|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
2,250.000
|
$10.000
|
$10.000
|
$7.230
|
$8.450
|
|
|
BACKFILL (TY A OR B)
|
STA
|
649.000
|
$90.000
|
$100.000
|
$91.500
|
$153.000
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
3,423.000
|
$95.000
|
$50.000
|
$76.850
|
$95.000
|
|
|
ASPH (AC-15P OR AC-20-5TR)
|
GAL
|
131,738.000
|
$2.500
|
$3.300
|
$3.100
|
$2.350
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
41,602.000
|
$110.000
|
$100.000
|
$102.060
|
$117.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
1,602.000
|
$30.000
|
$36.000
|
$35.600
|
$43.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
11,672.000
|
$30.000
|
$23.000
|
$28.870
|
$32.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
3,019.000
|
$25.000
|
$27.000
|
$21.460
|
$21.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
3,713.000
|
$1.000
|
$2.400
|
$2.670
|
$2.250
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
614.000
|
$1.500
|
$5.000
|
$2.670
|
$3.400
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
26,638.000
|
$1.500
|
$1.600
|
$1.440
|
$2.250
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
3,019.000
|
$1.500
|
$3.300
|
$2.670
|
$3.400
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
100.000
|
$400.000
|
$540.000
|
$525.000
|
$515.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
1,444.000
|
$20.000
|
$22.000
|
$19.470
|
$30.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
12.000
|
$1,000.000
|
$2,000.000
|
$1,100.000
|
$1,810.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$440,000.000
|
$250,000.000
|
$561,216.470
|
$198,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$3,000.000
|
$8,300.000
|
$1,728.440
|
$1,830.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
960.000
|
$3.000
|
$3.000
|
$3.000
|
$2.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
960.000
|
$1.000
|
$0.500
|
$0.500
|
$1.050
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
96.000
|
$5.000
|
$4.500
|
$4.540
|
$3.050
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
96.000
|
$1.000
|
$2.000
|
$2.000
|
$1.050
|
|
|
DRIVEWAYS (ACP)
|
SY
|
7,857.000
|
$50.000
|
$28.000
|
$16.990
|
$29.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
132,626.000
|
$0.150
|
$0.140
|
$0.170
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
62,021.000
|
$0.150
|
$0.170
|
$0.170
|
$0.250
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,350.000
|
$25.000
|
$21.000
|
$20.200
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$1,700.000
|
$2,300.000
|
$1,873.000
|
$1,890.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,250.000
|
$3.000
|
$1.000
|
$1.000
|
$1.200
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$120.000
|
$160.000
|
$150.000
|
$11.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$2,500.000
|
$2,900.000
|
$2,745.000
|
$2,810.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
12.000
|
$350.000
|
$160.000
|
$150.000
|
$58.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
22.000
|
$25.000
|
$14.000
|
$13.000
|
$16.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
68.000
|
$25.000
|
$14.000
|
$13.000
|
$16.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
26.000
|
$70.000
|
$45.000
|
$44.070
|
$42.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
194.000
|
$0.250
|
$0.360
|
$0.350
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
226.000
|
$0.500
|
$0.330
|
$0.320
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
280.000
|
$0.250
|
$0.360
|
$0.350
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
15,568.000
|
$0.250
|
$0.340
|
$0.330
|
$0.350
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
10.000
|
$3.000
|
$3.600
|
$3.500
|
$3.700
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
195.000
|
$3.000
|
$3.600
|
$3.500
|
$3.700
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,853.000
|
$1.000
|
$0.700
|
$1.760
|
$1.100
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,645.000
|
$1.000
|
$0.700
|
$1.760
|
$1.100
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
1,085.000
|
$0.500
|
$0.330
|
$0.320
|
$0.350
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
8,073.000
|
$0.500
|
$0.630
|
$0.600
|
$0.650
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
6,856.000
|
$0.150
|
$0.140
|
$0.140
|
$0.150
|
|
REFL PAV MRK TY II (W) 4" (DOT)
|
LF
|
1,085.000
|
$0.500
|
$0.160
|
$0.160
|
$0.150
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
127,371.000
|
$0.150
|
$0.140
|
$0.140
|
$0.150
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
8,073.000
|
$0.300
|
$0.290
|
$0.280
|
$0.300
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
6,079.000
|
$0.150
|
$0.140
|
$0.140
|
$0.150
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
140,228.000
|
$0.150
|
$0.140
|
$0.140
|
$0.150
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
6,856.000
|
$0.250
|
$0.310
|
$0.300
|
$0.300
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
127,371.000
|
$0.250
|
$0.290
|
$0.280
|
$0.300
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
6,079.000
|
$0.250
|
$0.310
|
$0.300
|
$0.300
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
140,228.000
|
$0.250
|
$0.290
|
$0.280
|
$0.300
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
126.000
|
$5.500
|
$6.700
|
$6.500
|
$6.900
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
804.000
|
$10.500
|
$13.000
|
$12.500
|
$13.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
94.000
|
$185.000
|
$180.000
|
$170.000
|
$180.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
6.000
|
$400.000
|
$500.000
|
$500.000
|
$529.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
38.000
|
$250.000
|
$250.000
|
$240.000
|
$254.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
4.000
|
$600.000
|
$530.000
|
$525.000
|
$556.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
62.000
|
$25.000
|
$23.000
|
$22.000
|
$23.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
433.000
|
$2.500
|
$2.900
|
$2.750
|
$2.900
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
305.000
|
$2.500
|
$2.900
|
$2.750
|
$2.900
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
4.000
|
$18,000.000
|
$23,500.000
|
$10,500.000
|
$7,940.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
272.000
|
$75.000
|
$80.000
|
$59.540
|
$63.000
|
|
|
TMA (STATIONARY)
|
DAY
|
200.000
|
$100.000
|
$200.000
|
$200.000
|
$10.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
60.000
|
$50.000
|
$30.000
|
$100.000
|
$10.000
|
|
Totals: |
$7,202,041.050
|
$6,451,354.780
|
$6,740,732.380
|
$7,159,514.650
|