PREPARING ROW
|
STA
|
5.100
|
$5,000.000
|
$15,614.760
|
$14,500.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
514.000
|
$10.000
|
$16.180
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
241.000
|
$50.000
|
$44.330
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,621.000
|
$50.000
|
$28.910
|
$45.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
1,713.000
|
$8.000
|
$8.030
|
$15.000
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
1,713.000
|
$6.500
|
$4.260
|
$5.000
|
|
|
STRAW/HAY MLCH SEED(TEMP)(WARM)
|
SY
|
857.000
|
$1.500
|
$1.160
|
$5.000
|
|
|
STRAW/HAY MLCH SEED(TEMP)(COOL)
|
SY
|
857.000
|
$2.000
|
$1.160
|
$5.000
|
|
|
VEGETATIVE WATERING
|
MG
|
74.000
|
$50.000
|
$67.550
|
$200.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
187.000
|
$145.000
|
$177.040
|
$175.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
187.000
|
$15.000
|
$12.490
|
$33.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
310.000
|
$15.000
|
$7.920
|
$23.000
|
|
|
ASPH(AC-15P, HFRS-2P OR CRS-2P)
|
GAL
|
255.000
|
$10.000
|
$8.520
|
$25.000
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
8.000
|
$500.000
|
$679.910
|
$2,730.000
|
|
|
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
|
CY
|
10.000
|
$500.000
|
$543.920
|
$2,268.000
|
|
|
CEM STABIL BKFL
|
CY
|
78.000
|
$200.000
|
$211.180
|
$210.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
841.000
|
$50.000
|
$61.610
|
$46.000
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
2.000
|
$75,000.000
|
$9,001.820
|
$21,000.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
411.000
|
$750.000
|
$821.860
|
$1,150.000
|
|
|
CL C CONC (ABUT)
|
CY
|
38.000
|
$1,200.000
|
$1,154.800
|
$1,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
22.200
|
$1,300.000
|
$2,406.960
|
$1,800.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
19.000
|
$1,500.000
|
$1,630.380
|
$1,200.000
|
|
|
REINF CONC SLAB
|
SF
|
5,070.000
|
$25.000
|
$28.390
|
$35.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
774.000
|
$150.000
|
$193.070
|
$215.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
253.000
|
$185.000
|
$195.110
|
$175.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
13.600
|
$550.000
|
$970.870
|
$1,300.000
|
|
|
RAIL (TY T223)
|
LF
|
438.000
|
$102.000
|
$170.560
|
$200.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
50.000
|
$180.000
|
$138.640
|
$275.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$78,000.000
|
$48,373.660
|
$90,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$150,000.000
|
$193,525.680
|
$208,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$5,000.000
|
$508.960
|
$1,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
90.000
|
$65.000
|
$37.830
|
$75.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
90.000
|
$25.000
|
$11.580
|
$25.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
111.000
|
$25.000
|
$27.130
|
$75.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
111.000
|
$10.000
|
$8.750
|
$25.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,060.000
|
$4.000
|
$3.770
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,060.000
|
$1.500
|
$1.140
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
45.000
|
$50.000
|
$173.080
|
$50.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
40.000
|
$40.000
|
$68.260
|
$90.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$50.000
|
$50.380
|
$45.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
40.000
|
$15.000
|
$39.790
|
$90.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$20.000
|
$37.040
|
$45.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
4.000
|
$1,807.500
|
$1,798.820
|
$2,420.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,800.000
|
$3,893.570
|
$4,290.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$750.000
|
$844.480
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$65.000
|
$167.230
|
$250.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
4.000
|
$50.000
|
$103.070
|
$60.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
4.000
|
$50.000
|
$103.070
|
$60.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,020.000
|
$3.300
|
$4.300
|
$3.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
13.000
|
$5.500
|
$20.080
|
$5.750
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
390.000
|
$1.100
|
$1.300
|
$0.580
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
3.000
|
$5,000.000
|
$3,862.470
|
$5,775.000
|
|
|
TEMP CONSTRUCTION ACCESS
|
LS
|
1.000
|
$75,000.000
|
$44,929.790
|
$475,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
14.000
|
$300.000
|
$184.190
|
$220.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1.000
|
$350.000
|
$1,353.030
|
$515.000
|
|
Totals: |
$1,603,810.500
|
$1,589,266.910
|
$2,399,267.950
|