EXCAVATION (ROADWAY)
|
CY
|
50.000
|
$12.000
|
$30.000
|
$500.000
|
$215.000
|
$20.000
|
$150.000
|
$35.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
650.000
|
$12.000
|
$45.000
|
$50.000
|
$46.000
|
$20.000
|
$20.000
|
$65.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
450.000
|
$12.000
|
$60.000
|
$80.000
|
$105.000
|
$20.000
|
$18.000
|
$100.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
4,465.000
|
$1.750
|
$2.500
|
$1.750
|
$2.000
|
$4.000
|
$3.500
|
$1.750
|
|
|
REWORK BS MTL (TY C)(0"-9")(ORD COMP)
|
SY
|
2,339.000
|
$10.000
|
$2.500
|
$4.000
|
$22.000
|
$8.000
|
$12.000
|
$16.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
636.000
|
$6.000
|
$7.000
|
$5.000
|
$21.000
|
$10.000
|
$9.000
|
$22.000
|
|
|
CEM STABIL BKFL
|
CY
|
142.400
|
$110.620
|
$225.000
|
$180.000
|
$400.000
|
$300.000
|
$215.000
|
$130.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
774.000
|
$13.240
|
$30.000
|
$35.000
|
$50.000
|
$40.000
|
$50.000
|
$42.500
|
|
|
DRILL SHAFT (36 IN)(HPC)
|
LF
|
945.000
|
$300.000
|
$380.000
|
$390.000
|
$438.000
|
$550.000
|
$405.000
|
$460.000
|
|
|
CL C CONC (ABUT)(HPC)(SRC)
|
CY
|
58.400
|
$1,023.250
|
$1,500.000
|
$1,900.000
|
$1,800.000
|
$2,000.000
|
$2,080.000
|
$2,200.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
46.100
|
$943.930
|
$2,300.000
|
$2,500.000
|
$1,800.000
|
$2,000.000
|
$2,960.000
|
$2,200.000
|
|
|
CL C CONC (COLUMN)(HPC)(SRC)
|
CY
|
33.600
|
$948.810
|
$1,250.000
|
$2,200.000
|
$1,800.000
|
$2,000.000
|
$2,955.000
|
$2,200.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
10,750.000
|
$19.170
|
$30.000
|
$31.000
|
$34.000
|
$30.000
|
$35.000
|
$35.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
80.400
|
$533.310
|
$875.000
|
$800.000
|
$800.000
|
$1,000.000
|
$1,130.000
|
$1,050.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
1,494.500
|
$157.670
|
$250.000
|
$225.000
|
$270.000
|
$260.000
|
$315.000
|
$200.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
100.700
|
$484.520
|
$650.000
|
$700.000
|
$750.000
|
$750.000
|
$800.000
|
$550.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
39.000
|
$500.000
|
$715.000
|
$600.000
|
$700.000
|
$800.000
|
$780.000
|
$750.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
466.000
|
$65.720
|
$100.000
|
$130.000
|
$140.000
|
$150.000
|
$135.000
|
$202.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
99.000
|
$117.250
|
$150.000
|
$130.000
|
$175.000
|
$150.000
|
$180.000
|
$180.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$60,000.000
|
$100,000.000
|
$290,000.000
|
$205,000.000
|
$250,000.000
|
$376,000.000
|
$534,700.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
228.000
|
$3.000
|
$3.000
|
$5.000
|
$10.000
|
$5.000
|
$4.500
|
$13.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$185,000.000
|
$255,000.000
|
$290,000.000
|
$330,000.000
|
$375,000.000
|
$350,000.000
|
$360,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$9,000.000
|
$16,000.000
|
$25,000.000
|
$12,500.000
|
$4,000.000
|
$4,875.000
|
$17,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,000.000
|
$30.000
|
$40.000
|
$24.000
|
$30.000
|
$50.000
|
$35.000
|
$24.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,000.000
|
$9.000
|
$10.000
|
$15.000
|
$10.000
|
$20.000
|
$9.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,862.000
|
$4.000
|
$2.250
|
$4.250
|
$3.000
|
$5.000
|
$4.500
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,862.000
|
$2.000
|
$0.900
|
$2.500
|
$1.000
|
$1.000
|
$0.800
|
$2.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
288.000
|
$8.000
|
$8.000
|
$10.000
|
$7.000
|
$12.000
|
$12.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
288.000
|
$2.000
|
$1.750
|
$5.000
|
$1.000
|
$1.000
|
$1.150
|
$5.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
9.000
|
$7,000.000
|
$3,500.000
|
$3,000.000
|
$5,000.000
|
$5,000.000
|
$4,250.000
|
$7,500.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
960.000
|
$70.000
|
$90.000
|
$10.000
|
$90.000
|
$85.000
|
$80.000
|
$73.500
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
960.000
|
$10.000
|
$7.000
|
$5.000
|
$10.000
|
$10.000
|
$7.000
|
$21.700
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
960.000
|
$12.000
|
$20.000
|
$10.000
|
$20.000
|
$30.000
|
$12.000
|
$33.750
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
275.000
|
$29.000
|
$55.000
|
$40.000
|
$40.000
|
$40.000
|
$50.000
|
$44.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,950.000
|
$3,500.000
|
$2,875.000
|
$2,875.000
|
$3,000.000
|
$3,250.000
|
$2,950.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
533.000
|
$4.000
|
$3.000
|
$3.500
|
$3.500
|
$5.000
|
$3.500
|
$1.750
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$300.000
|
$600.000
|
$350.000
|
$350.000
|
$100.000
|
$650.000
|
$195.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$5,500.000
|
$3,550.000
|
$3,550.000
|
$4,000.000
|
$4,500.000
|
$3,400.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$325.000
|
$600.000
|
$350.000
|
$350.000
|
$100.000
|
$700.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,300.000
|
$650.000
|
$2,750.000
|
$2,750.000
|
$4,000.000
|
$375.000
|
$345.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$825.000
|
$650.000
|
$1,500.000
|
$1,500.000
|
$1,000.000
|
$1,000.000
|
$215.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$7,500.000
|
$10,000.000
|
$7,500.000
|
$7,500.000
|
$12,500.000
|
$1,500.000
|
$12,150.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
221.000
|
$19.000
|
$22.000
|
$30.000
|
$30.000
|
$40.000
|
$25.000
|
$25.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$1,100.000
|
$715.000
|
$975.000
|
$975.000
|
$1,500.000
|
$784.000
|
$800.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
5.000
|
$1,258.000
|
$440.000
|
$750.000
|
$750.000
|
$500.000
|
$600.000
|
$750.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$196.000
|
$350.000
|
$100.000
|
$100.000
|
$50.000
|
$425.000
|
$140.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
10.000
|
$48.000
|
$35.000
|
$20.000
|
$20.000
|
$30.000
|
$30.000
|
$13.300
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
11.000
|
$50.000
|
$30.000
|
$35.000
|
$35.000
|
$60.000
|
$30.500
|
$31.500
|
|
|
INSTL OM ASSM (OM-3L)(WFLX)GND)GND
|
EA
|
2.000
|
$300.000
|
$450.000
|
$300.000
|
$300.000
|
$500.000
|
$475.000
|
$65.750
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)GND)GND
|
EA
|
2.000
|
$300.000
|
$450.000
|
$300.000
|
$300.000
|
$500.000
|
$475.000
|
$65.750
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
640.000
|
$3.650
|
$3.750
|
$4.000
|
$4.000
|
$5.000
|
$4.750
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
11,790.000
|
$0.750
|
$0.850
|
$0.850
|
$0.850
|
$1.000
|
$1.250
|
$0.850
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
48.000
|
$10.000
|
$12.000
|
$37.500
|
$37.500
|
$40.000
|
$55.000
|
$37.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
25,600.000
|
$0.750
|
$0.750
|
$0.200
|
$0.850
|
$1.000
|
$1.250
|
$0.850
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
380.000
|
$1.000
|
$1.750
|
$0.450
|
$1.500
|
$1.000
|
$1.000
|
$1.500
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
214.000
|
$4.000
|
$3.000
|
$10.000
|
$10.000
|
$10.000
|
$11.750
|
$10.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,290.000
|
$0.440
|
$0.600
|
$1.000
|
$1.000
|
$1.000
|
$1.150
|
$1.000
|
|
|
PAVEMENT SEALER 12"
|
LF
|
95.000
|
$1.250
|
$1.500
|
$3.000
|
$3.000
|
$4.000
|
$3.450
|
$3.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
7,156.000
|
$0.500
|
$0.850
|
$0.600
|
$0.600
|
$1.000
|
$0.650
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
890.000
|
$0.500
|
$0.850
|
$0.600
|
$0.600
|
$1.000
|
$0.650
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,832.000
|
$0.500
|
$0.850
|
$0.600
|
$0.600
|
$1.000
|
$0.650
|
$0.600
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
8,700.000
|
$0.750
|
$1.500
|
$1.250
|
$1.250
|
$2.000
|
$1.300
|
$1.250
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
7,094.000
|
$0.750
|
$1.500
|
$1.250
|
$1.250
|
$2.000
|
$1.300
|
$1.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
402.000
|
$3.500
|
$3.750
|
$4.000
|
$4.000
|
$5.000
|
$4.500
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
66,968.000
|
$0.750
|
$0.750
|
$0.200
|
$0.750
|
$1.000
|
$1.050
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
24.000
|
$3.430
|
$3.000
|
$5.000
|
$5.000
|
$5.000
|
$7.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,290.000
|
$0.500
|
$0.750
|
$1.000
|
$1.000
|
$1.000
|
$1.150
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
95.000
|
$1.250
|
$3.000
|
$3.000
|
$3.000
|
$4.000
|
$3.500
|
$3.000
|
|
|
SP MIXES SP-B PG70-22
|
TON
|
1,220.000
|
$95.000
|
$150.000
|
$156.120
|
$165.000
|
$200.000
|
$151.000
|
$165.000
|
|
|
SP MIXES SP-D SAC-A PG70-22
|
TON
|
313.000
|
$175.000
|
$185.000
|
$156.270
|
$240.000
|
$200.000
|
$157.000
|
$240.000
|
|
|
TACK COAT
|
GAL
|
284.000
|
$4.000
|
$10.000
|
$6.000
|
$6.900
|
$10.000
|
$18.000
|
$6.900
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$6,500.000
|
$7,000.000
|
$12,000.000
|
$15,000.000
|
$8,000.000
|
$17,210.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$9,500.000
|
$8,000.000
|
$1,000.000
|
$10,000.000
|
$7,500.000
|
$9,000.000
|
$12,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
18.000
|
$300.000
|
$300.000
|
$800.000
|
$280.000
|
$500.000
|
$250.000
|
$293.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
12.000
|
$400.000
|
$450.000
|
$1,000.000
|
$350.000
|
$750.000
|
$600.000
|
$591.000
|
|
Totals: |
$2,008,874.080
|
$2,850,736.600
|
$3,079,794.560
|
$3,330,600.900
|
$3,460,252.000
|
$3,494,346.350
|