PREPARING ROW
|
AC
|
1.000
|
$10,000.000
|
$25,000.000
|
$6,500.000
|
$13,200.000
|
$150,000.000
|
|
|
PREPARING ROW(TREE)(12" TO 24" DIA)
|
EA
|
1.000
|
$2,000.000
|
$5,000.000
|
$1,000.000
|
$2,750.000
|
$5,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
51.000
|
$35.000
|
$52.000
|
$40.000
|
$187.760
|
$100.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
46.000
|
$30.000
|
$52.000
|
$40.000
|
$20.820
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
41.000
|
$32.000
|
$52.000
|
$40.000
|
$23.360
|
$20.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
707.000
|
$15.000
|
$15.000
|
$15.000
|
$13.540
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
362.000
|
$18.000
|
$18.000
|
$15.000
|
$23.730
|
$20.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
205.000
|
$5.000
|
$6.000
|
$12.500
|
$41.910
|
$10.000
|
|
|
BLOCK SODDING
|
SY
|
205.000
|
$7.000
|
$10.000
|
$9.500
|
$13.200
|
$10.000
|
|
|
VEGETATIVE WATERING
|
MG
|
4.000
|
$50.000
|
$100.000
|
$0.010
|
$1.100
|
$1,000.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
807.000
|
$85.000
|
$50.000
|
$110.000
|
$115.500
|
$135.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
77.000
|
$25.000
|
$25.000
|
$25.000
|
$1.100
|
$10.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
40.000
|
$600.000
|
$500.000
|
$247.500
|
$247.500
|
$100.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
2.000
|
$2,500.000
|
$500.000
|
$1,500.000
|
$1,650.000
|
$1,500.000
|
|
|
CL C CONC (MISC)
|
CY
|
9.600
|
$700.000
|
$350.000
|
$850.000
|
$814.420
|
$5,000.000
|
|
|
CL A CONC (STEPS)
|
CY
|
3.000
|
$1,000.000
|
$300.000
|
$2,500.000
|
$814.420
|
$5,000.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
18.900
|
$800.000
|
$300.000
|
$750.000
|
$814.420
|
$750.000
|
|
|
RAIL (HANDRAIL)(TY A)
|
LF
|
50.000
|
$200.000
|
$235.000
|
$123.200
|
$247.500
|
$200.000
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
211.000
|
$200.000
|
$175.000
|
$104.500
|
$247.500
|
$200.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
59.000
|
$250.000
|
$180.000
|
$159.790
|
$275.000
|
$300.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
8.000
|
$550.000
|
$498.000
|
$571.200
|
$495.000
|
$350.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$7,000.000
|
$14,400.000
|
$7,552.000
|
$13,750.000
|
$12,500.000
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
1.000
|
$15,500.000
|
$21,600.000
|
$12,325.000
|
$17,050.000
|
$15,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
2.000
|
$7,750.000
|
$12,870.000
|
$7,638.600
|
$17,050.000
|
$15,000.000
|
|
|
INLET (CURB)(SPL)
|
EA
|
2.000
|
$1,000.000
|
$2,000.000
|
$1,100.000
|
$17,050.000
|
$12,500.000
|
|
|
GRATE & FRAME
|
EA
|
44.000
|
$1,800.000
|
$1,200.000
|
$2,250.000
|
$5,485.540
|
$10,000.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
10.000
|
$1,600.000
|
$4,256.000
|
$500.000
|
$957.600
|
$1,100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$94,600.000
|
$65,000.000
|
$138,100.000
|
$214,688.660
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$5,000.000
|
$3,000.000
|
$8,500.000
|
$4,950.000
|
$8,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
500.000
|
$9.000
|
$8.000
|
$0.010
|
$1.100
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
500.000
|
$3.000
|
$3.000
|
$0.010
|
$1.100
|
$9.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
6.000
|
$200.000
|
$500.000
|
$660.800
|
$165.000
|
$500.000
|
|
|
CONC CURB (TY I)
|
LF
|
6.000
|
$30.000
|
$28.000
|
$27.530
|
$60.440
|
$150.000
|
|
|
CONC CURB (TY II)
|
LF
|
543.000
|
$45.000
|
$28.000
|
$28.500
|
$60.440
|
$100.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
46.000
|
$35.000
|
$28.000
|
$39.070
|
$60.440
|
$150.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,100.000
|
$50.000
|
$30.000
|
$42.000
|
$51.620
|
$150.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
168.000
|
$115.000
|
$75.000
|
$135.000
|
$140.900
|
$150.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5.000
|
$110.000
|
$75.000
|
$135.000
|
$93.610
|
$85.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
518.000
|
$100.000
|
$75.000
|
$118.710
|
$110.850
|
$65.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
73.000
|
$165.000
|
$250.000
|
$185.000
|
$166.850
|
$325.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
54.000
|
$165.000
|
$250.000
|
$185.000
|
$166.850
|
$325.000
|
|
|
CURB RAMPS (TY 3)
|
SY
|
120.000
|
$165.000
|
$250.000
|
$185.000
|
$166.850
|
$325.000
|
|
|
CURB RAMPS (TY 6)
|
SY
|
17.000
|
$165.000
|
$250.000
|
$185.000
|
$141.660
|
$325.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
70.000
|
$165.000
|
$250.000
|
$185.000
|
$141.660
|
$325.000
|
|
|
CURB RAMPS (TY 21)
|
SY
|
15.000
|
$165.000
|
$250.000
|
$185.000
|
$141.660
|
$325.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
285.000
|
$230.000
|
$175.000
|
$255.000
|
$272.940
|
$150.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
885.000
|
$20.000
|
$24.000
|
$16.500
|
$16.500
|
$20.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
229.000
|
$40.000
|
$42.000
|
$44.000
|
$44.000
|
$60.000
|
|
|
CONDT (PVC) (SCH 40) (6")
|
LF
|
1,431.000
|
$50.000
|
$33.750
|
$29.700
|
$29.700
|
$85.000
|
|
|
CONDT (PVC) (SCH 40) (6") (BORE)
|
LF
|
320.000
|
$70.000
|
$72.000
|
$66.000
|
$66.000
|
$120.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
19.000
|
$1,100.000
|
$1,500.000
|
$1,210.000
|
$1,210.000
|
$1,500.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
1.000
|
$1,300.000
|
$2,340.000
|
$1,320.000
|
$1,320.000
|
$1,500.000
|
|
|
REMOVE GROUND BOX
|
EA
|
6.000
|
$250.000
|
$570.000
|
$698.500
|
$698.500
|
$200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$850.000
|
$1,500.000
|
$764.500
|
$385.000
|
$1,500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
17.000
|
$650.000
|
$250.000
|
$792.000
|
$385.000
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$150.000
|
$100.000
|
$99.000
|
$55.000
|
$500.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
95.000
|
$1.000
|
$4.800
|
$2.990
|
$4.400
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,494.000
|
$15.000
|
$19.200
|
$6.220
|
$17.600
|
$20.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
8.000
|
$35.000
|
$42.000
|
$71.500
|
$38.500
|
$500.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
199.000
|
$1.000
|
$2.400
|
$2.260
|
$2.200
|
$10.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$200.000
|
$240.000
|
$302.500
|
$220.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$300.000
|
$300.000
|
$385.000
|
$275.000
|
$250.000
|
|
PRE PM TY C (ACC PRK)(WHT)(SYMBL ONLY)
|
EA
|
2.000
|
$650.000
|
$360.000
|
$495.000
|
$330.000
|
$500.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
271.000
|
$1.000
|
$0.420
|
$0.500
|
$0.390
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
101.000
|
$2.000
|
$0.720
|
$0.570
|
$0.660
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
650.000
|
$2.000
|
$1.020
|
$0.670
|
$0.940
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
197.000
|
$5.000
|
$4.800
|
$1.450
|
$4.400
|
$20.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
1.000
|
$90.000
|
$90.000
|
$71.500
|
$82.500
|
$250.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
1.000
|
$120.000
|
$90.000
|
$82.500
|
$82.500
|
$250.000
|
|
|
ELIM EXT PAV MRK & MRKS (SYMBOL)
|
EA
|
1.000
|
$150.000
|
$180.000
|
$82.500
|
$165.000
|
$250.000
|
|
|
ELIM EXT PAV MRK & MRKS (18")(YLD TRI)
|
EA
|
10.000
|
$65.000
|
$54.000
|
$33.000
|
$49.500
|
$500.000
|
|
|
TACK COAT
|
GAL
|
85.000
|
$12.000
|
$25.000
|
$11.000
|
$5.500
|
$10.000
|
|
|
D-GR HMA TY-D PG 76-22 (EXEMPT)
|
TON
|
97.000
|
$300.000
|
$350.000
|
$350.000
|
$330.000
|
$500.000
|
|
|
PRECAST LIGHT POLE FOUNDATION
|
EA
|
8.000
|
$2,500.000
|
$1,200.000
|
$0.010
|
$1,650.000
|
$5,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
198.000
|
$155.000
|
$80.000
|
$150.000
|
$1.100
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
99.000
|
$200.000
|
$300.000
|
$185.000
|
$1.100
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$250.000
|
$350.000
|
$0.010
|
$1.100
|
$550.000
|
|
Totals: |
$1,069,870.000
|
$968,539.790
|
$1,064,707.940
|
$1,382,849.250
|
$2,164,333.000
|