PREPARING ROW
|
STA
|
7.000
|
$9,000.000
|
$82,800.000
|
$4,000.000
|
|
|
PREP ROW (TREE REMOVE) (12"-24" DIA)
|
EA
|
7.000
|
$2,500.000
|
$1,550.000
|
$1,400.000
|
|
|
PREP ROW (TREE REMOVE) (24"-36" DIA)
|
EA
|
2.000
|
$3,000.000
|
$2,900.000
|
$2,500.000
|
|
|
PREP ROW (TREE REMOVE) (36"-48" DIA)
|
EA
|
3.000
|
$5,000.000
|
$3,875.000
|
$3,000.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
1,658.000
|
$35.000
|
$16.000
|
$20.000
|
|
|
RMV (12") TRT/UNTRT BASE & ASPH PAV
|
SY
|
2,818.000
|
$14.000
|
$20.700
|
$22.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
1,302.000
|
$32.000
|
$18.700
|
$6.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
922.000
|
$40.000
|
$15.000
|
$11.000
|
|
|
DRILL SEED (PERM_RURAL_SAND)
|
SY
|
3,200.000
|
$0.250
|
$2.000
|
$1.250
|
|
|
PROOF ROLLING
|
HR
|
10.000
|
$250.000
|
$85.500
|
$115.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
609.000
|
$5.250
|
$14.000
|
$5.500
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
832.000
|
$3.400
|
$5.500
|
$3.250
|
|
|
D-GR HMA TY-D SAC-A PG70-28
|
TON
|
237.000
|
$280.000
|
$255.000
|
$500.000
|
|
|
TACK COAT
|
GAL
|
961.000
|
$4.250
|
$6.000
|
$8.000
|
|
|
D-GR HMA TY-B SAC-B PG70-28
|
TON
|
1,313.000
|
$240.000
|
$200.000
|
$275.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
205.000
|
$400.000
|
$255.000
|
$400.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
625.000
|
$20.000
|
$46.000
|
$579.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
120.000
|
$340.000
|
$195.000
|
$600.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
548.000
|
$375.000
|
$240.000
|
$500.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
56.800
|
$2,000.000
|
$3,600.000
|
$5,000.000
|
|
|
CL C CONC (CAP)
|
CY
|
19.200
|
$1,800.000
|
$2,400.000
|
$7,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
27.600
|
$2,500.000
|
$2,900.000
|
$4,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
12.500
|
$2,800.000
|
$2,550.000
|
$3,000.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
107.000
|
$1,000.000
|
$1,500.000
|
$1,000.000
|
|
|
SLAB SPAN
|
CY
|
32.600
|
$950.000
|
$2,200.000
|
$2,500.000
|
|
|
REINF CONC SLAB (PRECAST SUPER ASSEM)
|
SF
|
6,790.000
|
$65.000
|
$95.500
|
$140.000
|
|
|
EPOXY WATERPROOF FINISH (TY X)
|
SF
|
1,622.000
|
$15.000
|
$17.000
|
$25.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
232.000
|
$700.000
|
$750.000
|
$1,400.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
49.000
|
$600.000
|
$700.000
|
$600.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
15.000
|
$350.000
|
$1,200.000
|
$260.000
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
1,078.000
|
$55.000
|
$40.000
|
$90.000
|
|
|
RAIL (TY T223)
|
LF
|
390.000
|
$220.000
|
$140.000
|
$350.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
106.000
|
$250.000
|
$256.000
|
$350.000
|
|
|
CONC BOX CULV (8 FT X 3 FT)
|
LF
|
64.000
|
$850.000
|
$825.000
|
$1,200.000
|
|
|
WINGWALL (SW - 0) (HW=4 FT)
|
EA
|
1.000
|
$15,000.000
|
$15,002.000
|
$27,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(6:1)(P)
|
EA
|
1.000
|
$30,000.000
|
$25,000.000
|
$35,000.000
|
|
|
DIAMOND GRINDING SLAB (ABC)
|
SY
|
1,078.000
|
$12.000
|
$14.000
|
$31.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$250,000.000
|
$650,000.000
|
$325,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$402,300.000
|
$590,000.000
|
$833,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$13,500.000
|
$7,000.000
|
$30,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
177.000
|
$85.000
|
$72.000
|
$50.000
|
|
|
TMA (STATIONARY)
|
DAY
|
25.000
|
$250.000
|
$350.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
3.000
|
$200.000
|
$600.000
|
$1,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
280.000
|
$45.000
|
$40.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
280.000
|
$15.000
|
$15.000
|
$23.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
444.000
|
$40.000
|
$25.000
|
$50.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
$15.000
|
$10.000
|
$30.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,592.000
|
$8.000
|
$5.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,592.000
|
$4.000
|
$0.500
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
120.000
|
$9.000
|
$16.000
|
$23.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
120.000
|
$2.500
|
$3.500
|
$5.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
90.000
|
$60.000
|
$50.000
|
$65.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
60.000
|
$25.000
|
$20.000
|
$9.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
90.000
|
$30.000
|
$25.000
|
$65.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
150.000
|
$30.000
|
$36.000
|
$64.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$2,100.000
|
$2,400.000
|
$5,300.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
1.000
|
$990.000
|
$1,500.000
|
$4,000.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
1.000
|
$1,500.000
|
$1,630.000
|
$4,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
413.000
|
$4.000
|
$4.000
|
$14.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,500.000
|
$3,600.000
|
$5,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$180.000
|
$350.000
|
$2,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$780.000
|
$1,350.000
|
$1,800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$960.000
|
$1,500.000
|
$2,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$880.000
|
$1,450.000
|
$1,800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,350.000
|
$2,000.000
|
$2,450.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$120.000
|
$100.000
|
$180.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
5.000
|
$65.000
|
$200.000
|
$260.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
9.000
|
$25.000
|
$200.000
|
$260.000
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)Y
|
EA
|
3.000
|
$15.000
|
$100.000
|
$120.000
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)R
|
EA
|
1.000
|
$15.000
|
$100.000
|
$120.000
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
2,740.000
|
$0.250
|
$1.500
|
$2.000
|
|
RE PM TY II (W) 12" (SLD)
|
LF
|
318.000
|
$2.300
|
$7.500
|
$10.000
|
|
RE PM TY II (Y) 6" (SLD)
|
LF
|
3,092.000
|
$0.250
|
$1.500
|
$2.000
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
18.000
|
$16.000
|
$20.000
|
$28.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
20.000
|
$4.250
|
$10.000
|
$14.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
2,916.000
|
$2.000
|
$2.500
|
$3.500
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
159.000
|
$4.200
|
$4.000
|
$5.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
18.000
|
$5.000
|
$6.000
|
$8.500
|
|
|
LITTER PICKUP
|
CYC
|
1.000
|
$1,500.000
|
$500.000
|
$1,000.000
|
|
|
MOWING, TRIMMING, AND EDGING
|
CYC
|
1.000
|
$1,200.000
|
$1,000.000
|
$13,500.000
|
|
|
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
|
SY
|
1,364.000
|
$7.000
|
$7.000
|
$14.000
|
|
|
ASPH FOR REINF FAB (PG76-28)
|
GAL
|
205.000
|
$4.000
|
$325.000
|
$8.500
|
|
|
TEMP CONSTRUCTION ACCESS
|
LS
|
1.000
|
$250,000.000
|
$755,000.000
|
$800,000.000
|
|
|
RAPID SETTING FIBER REINF CONC (RSFRC)
|
CY
|
18.400
|
$7,500.000
|
$5,000.000
|
$6,500.000
|
|
|
STR STEEL (PRESS BRAKE)
|
LB
|
187,386.000
|
$4.100
|
$3.000
|
$9.500
|
|
|
DEWATERING REPORTS
|
EA
|
20.000
|
$60.000
|
$60.000
|
$60.000
|
|
Totals: |
$4,462,426.100
|
$5,991,100.000
|
$8,396,936.500
|