PREPARING ROW
|
STA
|
161.000
|
$1,000.000
|
$950.000
|
$805.830
|
$605.000
|
$1,300.000
|
$900.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
80.000
|
$42.000
|
$8.150
|
$60.720
|
$17.500
|
$19.000
|
$61.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
584.000
|
$15.000
|
$17.000
|
$27.870
|
$15.000
|
$22.000
|
$61.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
433.000
|
$12.000
|
$5.500
|
$7.800
|
$4.000
|
$10.000
|
$11.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
4,146.000
|
$4.000
|
$4.000
|
$6.660
|
$7.000
|
$2.300
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,625.000
|
$15.000
|
$17.000
|
$21.210
|
$25.000
|
$18.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
2,358.000
|
$12.000
|
$12.000
|
$21.210
|
$10.000
|
$30.000
|
$15.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
19,390.000
|
$1.000
|
$1.250
|
$1.540
|
$3.900
|
$2.250
|
$1.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
19,390.000
|
$0.150
|
$0.250
|
$0.380
|
$0.380
|
$0.390
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
330.000
|
$20.000
|
$20.000
|
$13.320
|
$40.100
|
$24.000
|
$35.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
19,390.000
|
$1.050
|
$1.550
|
$0.880
|
$1.350
|
$1.010
|
$2.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
4,484.000
|
$55.000
|
$59.700
|
$68.980
|
$90.000
|
$65.000
|
$75.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
2,079.000
|
$6.000
|
$5.000
|
$4.060
|
$3.500
|
$3.250
|
$3.500
|
|
|
D-GR HMA(SQ) TY-B PG64-22 (LEVEL UP)
|
TON
|
38.000
|
$125.000
|
$152.000
|
$240.900
|
$141.000
|
$150.000
|
$142.000
|
|
|
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
|
TON
|
495.000
|
$125.000
|
$104.000
|
$95.430
|
$97.600
|
$105.000
|
$98.000
|
|
|
D-GR HMA TY-D SAC-B PG64-22
|
TON
|
950.000
|
$125.000
|
$90.000
|
$102.450
|
$95.400
|
$95.000
|
$118.000
|
|
|
TOM (ASPHALT) PG 70-22
|
TON
|
298.000
|
$105.000
|
$100.000
|
$110.040
|
$104.000
|
$115.000
|
$105.000
|
|
|
TOM - C (AGGREGATE) SAC - B
|
TON
|
4,502.000
|
$105.000
|
$100.000
|
$110.040
|
$104.000
|
$103.000
|
$105.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
978.000
|
$30.000
|
$29.750
|
$39.420
|
$43.500
|
$42.000
|
$37.000
|
|
|
PLAN & TEXT CONC PAV(0" TO 1-1/2")
|
SY
|
1,565.000
|
$12.500
|
$4.000
|
$2.560
|
$6.200
|
$7.000
|
$11.000
|
|
|
CEM STABIL BKFL
|
CY
|
29.000
|
$115.000
|
$115.000
|
$220.000
|
$175.000
|
$150.000
|
$170.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
22.000
|
$4.500
|
$44.000
|
$73.610
|
$56.700
|
$3.000
|
$125.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
680.000
|
$25.000
|
$70.000
|
$35.000
|
$80.000
|
$78.000
|
$55.000
|
|
|
CL C CONC (MISC)
|
CY
|
0.720
|
$1,100.000
|
$1,200.000
|
$1,203.420
|
$2,000.000
|
$1,500.000
|
$6,300.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
106.000
|
$480.000
|
$485.000
|
$420.000
|
$500.000
|
$490.000
|
$550.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
69.000
|
$120.000
|
$125.000
|
$151.680
|
$139.000
|
$155.000
|
$203.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
80.000
|
$375.000
|
$430.000
|
$450.000
|
$700.000
|
$510.000
|
$575.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
132.000
|
$25.000
|
$58.000
|
$46.200
|
$79.600
|
$80.000
|
$82.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
4.000
|
$70.000
|
$140.000
|
$401.720
|
$189.000
|
$300.000
|
$842.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
8.000
|
$1,000.000
|
$1,600.000
|
$1,145.950
|
$1,000.000
|
$3,400.000
|
$2,250.000
|
|
|
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
|
LF
|
16.000
|
$800.000
|
$2,200.000
|
$1,208.800
|
$1,000.000
|
$3,200.000
|
$2,370.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
190.000
|
$60.000
|
$85.000
|
$126.150
|
$77.500
|
$110.000
|
$120.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$5,000.000
|
$4,000.000
|
$7,205.940
|
$3,640.000
|
$12,000.000
|
$9,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$14,896.000
|
$53,280.000
|
$30,000.000
|
$15,000.000
|
$29,000.000
|
$36,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$22,500.000
|
$35,000.000
|
$32,000.000
|
$30,000.000
|
$33,000.000
|
$48,000.000
|
|
|
SET (TY II) (24 IN) (CMP) (3: 1) (C)
|
EA
|
1.000
|
$1,200.000
|
$1,600.000
|
$2,066.240
|
$1,500.000
|
$1,500.000
|
$2,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$1,800.000
|
$2,092.530
|
$1,500.000
|
$2,000.000
|
$2,600.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$199,500.000
|
$240,000.000
|
$245,000.000
|
$190,000.000
|
$260,000.000
|
$170,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$10,000.000
|
$3,725.000
|
$11,500.000
|
$10,000.000
|
$3,375.000
|
$2,600.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
330.000
|
$30.000
|
$29.000
|
$25.000
|
$37.800
|
$30.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
330.000
|
$10.000
|
$15.000
|
$8.000
|
$16.900
|
$10.000
|
$16.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
224.000
|
$20.000
|
$17.000
|
$28.000
|
$37.500
|
$32.000
|
$17.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
224.000
|
$7.000
|
$13.500
|
$8.000
|
$13.500
|
$10.000
|
$14.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,572.000
|
$2.250
|
$2.500
|
$3.000
|
$4.400
|
$3.000
|
$2.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,572.000
|
$0.600
|
$0.400
|
$0.800
|
$1.450
|
$1.000
|
$0.400
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
240.000
|
$42.000
|
$43.000
|
$45.000
|
$38.500
|
$12.000
|
$22.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$46.000
|
$43.000
|
$48.000
|
$36.700
|
$35.000
|
$22.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
240.000
|
$5.000
|
$19.000
|
$20.000
|
$43.000
|
$10.000
|
$18.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$7.000
|
$19.000
|
$23.880
|
$26.700
|
$35.000
|
$18.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
240.000
|
$10.000
|
$34.000
|
$19.000
|
$35.200
|
$18.000
|
$22.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$12.000
|
$34.000
|
$23.000
|
$18.700
|
$18.000
|
$22.000
|
|
|
CONC CURB (TY I)
|
LF
|
78.000
|
$15.000
|
$38.000
|
$35.000
|
$26.300
|
$35.000
|
$28.000
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
365.000
|
$20.000
|
$48.000
|
$45.000
|
$32.500
|
$35.000
|
$28.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
419.000
|
$70.000
|
$87.000
|
$80.000
|
$124.000
|
$90.000
|
$73.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
94.000
|
$38.000
|
$55.000
|
$100.000
|
$49.200
|
$87.000
|
$100.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
925.000
|
$22.000
|
$21.000
|
$20.000
|
$27.700
|
$24.000
|
$28.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
769.000
|
$2.500
|
$1.650
|
$1.650
|
$2.100
|
$2.000
|
$2.200
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$215.000
|
$200.000
|
$195.000
|
$186.000
|
$170.000
|
$192.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$2,700.000
|
$2,700.000
|
$2,300.000
|
$3,140.000
|
$2,700.000
|
$3,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$485.000
|
$195.000
|
$185.000
|
$541.000
|
$580.000
|
$560.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
7.000
|
$650.000
|
$195.000
|
$185.000
|
$710.000
|
$760.000
|
$735.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
20.000
|
$575.000
|
$240.000
|
$225.000
|
$638.000
|
$680.000
|
$660.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$800.000
|
$350.000
|
$325.000
|
$711.000
|
$750.000
|
$735.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
41.000
|
$86.000
|
$70.000
|
$60.000
|
$106.000
|
$115.000
|
$110.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
1.000
|
$80.000
|
$68.000
|
$65.000
|
$59.700
|
$62.000
|
$82.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
24.000
|
$35.000
|
$73.000
|
$70.000
|
$23.300
|
$24.000
|
$24.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
728.000
|
$0.650
|
$2.150
|
$1.500
|
$2.850
|
$2.300
|
$2.200
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
208.000
|
$8.500
|
$6.500
|
$20.000
|
$20.600
|
$6.850
|
$6.600
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
1,577.000
|
$0.700
|
$2.100
|
$1.500
|
$2.850
|
$2.250
|
$2.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
495.000
|
$1.500
|
$1.050
|
$1.780
|
$1.650
|
$1.200
|
$1.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,955.000
|
$1.000
|
$0.800
|
$0.650
|
$0.820
|
$1.000
|
$0.800
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
141.000
|
$6.000
|
$7.500
|
$6.000
|
$6.300
|
$8.000
|
$7.700
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
3.000
|
$300.000
|
$425.000
|
$325.000
|
$242.000
|
$450.000
|
$438.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
30,720.000
|
$0.400
|
$0.420
|
$0.330
|
$0.350
|
$0.450
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,497.000
|
$0.400
|
$0.520
|
$0.350
|
$0.380
|
$0.550
|
$0.530
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
33,042.000
|
$0.400
|
$0.420
|
$0.340
|
$0.350
|
$0.470
|
$0.450
|
|
PREFAB PAV MRK TY B (W)(ARROW)
|
EA
|
22.000
|
$300.000
|
$435.000
|
$475.000
|
$416.000
|
$480.000
|
$447.320
|
|
PREFAB PAV MRK TY B (W)(WORD)
|
EA
|
18.000
|
$500.000
|
$435.000
|
$475.000
|
$627.000
|
$480.000
|
$447.320
|
|
REFL PAV MRKR TY I-C
|
EA
|
146.000
|
$4.000
|
$4.150
|
$3.000
|
$4.850
|
$4.500
|
$4.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,139.000
|
$3.500
|
$4.150
|
$3.000
|
$4.850
|
$4.250
|
$4.400
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
82.000
|
$3.500
|
$22.000
|
$10.000
|
$18.500
|
$21.000
|
$22.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
80.000
|
$8.000
|
$18.000
|
$14.550
|
$15.700
|
$40.000
|
$35.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
16,993.000
|
$3.400
|
$3.000
|
$3.180
|
$2.700
|
$2.650
|
$2.750
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$12,000.000
|
$5,000.000
|
$8,490.000
|
$9,500.000
|
$5,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
306.000
|
$190.000
|
$175.000
|
$125.000
|
$57.400
|
$210.000
|
$220.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$300.000
|
$195.000
|
$125.000
|
$57.400
|
$225.000
|
$439.000
|
|
Totals: |
$2,269,533.100
|
$2,394,881.330
|
$2,492,082.922
|
$2,562,366.510
|
$2,615,709.790
|
$2,620,502.160
|