PREPARING ROW
|
STA
|
4.000
|
$4,000.000
|
$103,500.000
|
$35,000.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
2,946.000
|
$20.000
|
$7.300
|
$21.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,120.000
|
$20.000
|
$70.000
|
$94.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
1,139.000
|
$22.000
|
$30.000
|
$94.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
1,875.000
|
$25.000
|
$30.000
|
$94.000
|
|
|
BLADING
|
HR
|
20.000
|
$150.000
|
$170.000
|
$156.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
6,923.000
|
$3.000
|
$1.250
|
$4.600
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
6,923.000
|
$1.000
|
$0.750
|
$0.750
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
1,731.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
1,731.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
233.500
|
$75.000
|
$65.000
|
$32.200
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
2,025.000
|
$3.000
|
$2.000
|
$2.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
1,076.000
|
$100.000
|
$135.000
|
$180.600
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
80.000
|
$295.000
|
$296.000
|
$440.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
4,978.000
|
$5.000
|
$7.000
|
$9.600
|
|
|
ASPH (RC-250)
|
GAL
|
959.000
|
$7.500
|
$10.000
|
$10.300
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
36.000
|
$240.000
|
$240.000
|
$552.500
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
58.000
|
$190.000
|
$240.000
|
$580.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
1,916.000
|
$5.000
|
$10.000
|
$10.300
|
|
|
CEM STABIL BKFL
|
CY
|
146.000
|
$200.000
|
$140.000
|
$250.560
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
900.000
|
$200.000
|
$110.000
|
$432.000
|
|
|
PRESTR CONC PIL (24 IN SQ)
|
LF
|
1,566.000
|
$220.000
|
$180.000
|
$652.850
|
|
|
CL C CONC (ABUT)
|
CY
|
56.600
|
$1,500.000
|
$940.000
|
$1,619.980
|
|
|
CL C CONC (CAP)
|
CY
|
103.300
|
$1,550.000
|
$1,600.000
|
$1,943.980
|
|
|
REINF CONC SLAB
|
SF
|
18,400.000
|
$25.000
|
$23.000
|
$37.610
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
2,382.000
|
$320.000
|
$185.000
|
$186.840
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
643.000
|
$200.000
|
$215.000
|
$264.600
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,085.000
|
$195.000
|
$215.000
|
$264.600
|
|
|
RAIL (TY SSTR)
|
LF
|
848.000
|
$120.000
|
$77.000
|
$129.600
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
137.000
|
$185.000
|
$200.000
|
$162.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$115,000.000
|
$1,000,000.000
|
$593,994.200
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$342,119.000
|
$620,000.000
|
$750,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$3,800.000
|
$8,000.000
|
$1,612.650
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
60.000
|
$50.000
|
$75.300
|
$75.300
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
60.000
|
$15.000
|
$12.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,409.000
|
$4.000
|
$4.250
|
$4.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,409.000
|
$1.000
|
$0.750
|
$0.750
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
462.500
|
$25.000
|
$30.400
|
$25.090
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,300.000
|
$2,780.000
|
$2,012.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
555.000
|
$4.000
|
$3.800
|
$2.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,300.000
|
$3,241.850
|
$3,086.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$433.550
|
$343.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
3.000
|
$550.000
|
$422.100
|
$910.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$100.000
|
$100.050
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
10.000
|
$80.000
|
$31.280
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
4.000
|
$35.000
|
$37.030
|
$20.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
4.000
|
$35.000
|
$55.430
|
$125.000
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
800.000
|
$1.000
|
$0.220
|
$0.220
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
800.000
|
$1.000
|
$0.220
|
$0.220
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
33.000
|
$6.000
|
$5.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,600.000
|
$1.000
|
$0.100
|
$0.100
|
|
|
NO. OF WORKING DAYS
|
$/D
|
10,462.000
|
$280.000
|
$200.000
|
$280.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
1,034.000
|
$150.000
|
$200.000
|
$164.500
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
496.000
|
$160.000
|
$200.000
|
$235.400
|
|
|
TACK COAT
|
GAL
|
920.000
|
$5.000
|
$10.000
|
$18.800
|
|
|
TEMP CONSTRUCTION ACCESS
|
LS
|
1.000
|
$300,000.000
|
$1,300,000.000
|
$1,298,996.740
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$9,200.000
|
$20,000.000
|
$17,000.000
|
|
|
HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MIL
|
LF
|
2,584.000
|
$1.000
|
$1.400
|
$1.400
|
|
|
HPPM-RIB W/RET REQ TYI(Y)6"(SLD)100MIL
|
LF
|
2,584.000
|
$1.000
|
$1.400
|
$1.400
|
|
Totals: |
$6,960,034.500
|
$8,376,282.190
|
$10,478,530.007
|