PREPARING ROW
|
STA
|
4.000
|
$25,000.000
|
$750,000.000
|
$269,000.000
|
$12,789.580
|
$250,000.000
|
$825,000.000
|
$50,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
36.000
|
$41.000
|
$22.000
|
$100.000
|
$124.230
|
$68.000
|
$25.000
|
$100.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,088.000
|
$28.000
|
$30.000
|
$30.000
|
$20.740
|
$75.000
|
$70.000
|
$35.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
430.000
|
$35.000
|
$30.000
|
$50.000
|
$23.400
|
$100.000
|
$135.000
|
$95.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
662.000
|
$28.000
|
$30.000
|
$50.000
|
$27.950
|
$100.000
|
$90.000
|
$70.000
|
|
|
BLADING
|
HR
|
16.000
|
$159.000
|
$180.000
|
$150.000
|
$2,460.990
|
$160.000
|
$110.000
|
$355.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
3,803.000
|
$1.500
|
$0.790
|
$1.000
|
$1.180
|
$0.450
|
$1.000
|
$0.510
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
951.000
|
$1.700
|
$1.500
|
$3.000
|
$0.510
|
$0.350
|
$1.500
|
$0.460
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
951.000
|
$1.700
|
$1.500
|
$3.000
|
$0.510
|
$0.350
|
$1.500
|
$0.460
|
|
|
VEGETATIVE WATERING
|
MG
|
33.000
|
$65.000
|
$50.000
|
$40.000
|
$82.940
|
$40.000
|
$40.000
|
$56.840
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
924.000
|
$105.000
|
$145.000
|
$200.000
|
$232.860
|
$142.280
|
$225.000
|
$200.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
3,160.000
|
$6.700
|
$7.000
|
$7.000
|
$16.620
|
$14.000
|
$11.000
|
$6.350
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
37.700
|
$394.000
|
$352.000
|
$350.000
|
$310.140
|
$350.000
|
$430.000
|
$400.000
|
|
|
CEMENT
|
TON
|
22.700
|
$277.000
|
$200.000
|
$225.000
|
$202.760
|
$350.000
|
$385.000
|
$400.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
3,160.000
|
$5.000
|
$5.250
|
$7.000
|
$21.180
|
$14.000
|
$6.000
|
$6.350
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
6,317.000
|
$25.000
|
$28.500
|
$40.000
|
$34.850
|
$40.120
|
$33.000
|
$50.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
347.700
|
$230.000
|
$170.000
|
$200.000
|
$271.740
|
$225.000
|
$230.000
|
$255.440
|
|
|
ASPH (RC-250)
|
GAL
|
804.000
|
$12.000
|
$5.750
|
$25.000
|
$6.660
|
$7.500
|
$8.000
|
$16.980
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
29.000
|
$150.000
|
$350.000
|
$500.000
|
$405.200
|
$695.000
|
$675.000
|
$594.130
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
47.000
|
$200.000
|
$350.000
|
$500.000
|
$405.200
|
$715.000
|
$500.000
|
$521.830
|
|
|
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
|
GAL
|
1,608.000
|
$7.500
|
$5.500
|
$20.000
|
$6.370
|
$20.000
|
$7.750
|
$15.340
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
20.000
|
$151.000
|
$375.000
|
$500.000
|
$434.150
|
$326.000
|
$725.000
|
$427.190
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
5,749.000
|
$130.000
|
$90.000
|
$140.000
|
$57.740
|
$140.000
|
$165.000
|
$146.650
|
|
|
CONC PVMT (CRCP)(JCT TERMINAL)(10")
|
SY
|
374.000
|
$130.000
|
$125.000
|
$180.000
|
$15.930
|
$242.000
|
$165.000
|
$196.300
|
|
|
CEM STABIL BKFL
|
CY
|
345.000
|
$223.000
|
$140.000
|
$150.000
|
$123.480
|
$500.000
|
$325.000
|
$250.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
22,240.000
|
$30.000
|
$1.000
|
$20.000
|
$118.480
|
$21.600
|
$0.010
|
$1.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
192.000
|
$170.000
|
$300.000
|
$525.000
|
$1,068.510
|
$190.000
|
$500.000
|
$500.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
945.000
|
$310.000
|
$333.000
|
$525.000
|
$1,225.980
|
$439.000
|
$525.000
|
$700.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
2,010.000
|
$500.000
|
$450.000
|
$650.000
|
$1,209.230
|
$541.000
|
$700.000
|
$760.000
|
|
|
DRILL SHAFT (84 IN)
|
LF
|
2,259.000
|
$2,100.000
|
$1,925.000
|
$3,000.000
|
$3,331.810
|
$2,388.000
|
$2,735.000
|
$2,750.000
|
|
|
CL C CONC (ABUT)
|
CY
|
123.700
|
$2,000.000
|
$1,300.000
|
$2,500.000
|
$2,636.900
|
$3,200.000
|
$2,000.000
|
$2,000.000
|
|
|
CL C CONC (CAP)
|
CY
|
478.500
|
$2,000.000
|
$1,750.000
|
$2,500.000
|
$2,675.460
|
$3,100.000
|
$3,600.000
|
$2,500.000
|
|
|
CL C CONC (CAP)(MASS)
|
CY
|
633.100
|
$2,000.000
|
$1,025.000
|
$2,800.000
|
$2,170.240
|
$3,000.000
|
$2,200.000
|
$3,600.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
249.800
|
$2,000.000
|
$1,500.000
|
$2,500.000
|
$1,866.180
|
$3,000.000
|
$3,250.000
|
$2,100.000
|
|
|
REINF CONC SLAB
|
SF
|
90,174.000
|
$40.000
|
$22.250
|
$34.000
|
$38.000
|
$43.500
|
$42.000
|
$72.000
|
|
|
APPROACH SLAB
|
CY
|
189.000
|
$815.000
|
$610.000
|
$1,000.000
|
$1,435.990
|
$1,550.000
|
$900.000
|
$1,315.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
2,059.240
|
$200.000
|
$230.000
|
$200.000
|
$294.520
|
$326.000
|
$240.000
|
$305.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
6,083.900
|
$330.000
|
$250.000
|
$220.000
|
$257.290
|
$336.000
|
$260.000
|
$345.000
|
|
|
PRESTR CONC GIRDER (TX70)
|
LF
|
3,594.240
|
$400.000
|
$290.000
|
$240.000
|
$347.390
|
$411.000
|
$315.000
|
$425.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
83.000
|
$710.000
|
$605.000
|
$650.000
|
$165.640
|
$605.000
|
$850.000
|
$698.590
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,513.000
|
$195.000
|
$225.000
|
$1.000
|
$165.320
|
$221.500
|
$525.000
|
$325.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
61.000
|
$710.000
|
$615.000
|
$800.000
|
$169.620
|
$695.000
|
$950.000
|
$802.510
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
4,418.000
|
$80.000
|
$65.000
|
$67.000
|
$158.690
|
$80.000
|
$95.000
|
$120.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
467.000
|
$222.000
|
$220.000
|
$250.000
|
$286.170
|
$215.000
|
$370.000
|
$500.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
20.000
|
$118.000
|
$150.000
|
$175.000
|
$171.240
|
$150.000
|
$170.000
|
$320.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
51.000
|
$145.000
|
$140.000
|
$170.000
|
$167.300
|
$150.000
|
$175.000
|
$400.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
393.000
|
$155.000
|
$105.000
|
$140.000
|
$140.190
|
$150.000
|
$150.000
|
$360.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 2)
|
LF
|
308.000
|
$244.000
|
$205.000
|
$260.000
|
$391.680
|
$150.000
|
$275.000
|
$500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,450.000
|
$1,820.000
|
$3,500.000
|
$6,302.440
|
$3,000.000
|
$6,000.000
|
$7,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
701.000
|
$24.000
|
$18.000
|
$35.000
|
$31.520
|
$18.000
|
$32.000
|
$100.000
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
2.000
|
$1,000,000.000
|
$2,500,000.000
|
$2,300,000.000
|
$835,456.760
|
$1,500,000.000
|
$1,750,000.000
|
$1,225,000.000
|
|
|
REMOV STR (SMALL)
|
EA
|
2.000
|
$2,030.000
|
$1,000.000
|
$250.000
|
$5,805.750
|
$1,600.000
|
$1,500.000
|
$5,884.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,394,000.000
|
$3,500,000.000
|
$3,200,000.000
|
$2,000,000.000
|
$3,390,000.000
|
$3,700,000.000
|
$3,509,639.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
31.000
|
$20,000.000
|
$75,000.000
|
$9,000.000
|
$12,123.240
|
$14,600.000
|
$25,000.000
|
$14,500.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
5.000
|
$13.000
|
$12.000
|
$10.000
|
$1.160
|
$30.000
|
$20.000
|
$27.380
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,507.000
|
$4.700
|
$3.400
|
$3.500
|
$9.260
|
$3.750
|
$5.500
|
$4.130
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,507.000
|
$1.500
|
$1.000
|
$0.500
|
$2.620
|
$2.000
|
$1.000
|
$2.220
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
80.000
|
$10.000
|
$10.000
|
$10.000
|
$18.960
|
$8.500
|
$18.000
|
$10.170
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
80.000
|
$2.000
|
$2.000
|
$2.000
|
$13.110
|
$2.000
|
$5.000
|
$3.050
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,200.000
|
$200.000
|
$200.000
|
$200.000
|
$147.150
|
$300.000
|
$275.000
|
$250.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
2,760.000
|
$70.000
|
$175.000
|
$120.000
|
$80.750
|
$100.000
|
$100.000
|
$450.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$67.000
|
$175.000
|
$120.000
|
$103.590
|
$105.000
|
$100.000
|
$450.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
2,680.000
|
$15.000
|
$10.000
|
$12.000
|
$10.790
|
$6.000
|
$9.000
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$18.000
|
$15.000
|
$12.000
|
$13.870
|
$50.000
|
$9.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
2,760.000
|
$20.000
|
$15.000
|
$10.000
|
$13.870
|
$6.000
|
$12.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$20.000
|
$15.000
|
$10.000
|
$13.870
|
$50.000
|
$12.000
|
$20.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
925.000
|
$30.000
|
$23.950
|
$26.000
|
$19.070
|
$29.360
|
$50.000
|
$26.750
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$2,500.000
|
$1,684.000
|
$2,000.000
|
$1,341.010
|
$1,684.000
|
$3,750.000
|
$1,880.710
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,050.000
|
$6.000
|
$2.250
|
$4.000
|
$1.790
|
$6.000
|
$10.000
|
$2.510
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$300.000
|
$180.000
|
$250.000
|
$143.340
|
$361.290
|
$500.000
|
$201.030
|
|
|
MTL BM GD FEN (REMOVE & REINSTALL)
|
LF
|
175.000
|
$50.000
|
$16.000
|
$20.000
|
$12.740
|
$16.000
|
$35.000
|
$17.870
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$3,200.000
|
$3,157.000
|
$3,300.000
|
$2,514.000
|
$3,157.000
|
$5,000.000
|
$3,525.770
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
1.000
|
$1,000.000
|
$1,260.000
|
$1,400.000
|
$1,003.400
|
$1,260.000
|
$850.000
|
$1,407.180
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$300.000
|
$250.000
|
$320.000
|
$199.090
|
$250.000
|
$550.000
|
$279.200
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
62.000
|
$100.000
|
$40.000
|
$48.000
|
$31.850
|
$287.000
|
$55.000
|
$87.000
|
|
|
CONDT (RM) (4")
|
LF
|
1,862.000
|
$150.000
|
$205.000
|
$210.000
|
$163.250
|
$163.000
|
$280.000
|
$133.000
|
|
|
CONDT (HDPE) (1 1/4")
|
LF
|
2,793.000
|
$100.000
|
$5.000
|
$5.500
|
$3.980
|
$101.000
|
$7.000
|
$116.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$900.000
|
$832.000
|
$1,000.000
|
$662.550
|
$550.000
|
$1,800.000
|
$929.190
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
2.000
|
$1,200.000
|
$1,128.000
|
$1,200.000
|
$898.260
|
$1,128.000
|
$3,200.000
|
$1,259.760
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
2.000
|
$600.000
|
$291.000
|
$350.000
|
$231.750
|
$291.000
|
$800.000
|
$324.990
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
1.000
|
$600.000
|
$330.000
|
$350.000
|
$262.800
|
$330.000
|
$1,100.000
|
$368.550
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
10.000
|
$2,500.000
|
$2,390.000
|
$2,400.000
|
$1,903.220
|
$2,710.000
|
$3,300.000
|
$2,669.180
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
7.000
|
$130.000
|
$100.000
|
$120.000
|
$79.630
|
$600.000
|
$200.000
|
$111.680
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
92.000
|
$35.000
|
$15.000
|
$18.000
|
$11.950
|
$15.000
|
$40.000
|
$16.750
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
92.000
|
$35.000
|
$15.000
|
$18.000
|
$11.950
|
$15.000
|
$40.000
|
$16.750
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
36.000
|
$35.000
|
$21.000
|
$23.000
|
$16.720
|
$21.000
|
$65.000
|
$23.450
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
20.000
|
$40.000
|
$21.000
|
$23.000
|
$16.720
|
$21.000
|
$65.000
|
$23.450
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
1,540.000
|
$1.000
|
$2.250
|
$3.000
|
$1.790
|
$0.850
|
$2.100
|
$2.510
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
22,084.000
|
$1.000
|
$0.850
|
$1.000
|
$0.680
|
$0.850
|
$1.850
|
$0.950
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
21,257.000
|
$1.000
|
$0.850
|
$1.000
|
$0.680
|
$0.850
|
$1.850
|
$0.950
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
910.000
|
$2.400
|
$2.500
|
$3.000
|
$1.990
|
$2.500
|
$30.000
|
$2.790
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
2,450.000
|
$1.600
|
$2.000
|
$2.500
|
$1.590
|
$2.000
|
$1.500
|
$2.230
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
11,350.000
|
$1.400
|
$0.950
|
$1.100
|
$0.760
|
$0.950
|
$1.500
|
$1.060
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
9,345.000
|
$1.200
|
$0.950
|
$1.100
|
$0.760
|
$0.950
|
$1.500
|
$1.060
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
127.000
|
$7.100
|
$6.000
|
$7.000
|
$4.780
|
$6.000
|
$15.000
|
$6.700
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$50,000.000
|
$20,000.000
|
$13,159.500
|
$21,270.000
|
$25,000.000
|
$25,000.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$10,000.000
|
$20,000.000
|
$15,000.000
|
$6,552.750
|
$10,797.000
|
$15,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$300.000
|
$750.000
|
$200.000
|
$619.400
|
$400.000
|
$650.000
|
$750.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$300.000
|
$750.000
|
$600.000
|
$1,114.230
|
$700.000
|
$1,800.000
|
$975.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
9,040.000
|
$1.000
|
$0.600
|
$0.750
|
$0.480
|
$0.600
|
$1.500
|
$1.100
|
|
Totals: |
$26,875,955.700
|
$30,981,397.220
|
$32,441,315.100
|
$32,666,406.665
|
$33,981,439.180
|
$37,349,665.950
|
$37,410,600.168
|