|
$33.700
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
10,470.000
|
$14.000
|
$18.000
|
$22.500
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
112,820.000
|
$0.200
|
$0.130
|
$0.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
5,663.000
|
$30.000
|
$25.770
|
$27.400
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
27.000
|
$1,800.000
|
$2,840.090
|
$1,693.800
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,500.000
|
$1,893.390
|
$1,267.100
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,663.000
|
$2.000
|
$1.580
|
$4.200
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
24.000
|
$3,300.000
|
$2,997.870
|
$2,846.800
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
24.000
|
$600.000
|
$210.380
|
$162.300
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
18.000
|
$1,000.000
|
$1,636.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,050.000
|
$1,000.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (INSTL) (S) (TL3)
|
EA
|
6.000
|
$16,000.000
|
$8,000.000
|
$8,430.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
20,940.000
|
$2.000
|
$0.380
|
$1.300
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
41,880.000
|
$2.000
|
$0.380
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
20,940.000
|
$2.000
|
$0.380
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
10,440.000
|
$2.000
|
$1.630
|
$1.700
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
810.000
|
$2.000
|
$1.630
|
$1.700
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
46,200.000
|
$0.360
|
$0.320
|
$0.350
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
275,861.000
|
$0.280
|
$0.320
|
$0.300
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
10,339.000
|
$0.280
|
$0.480
|
$0.450
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
184,809.000
|
$0.280
|
$0.320
|
$0.300
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
46,206.000
|
$0.800
|
$0.660
|
$0.700
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
275,861.000
|
$0.800
|
$0.600
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
184,809.000
|
$0.800
|
$0.600
|
$0.700
|
|
PREFAB PAV MRK TY C (W) (8") (DOT)
|
LF
|
301.000
|
$0.280
|
$20.000
|
$3.900
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,310.000
|
$4.000
|
$5.000
|
$5.600
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
83,760.000
|
$1.000
|
$0.500
|
$0.600
|
|
|
STRIP MOWING
|
AC
|
136.700
|
$30.000
|
$125.000
|
$80.000
|
|
|
TREE TRIMMING AND BRUSH REMOVAL
|
LF
|
2,480.000
|
$100.000
|
$9.240
|
$9.000
|
|
|
TBWC (MEMBRANE)
|
GAL
|
164,143.000
|
$5.000
|
$3.540
|
$4.800
|
|
|
TBWC PG76-22 SAC-A TY C
|
TON
|
41,070.000
|
$155.000
|
$164.500
|
$193.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,188.000
|
$100.000
|
$50.220
|
$100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,188.000
|
$150.000
|
$200.880
|
$360.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
108.000
|
$320.000
|
$90.400
|
$200.000
|
|
|
SOLAR POWERED LED ROADWAY LUM ASSEM
|
EA
|
21.000
|
$14,500.000
|
$10,500.000
|
$12,080.000
|
|
Totals: |
$15,649,345.750
|
$13,060,729.290
|
$15,076,811.050
|