|
|
REMOVING STAB BASE AND ASPH PAV(8")
|
SY
|
32,253.000
|
$12.000
|
$9.750
|
$10.630
|
$15.830
|
$20.000
|
$20.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
52.000
|
$1,200.000
|
$1,525.000
|
$1,740.810
|
$3,377.340
|
$450.000
|
$5,000.000
|
|
|
BACKFILL (TY B)
|
STA
|
78.000
|
$220.000
|
$610.000
|
$181.510
|
$706.920
|
$450.000
|
$531.000
|
|
|
BLADING
|
HR
|
40.000
|
$175.000
|
$400.000
|
$787.810
|
$195.460
|
$150.000
|
$176.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
20,080.000
|
$0.350
|
$0.460
|
$0.560
|
$0.460
|
$1.000
|
$0.550
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
20,080.000
|
$2.100
|
$3.420
|
$2.110
|
$1.730
|
$6.500
|
$2.350
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$150.000
|
$175.000
|
$169.320
|
$170.720
|
$150.000
|
$128.000
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
2,293.000
|
$1.100
|
$4.990
|
$8.550
|
$8.390
|
$6.000
|
$5.600
|
|
|
PRIME COAT (AE-P)
|
GAL
|
8,949.000
|
$9.000
|
$4.720
|
$5.270
|
$9.660
|
$10.000
|
$7.200
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
246.000
|
$10.000
|
$14.000
|
$20.460
|
$14.560
|
$10.000
|
$24.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
16,122.000
|
$4.820
|
$5.640
|
$6.010
|
$5.800
|
$10.000
|
$6.000
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
389.000
|
$170.000
|
$270.000
|
$396.990
|
$290.170
|
$350.000
|
$315.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
3,000.000
|
$50.000
|
$92.000
|
$143.580
|
$91.000
|
$100.000
|
$76.000
|
|
|
CEM STABIL BKFL
|
CY
|
71.000
|
$275.000
|
$345.000
|
$526.060
|
$345.000
|
$350.000
|
$162.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
18.000
|
$630.000
|
$977.500
|
$1,220.430
|
$977.500
|
$650.000
|
$1,100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
48.000
|
$120.000
|
$132.250
|
$195.760
|
$132.250
|
$105.000
|
$200.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
152.000
|
$150.000
|
$264.500
|
$282.420
|
$264.500
|
$200.000
|
$214.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
174.000
|
$220.000
|
$373.750
|
$378.610
|
$373.750
|
$250.000
|
$240.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
4.000
|
$1,400.000
|
$2,587.500
|
$2,300.270
|
$2,587.500
|
$1,850.000
|
$2,060.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$3,500.000
|
$4,600.000
|
$3,080.270
|
$4,600.000
|
$3,500.000
|
$5,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$6,000.000
|
$8,625.000
|
$5,668.800
|
$8,625.000
|
$4,000.000
|
$6,000.000
|
|
|
REMOV STR (SET)
|
EA
|
10.000
|
$1,000.000
|
$1,150.000
|
$1,316.040
|
$1,150.000
|
$500.000
|
$642.000
|
|
|
REMOV STR (PIPE)
|
EA
|
5.000
|
$800.000
|
$345.000
|
$3,948.130
|
$345.000
|
$500.000
|
$1,800.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$571,945.060
|
$483,000.000
|
$313,516.240
|
$418,524.040
|
$700,000.000
|
$830,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$30,000.000
|
$40,000.000
|
$5,235.260
|
$45,918.700
|
$8,500.000
|
$55,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
680.000
|
$9.000
|
$16.000
|
$14.050
|
$11.500
|
$18.000
|
$11.530
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
680.000
|
$2.000
|
$3.000
|
$4.220
|
$3.450
|
$9.000
|
$3.620
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
14,660.000
|
$0.350
|
$0.290
|
$0.800
|
$0.290
|
$0.500
|
$0.320
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
7,330.000
|
$0.200
|
$0.630
|
$0.800
|
$0.630
|
$1.000
|
$0.320
|
|
|
CONDT (PVC) (SCH 40) (1 1/4")
|
LF
|
142.000
|
$15.000
|
$34.500
|
$42.160
|
$34.500
|
$40.000
|
$30.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
256.000
|
$2.500
|
$3.450
|
$4.220
|
$3.450
|
$6.000
|
$3.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
64.000
|
$40.000
|
$57.500
|
$70.270
|
$57.500
|
$45.000
|
$50.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
31.000
|
$840.000
|
$902.750
|
$1,103.250
|
$902.750
|
$1,100.000
|
$785.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$900.000
|
$1,104.000
|
$1,349.200
|
$1,104.000
|
$1,100.000
|
$960.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,250.000
|
$1,396.100
|
$1,706.170
|
$1,396.100
|
$1,100.000
|
$1,214.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$1,250.000
|
$1,476.600
|
$1,804.550
|
$1,476.600
|
$1,100.000
|
$1,284.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
39.000
|
$150.000
|
$175.000
|
$152.140
|
$186.300
|
$500.000
|
$250.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
10.000
|
$24.500
|
$110.000
|
$76.070
|
$80.730
|
$100.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
10.000
|
$138.000
|
$93.150
|
$113.840
|
$93.150
|
$100.000
|
$81.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
60,240.000
|
$0.500
|
$0.320
|
$0.390
|
$0.320
|
$0.500
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
160.000
|
$10.000
|
$5.180
|
$6.320
|
$5.180
|
$10.000
|
$4.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
7,530.000
|
$0.500
|
$0.400
|
$0.490
|
$0.400
|
$0.650
|
$0.350
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,650.000
|
$1.800
|
$2.690
|
$1.870
|
$7.970
|
$250.000
|
$2.330
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,260.000
|
$1.800
|
$2.690
|
$1.600
|
$7.080
|
$1.500
|
$1.770
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
301.000
|
$1.500
|
$2.300
|
$2.810
|
$2.300
|
$20.000
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,497.000
|
$1.000
|
$1.130
|
$1.380
|
$1.130
|
$20.000
|
$0.980
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
32.000
|
$10.000
|
$16.100
|
$19.680
|
$16.100
|
$1.500
|
$14.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
652.000
|
$8.600
|
$8.050
|
$9.840
|
$8.050
|
$1.500
|
$7.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
14,891.000
|
$0.950
|
$0.900
|
$1.100
|
$0.900
|
$1.500
|
$0.780
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
951.000
|
$0.820
|
$0.980
|
$1.190
|
$0.980
|
$1.500
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
10,424.000
|
$1.000
|
$0.900
|
$1.100
|
$0.900
|
$1.500
|
$0.780
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
12.000
|
$230.000
|
$322.000
|
$393.520
|
$322.000
|
$500.000
|
$280.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$300.000
|
$402.500
|
$491.900
|
$402.500
|
$500.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
14.000
|
$34.000
|
$28.750
|
$35.140
|
$28.750
|
$150.000
|
$25.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
183.000
|
$5.000
|
$5.180
|
$6.320
|
$5.180
|
$6.000
|
$4.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
619.000
|
$4.250
|
$4.030
|
$4.920
|
$4.030
|
$6.000
|
$3.500
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$300.000
|
$575.000
|
$702.710
|
$575.000
|
$550.000
|
$500.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
4.000
|
$300.000
|
$575.000
|
$702.710
|
$575.000
|
$550.000
|
$500.000
|
|
|
BACK PLATE (12")(1 SEC)(VENTED)ALUM
|
EA
|
12.000
|
$114.000
|
$172.500
|
$210.810
|
$172.500
|
$250.000
|
$150.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
256.000
|
$2.500
|
$6.900
|
$8.430
|
$6.900
|
$5.000
|
$6.000
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
6.000
|
$1,000.000
|
$862.500
|
$1,054.060
|
$862.500
|
$1,500.000
|
$750.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
6.000
|
$12,000.000
|
$18,975.000
|
$23,189.320
|
$18,975.000
|
$20,000.000
|
$16,500.000
|
|
|
D-GR HMA TY-D SAC-B PG64-22
|
TON
|
433.000
|
$220.000
|
$397.000
|
$276.410
|
$304.930
|
$200.000
|
$224.000
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
19,105.000
|
$165.000
|
$138.500
|
$188.030
|
$170.080
|
$160.000
|
$215.000
|
|
|
TACK COAT
|
GAL
|
3,397.000
|
$6.500
|
$4.440
|
$3.270
|
$16.150
|
$6.000
|
$8.100
|
|
|
TOM-C SAC-A
|
TON
|
2,446.000
|
$220.000
|
$165.000
|
$271.930
|
$218.310
|
$250.000
|
$215.000
|
|
|
BONDING COURSE
|
GAL
|
3,397.000
|
$8.000
|
$4.780
|
$3.270
|
$6.490
|
$10.000
|
$4.600
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$16,000.000
|
$24,000.000
|
$13,073.130
|
$12,500.000
|
$16,500.000
|
$25,517.690
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
4.000
|
$13,000.000
|
$10,800.000
|
$10,767.510
|
$5,500.000
|
$30,000.000
|
$17,862.390
|
|
|
TMA (STATIONARY)
|
DAY
|
292.000
|
$220.000
|
$180.000
|
$70.270
|
$439.510
|
$250.000
|
$391.270
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
198.000
|
$85.000
|
$97.750
|
$51.070
|
$517.350
|
$85.000
|
$131.500
|
|
Totals: |
$6,153,195.620
|
$5,880,107.870
|
$6,805,088.740
|
$6,998,460.870
|
$7,428,407.500
|
$8,347,141.350
|