PREPARING ROW
|
STA
|
149.000
|
$1,780.000
|
$500.000
|
$300.000
|
$1,000.000
|
$1,610.000
|
$848.350
|
$825.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
106.000
|
$9.450
|
$10.300
|
$33.000
|
$15.000
|
$25.000
|
$10.000
|
$15.170
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
17,519.000
|
$10.500
|
$10.500
|
$18.000
|
$15.000
|
$18.000
|
$17.130
|
$26.500
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
11,588.600
|
$6.360
|
$10.250
|
$14.000
|
$7.000
|
$16.000
|
$12.400
|
$11.500
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
44,374.000
|
$1.000
|
$2.000
|
$1.000
|
$1.670
|
$2.270
|
$2.020
|
$2.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
44,374.000
|
$0.150
|
$0.130
|
$0.150
|
$0.210
|
$0.120
|
$0.240
|
$0.150
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
22,187.000
|
$0.180
|
$0.120
|
$0.150
|
$0.170
|
$0.120
|
$0.480
|
$0.150
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
22,187.000
|
$0.190
|
$0.120
|
$0.150
|
$0.170
|
$0.120
|
$0.480
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
751.000
|
$19.190
|
$45.800
|
$35.000
|
$20.000
|
$15.000
|
$21.120
|
$15.500
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
44,374.000
|
$1.330
|
$0.850
|
$1.200
|
$1.240
|
$0.820
|
$0.770
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
13,145.000
|
$41.300
|
$50.000
|
$57.000
|
$50.750
|
$42.000
|
$50.400
|
$67.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
9,198.000
|
$5.000
|
$3.900
|
$4.000
|
$4.250
|
$4.250
|
$4.870
|
$5.750
|
|
|
ASPH (TIER II)
|
GAL
|
37,612.000
|
$3.050
|
$3.100
|
$3.300
|
$3.600
|
$3.250
|
$4.060
|
$5.000
|
|
|
AGGR(TY-PD GR-4 SAC-B)
|
CY
|
834.000
|
$90.700
|
$87.900
|
$93.000
|
$121.000
|
$92.000
|
$96.600
|
$161.000
|
|
|
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
|
TON
|
825.000
|
$69.250
|
$103.000
|
$109.000
|
$95.000
|
$109.000
|
$98.700
|
$117.000
|
|
|
D-GR HMA TY-C PG70-22
|
TON
|
10,093.000
|
$60.920
|
$77.600
|
$82.000
|
$72.000
|
$81.900
|
$80.510
|
$88.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 1")
|
SY
|
7,302.000
|
$0.540
|
$1.300
|
$1.400
|
$2.800
|
$1.500
|
$6.840
|
$1.500
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
3,089.000
|
$1.500
|
$2.600
|
$2.700
|
$3.800
|
$3.000
|
$4.560
|
$3.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
56.000
|
$2.970
|
$20.700
|
$22.000
|
$5.650
|
$35.000
|
$20.000
|
$20.230
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,026.000
|
$2.970
|
$55.100
|
$59.000
|
$16.000
|
$15.000
|
$53.250
|
$30.350
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
358.000
|
$385.370
|
$429.000
|
$460.000
|
$452.000
|
$460.530
|
$415.000
|
$429.900
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
102.000
|
$151.330
|
$150.000
|
$160.000
|
$135.000
|
$140.000
|
$145.000
|
$177.020
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
249.000
|
$330.160
|
$569.000
|
$485.000
|
$480.000
|
$582.680
|
$550.000
|
$490.590
|
|
|
CONC BOX CULV (10 FT X 7 FT)
|
LF
|
38.000
|
$724.000
|
$1,010.000
|
$1,100.000
|
$1,865.000
|
$1,000.000
|
$976.000
|
$910.380
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
16.000
|
$661.790
|
$595.000
|
$640.000
|
$1,240.000
|
$900.000
|
$575.000
|
$606.920
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
58.000
|
$430.000
|
$527.000
|
$570.000
|
$620.000
|
$800.000
|
$510.000
|
$657.490
|
|
|
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
|
LF
|
50.000
|
$897.470
|
$714.000
|
$770.000
|
$960.000
|
$650.000
|
$690.000
|
$758.650
|
|
|
CONC BOX CULV (4 FT X 2.5 FT) (EXTEND)
|
LF
|
16.000
|
$442.420
|
$721.000
|
$780.000
|
$1,045.000
|
$700.000
|
$697.000
|
$455.190
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
88.000
|
$84.900
|
$56.900
|
$62.000
|
$96.000
|
$180.000
|
$55.000
|
$126.440
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
58.000
|
$152.000
|
$114.000
|
$123.000
|
$146.000
|
$215.000
|
$110.000
|
$252.880
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
1.000
|
$13,000.000
|
$6,530.000
|
$7,000.000
|
$7,345.000
|
$2,000.000
|
$6,315.000
|
$3,034.590
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
2.000
|
$11,012.510
|
$11,400.000
|
$12,300.000
|
$14,700.000
|
$4,500.000
|
$10,985.000
|
$8,092.230
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$14,029.140
|
$13,000.000
|
$14,000.000
|
$19,775.000
|
$13,000.000
|
$12,567.000
|
$14,161.410
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
4.000
|
$12,572.850
|
$19,700.000
|
$21,200.000
|
$24,860.000
|
$15,000.000
|
$19,000.000
|
$18,207.520
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$20,849.780
|
$29,200.000
|
$31,500.000
|
$32,770.000
|
$26,000.000
|
$28,250.000
|
$30,345.870
|
|
|
HEADWALL (CH - PW - 0)(DIA= 24 IN)(MOD)
|
EA
|
1.000
|
$3,850.000
|
$8,190.000
|
$8,800.000
|
$7,910.000
|
$1,500.000
|
$7,920.000
|
$4,046.120
|
|
|
HEADWALL (CH-PW-S)(DIA = 24 IN)(MOD)
|
EA
|
1.000
|
$11,800.000
|
$7,000.000
|
$7,500.000
|
$7,910.000
|
$1,600.000
|
$6,769.000
|
$4,046.120
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$780.680
|
$1,580.000
|
$1,700.000
|
$2,034.000
|
$1,451.450
|
$1,525.000
|
$1,011.530
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
7.000
|
$915.750
|
$1,580.000
|
$1,700.000
|
$2,034.000
|
$1,544.950
|
$1,525.000
|
$1,213.830
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,500.000
|
$2,370.000
|
$2,500.000
|
$3,164.000
|
$3,255.510
|
$2,287.000
|
$3,540.350
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$2,181.000
|
$2,780.000
|
$3,000.000
|
$3,164.000
|
$2,781.100
|
$2,685.000
|
$4,046.120
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
13.000
|
$1,145.650
|
$4,650.000
|
$5,000.000
|
$1,130.000
|
$2,000.000
|
$4,500.000
|
$1,215.130
|
|
|
REMOV STR (SET)
|
EA
|
17.000
|
$447.960
|
$310.000
|
$730.000
|
$280.000
|
$500.000
|
$300.000
|
$456.180
|
|
|
REMOV STR (WINGWALL)
|
EA
|
7.000
|
$1,137.320
|
$776.000
|
$1,800.000
|
$1,525.000
|
$1,000.000
|
$750.000
|
$811.630
|
|
|
REMOV STR (HEADWALL)
|
EA
|
5.000
|
$3,320.000
|
$776.000
|
$2,200.000
|
$1,400.000
|
$2,000.000
|
$750.000
|
$812.590
|
|
|
REMOV STR (PIPE)
|
LF
|
32.000
|
$12.050
|
$15.500
|
$59.000
|
$11.300
|
$50.000
|
$15.000
|
$30.870
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
27.000
|
$31.300
|
$119.000
|
$380.000
|
$45.200
|
$500.000
|
$115.000
|
$80.530
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$313,624.000
|
$270,000.000
|
$200,000.000
|
$410,000.000
|
$410,000.000
|
$491,316.490
|
$400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$6,000.000
|
$10,000.000
|
$1,100.000
|
$8,400.000
|
$1,000.000
|
$17,101.820
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
760.000
|
$28.200
|
$27.700
|
$29.000
|
$31.000
|
$26.780
|
$37.780
|
$27.820
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
760.000
|
$6.940
|
$8.100
|
$14.000
|
$15.000
|
$7.810
|
$13.810
|
$15.170
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
224.000
|
$21.170
|
$29.600
|
$29.000
|
$18.000
|
$28.590
|
$28.590
|
$15.930
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
224.000
|
$7.870
|
$8.900
|
$16.000
|
$13.500
|
$8.600
|
$8.600
|
$13.660
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
12,286.000
|
$2.300
|
$3.050
|
$2.500
|
$2.450
|
$2.940
|
$2.940
|
$2.170
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
12,286.000
|
$0.630
|
$0.500
|
$1.000
|
$0.200
|
$0.480
|
$0.480
|
$0.200
|
|
|
DRIVEWAYS (ACP)
|
SY
|
94.000
|
$53.070
|
$46.500
|
$60.000
|
$23.000
|
$75.910
|
$29.960
|
$110.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
546.000
|
$21.960
|
$25.000
|
$20.000
|
$13.000
|
$37.380
|
$29.960
|
$60.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,687.500
|
$18.900
|
$19.800
|
$20.000
|
$21.000
|
$20.900
|
$23.900
|
$21.140
|
|
|
SHORT RADIUS
|
LF
|
25.000
|
$27.310
|
$30.800
|
$31.000
|
$33.000
|
$24.500
|
$24.500
|
$24.780
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$845.850
|
$625.000
|
$630.000
|
$660.000
|
$678.000
|
$678.000
|
$685.820
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
11.000
|
$969.100
|
$850.000
|
$860.000
|
$900.000
|
$1,025.000
|
$1,025.000
|
$1,036.820
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
450.000
|
$22.490
|
$21.300
|
$22.000
|
$22.500
|
$19.900
|
$19.900
|
$20.130
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,165.000
|
$2.100
|
$1.050
|
$1.100
|
$1.000
|
$1.000
|
$1.000
|
$1.010
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY I)
|
EA
|
14.000
|
$2,421.730
|
$2,340.000
|
$2,400.000
|
$2,500.000
|
$2,730.000
|
$2,730.000
|
$2,761.470
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
6.000
|
$500.000
|
$202.000
|
$175.000
|
$395.000
|
$164.500
|
$164.500
|
$166.400
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$416.960
|
$517.000
|
$500.000
|
$540.000
|
$472.160
|
$472.160
|
$477.600
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
11.000
|
$561.800
|
$517.000
|
$580.000
|
$600.000
|
$547.830
|
$547.830
|
$554.150
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$79.430
|
$259.000
|
$186.000
|
$80.000
|
$175.000
|
$175.000
|
$177.020
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
23.000
|
$40.000
|
$46.500
|
$41.000
|
$80.000
|
$38.850
|
$38.850
|
$39.300
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
65.000
|
$14.000
|
$17.600
|
$15.000
|
$50.000
|
$13.950
|
$13.950
|
$14.110
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,220.000
|
$0.780
|
$1.900
|
$0.500
|
$0.950
|
$1.000
|
$1.410
|
$1.450
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,534.000
|
$2.030
|
$1.900
|
$0.500
|
$0.950
|
$1.000
|
$1.410
|
$1.450
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
685.000
|
$0.800
|
$1.050
|
$1.000
|
$1.130
|
$1.000
|
$0.750
|
$0.760
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$106.910
|
$114.000
|
$115.000
|
$124.000
|
$150.000
|
$50.000
|
$50.580
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
4,260.000
|
$0.360
|
$0.330
|
$0.300
|
$0.360
|
$0.400
|
$0.640
|
$0.650
|
|
RE PM W/RET REQ TY II (W) 4" (BRK)
|
LF
|
4,430.000
|
$1.500
|
$0.090
|
$0.100
|
$0.100
|
$0.150
|
$0.130
|
$0.130
|
|
RE PM W/RET REQ TY II (W) 4" (SLD)
|
LF
|
32,800.000
|
$1.500
|
$0.090
|
$0.100
|
$0.100
|
$0.130
|
$0.120
|
$0.120
|
|
RE PM W/RET REQ TY II (Y) 4" (SLD)
|
LF
|
30,700.000
|
$1.170
|
$0.090
|
$0.100
|
$0.100
|
$0.130
|
$0.120
|
$0.120
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
29,830.000
|
$0.640
|
$0.570
|
$0.600
|
$0.620
|
$0.640
|
$0.620
|
$0.630
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
29,830.000
|
$0.640
|
$0.570
|
$0.600
|
$0.620
|
$0.640
|
$0.630
|
$0.640
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
373.000
|
$3.500
|
$4.150
|
$4.200
|
$4.500
|
$4.000
|
$3.250
|
$3.290
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
216.000
|
$3.200
|
$4.150
|
$4.200
|
$4.500
|
$4.000
|
$3.250
|
$3.290
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
4.000
|
$26.920
|
$20.700
|
$22.000
|
$22.000
|
$25.000
|
$1.000
|
$1.010
|
|
|
SPLIT RAIL FENCE (INSTALL)
|
LF
|
100.000
|
$200.000
|
$25.900
|
$48.000
|
$30.000
|
$50.000
|
$10.000
|
$115.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$7,644.000
|
$12,400.000
|
$5,700.000
|
$7,500.000
|
$7,500.000
|
$8,000.000
|
$10,115.290
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$12,375.640
|
$20,700.000
|
$6,400.000
|
$10,000.000
|
$5,000.000
|
$18,000.000
|
$90,365.320
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$45.200
|
$51.700
|
$66.000
|
$58.000
|
$50.000
|
$60.000
|
$10.120
|
|
Totals: |
$3,538,178.136
|
$3,884,998.700
|
$4,013,980.400
|
$4,116,317.360
|
$4,165,857.230
|
$4,477,576.080
|
$4,966,011.520
|