PREPARING ROW
|
STA
|
19.500
|
$1,000.000
|
$360.000
|
$3,400.000
|
$1,500.000
|
$2,000.000
|
$1,098.980
|
$14,250.000
|
$23,000.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
194.000
|
$30.000
|
$15.000
|
$25.000
|
$7.000
|
$20.000
|
$26.400
|
$11.600
|
$30.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
5,986.000
|
$6.000
|
$7.000
|
$8.500
|
$8.000
|
$9.000
|
$7.700
|
$5.000
|
$6.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
5,291.000
|
$13.000
|
$5.000
|
$16.000
|
$16.000
|
$20.000
|
$19.800
|
$25.000
|
$50.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
190.000
|
$23.000
|
$20.000
|
$15.000
|
$30.000
|
$20.000
|
$36.300
|
$30.000
|
$60.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
5,551.000
|
$15.000
|
$10.000
|
$22.000
|
$28.000
|
$25.000
|
$23.100
|
$5.000
|
$12.000
|
|
|
EMBANK (VEH)(OC)(TY C)
|
CY
|
2,070.000
|
$20.000
|
$30.000
|
$29.000
|
$28.000
|
$25.000
|
$23.100
|
$5.000
|
$1.000
|
|
|
BLADING
|
HR
|
28.000
|
$120.000
|
$100.000
|
$140.000
|
$94.000
|
$100.000
|
$99.000
|
$175.000
|
$190.000
|
|
|
FURN & PLACE TOPSOIL (3")
|
SY
|
24,225.000
|
$5.000
|
$3.000
|
$1.200
|
$3.000
|
$3.000
|
$1.430
|
$2.000
|
$2.000
|
|
|
BROADCAST SEED (PERM_RURAL_CLAY)
|
SY
|
24,225.000
|
$1.000
|
$0.150
|
$0.450
|
$0.320
|
$0.500
|
$0.190
|
$0.180
|
$0.800
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
6,057.000
|
$1.000
|
$0.150
|
$0.300
|
$0.270
|
$1.000
|
$0.120
|
$0.110
|
$0.600
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
6,057.000
|
$1.000
|
$0.150
|
$0.350
|
$0.270
|
$1.000
|
$0.120
|
$0.110
|
$0.400
|
|
|
VEGETATIVE WATERING
|
TGL
|
204.000
|
$50.000
|
$1.000
|
$65.000
|
$60.000
|
$1.000
|
$23.100
|
$45.000
|
$50.000
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_SHORT_ROLL)
|
SY
|
3,635.000
|
$3.000
|
$2.500
|
$4.000
|
$3.500
|
$3.000
|
$2.240
|
$2.070
|
$6.000
|
|
|
FL BS (CMP IN PLC)(TY E GR 5)(FNAL POS)
|
CY
|
2,008.000
|
$75.000
|
$99.000
|
$140.000
|
$110.000
|
$110.000
|
$120.130
|
$130.000
|
$135.000
|
|
|
CEMENT
|
TON
|
114.000
|
$210.000
|
$235.000
|
$263.000
|
$238.000
|
$150.000
|
$247.500
|
$225.000
|
$200.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
9,301.000
|
$5.000
|
$3.500
|
$2.000
|
$4.600
|
$7.000
|
$2.200
|
$4.000
|
$6.000
|
|
|
ASPH (RC-250)
|
GAL
|
1,698.000
|
$7.000
|
$6.000
|
$4.500
|
$4.200
|
$5.000
|
$7.150
|
$6.000
|
$10.000
|
|
|
AGGR (TY-E, GR-5)(SAC-B)
|
CY
|
66.000
|
$800.000
|
$550.000
|
$175.000
|
$358.000
|
$440.000
|
$181.500
|
$250.000
|
$250.000
|
|
|
AGGR (TY-PE, GR-4)(SAC-B)
|
CY
|
233.000
|
$450.000
|
$350.000
|
$160.000
|
$221.000
|
$400.000
|
$210.230
|
$250.000
|
$260.000
|
|
|
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
|
GAL
|
10,044.000
|
$5.000
|
$5.000
|
$4.200
|
$4.200
|
$5.000
|
$4.620
|
$7.000
|
$5.000
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
1,336.000
|
$90.000
|
$160.000
|
$157.300
|
$157.000
|
$120.000
|
$128.700
|
$200.000
|
$125.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
1,717.000
|
$80.000
|
$165.000
|
$160.000
|
$153.000
|
$140.000
|
$146.300
|
$210.000
|
$135.000
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
272.000
|
$105.000
|
$230.000
|
$220.000
|
$165.000
|
$190.000
|
$172.700
|
$210.000
|
$165.000
|
|
|
TACK COAT
|
GAL
|
2,069.000
|
$3.500
|
$8.000
|
$4.500
|
$4.250
|
$5.000
|
$3.520
|
$6.000
|
$5.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
444.000
|
$6.000
|
$23.000
|
$21.000
|
$18.000
|
$25.000
|
$11.220
|
$7.300
|
$10.000
|
|
|
CEM STABIL BKFL
|
CY
|
150.000
|
$205.000
|
$150.000
|
$205.000
|
$190.000
|
$200.000
|
$200.000
|
$100.000
|
$100.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
387.000
|
$25.000
|
$1.000
|
$60.000
|
$88.000
|
$30.000
|
$35.000
|
$35.000
|
$100.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
2,108.000
|
$225.000
|
$206.000
|
$205.000
|
$208.000
|
$200.000
|
$368.000
|
$130.000
|
$150.000
|
|
|
CL B CONC (FLUME)
|
CY
|
16.200
|
$900.000
|
$820.000
|
$650.000
|
$700.000
|
$750.000
|
$165.000
|
$590.000
|
$1,500.000
|
|
|
CL C CONC (ABUT)
|
CY
|
37.400
|
$1,800.000
|
$1,200.000
|
$1,425.000
|
$3,600.000
|
$1,500.000
|
$2,000.000
|
$1,500.000
|
$4,250.000
|
|
|
CL C CONC (CAP)
|
CY
|
33.000
|
$1,800.000
|
$2,500.000
|
$1,550.000
|
$2,100.000
|
$2,000.000
|
$2,000.000
|
$1,750.000
|
$2,500.000
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
7,659.000
|
$25.000
|
$25.000
|
$20.000
|
$21.000
|
$23.000
|
$27.500
|
$22.000
|
$30.000
|
|
|
APPROACH SLAB
|
CY
|
71.200
|
$875.000
|
$900.000
|
$850.000
|
$824.000
|
$650.000
|
$800.000
|
$640.000
|
$1,300.000
|
|
|
SHEAR KEY
|
CY
|
39.000
|
$900.000
|
$700.000
|
$465.000
|
$647.000
|
$450.000
|
$600.000
|
$320.000
|
$300.000
|
|
|
PRESTR CONC BOX BEAM (4B20)
|
LF
|
654.000
|
$345.000
|
$285.000
|
$304.000
|
$246.000
|
$260.000
|
$270.000
|
$275.000
|
$300.000
|
|
|
PRESTR CONC BOX BEAM (5B20)
|
LF
|
981.000
|
$375.000
|
$285.000
|
$304.000
|
$260.000
|
$260.000
|
$270.000
|
$275.000
|
$300.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
2,194.000
|
$100.000
|
$170.000
|
$226.000
|
$178.000
|
$200.000
|
$185.000
|
$220.000
|
$225.000
|
|
|
RAIL (TY SSTR)
|
LF
|
362.000
|
$400.000
|
$160.000
|
$110.000
|
$148.000
|
$120.000
|
$180.000
|
$115.000
|
$265.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
92.000
|
$275.000
|
$285.000
|
$265.000
|
$214.000
|
$235.000
|
$255.000
|
$200.000
|
$280.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
168.000
|
$175.000
|
$110.000
|
$75.000
|
$125.000
|
$120.000
|
$121.000
|
$100.000
|
$130.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
56.000
|
$230.000
|
$200.000
|
$100.000
|
$193.000
|
$150.000
|
$152.000
|
$130.000
|
$150.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$2,500.000
|
$2,000.000
|
$1,600.000
|
$2,100.000
|
$2,750.000
|
$4,500.000
|
$1,800.000
|
$1,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$3,000.000
|
$3,000.000
|
$1,800.000
|
$2,600.000
|
$3,000.000
|
$5,600.000
|
$2,280.000
|
$1,100.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$100,000.000
|
$51,000.000
|
$33,000.000
|
$101,000.000
|
$75,000.000
|
$55,000.000
|
$250,000.000
|
$100,000.000
|
|
|
REMOV STR (SMALL)
|
EA
|
4.000
|
$2,700.000
|
$720.000
|
$425.000
|
$1,300.000
|
$500.000
|
$550.000
|
$600.000
|
$800.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$300,000.000
|
$230,000.000
|
$351,000.000
|
$315,000.000
|
$413,792.140
|
$393,896.490
|
$470,000.000
|
$510,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$2,500.000
|
$2,700.000
|
$735.000
|
$2,800.000
|
$2,000.000
|
$5,400.000
|
$25,000.000
|
$10,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$5,000.000
|
$7,500.000
|
$5,750.000
|
$3,000.000
|
$30,000.000
|
$2,500.000
|
$35,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$500.000
|
$60.000
|
$265.000
|
$165.000
|
$200.000
|
$150.000
|
$240.000
|
$325.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$300.000
|
$80.000
|
$400.000
|
$165.000
|
$1.000
|
$250.000
|
$570.000
|
$650.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
230.000
|
$50.000
|
$80.000
|
$58.000
|
$48.000
|
$40.000
|
$45.390
|
$41.970
|
$45.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
230.000
|
$15.000
|
$10.000
|
$22.000
|
$21.000
|
$10.000
|
$14.810
|
$13.700
|
$25.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
100.000
|
$18.000
|
$5.000
|
$18.000
|
$3.250
|
$5.000
|
$13.740
|
$12.000
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
565.000
|
$4.000
|
$5.000
|
$8.000
|
$4.000
|
$4.000
|
$5.010
|
$4.630
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
565.000
|
$1.500
|
$1.000
|
$3.500
|
$1.100
|
$1.000
|
$1.560
|
$1.440
|
$2.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
510.000
|
$35.000
|
$95.000
|
$25.000
|
$97.000
|
$60.000
|
$60.000
|
$95.000
|
$50.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
210.000
|
$10.000
|
$35.000
|
$17.500
|
$18.000
|
$20.000
|
$50.000
|
$13.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
510.000
|
$18.000
|
$25.000
|
$9.000
|
$31.000
|
$20.000
|
$35.000
|
$18.000
|
$50.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
707.000
|
$50.000
|
$15.000
|
$74.000
|
$48.000
|
$40.000
|
$48.400
|
$85.000
|
$40.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
11,786.000
|
$1.000
|
$0.500
|
$0.300
|
$0.300
|
$0.280
|
$0.350
|
$0.250
|
$0.900
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
5,893.000
|
$1.000
|
$0.500
|
$0.400
|
$0.350
|
$0.400
|
$0.510
|
$0.450
|
$0.900
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
225.000
|
$30.000
|
$30.000
|
$28.000
|
$31.500
|
$28.000
|
$29.600
|
$27.900
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
5.000
|
$2,000.000
|
$2,150.000
|
$1,908.000
|
$2,275.000
|
$2,000.000
|
$2,667.540
|
$1,908.000
|
$2,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
390.000
|
$3.000
|
$1.000
|
$4.500
|
$3.400
|
$3.000
|
$3.190
|
$4.500
|
$4.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$250.000
|
$300.000
|
$200.000
|
$295.000
|
$300.000
|
$276.870
|
$200.000
|
$320.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,400.000
|
$3,500.000
|
$3,272.000
|
$3,670.000
|
$3,000.000
|
$3,444.910
|
$3,272.000
|
$4,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,800.000
|
$2,650.000
|
$1,000.000
|
$1,890.000
|
$1,650.000
|
$1,773.040
|
$1,100.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$1,075.000
|
$650.000
|
$919.000
|
$1,000.000
|
$862.560
|
$1,100.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,000.000
|
$8,600.000
|
$9,500.000
|
$9,200.000
|
$9,500.000
|
$8,641.560
|
$12,000.000
|
$8,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
8.000
|
$500.000
|
$615.000
|
$525.000
|
$548.000
|
$625.000
|
$515.000
|
$395.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
2.000
|
$500.000
|
$735.000
|
$625.000
|
$670.000
|
$720.000
|
$630.000
|
$511.000
|
$650.000
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
2.000
|
$500.000
|
$440.000
|
$375.000
|
$302.000
|
$450.000
|
$285.000
|
$390.000
|
$300.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
9.000
|
$100.000
|
$145.000
|
$125.000
|
$160.000
|
$150.000
|
$150.000
|
$85.000
|
$180.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
4.000
|
$29.000
|
$35.000
|
$15.000
|
$26.500
|
$30.000
|
$25.000
|
$21.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
9.000
|
$35.000
|
$50.000
|
$25.000
|
$26.500
|
$30.000
|
$25.000
|
$25.000
|
$30.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
11,830.000
|
$0.350
|
$0.610
|
$0.500
|
$0.550
|
$0.520
|
$0.400
|
$0.470
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
11,830.000
|
$0.400
|
$0.610
|
$0.500
|
$0.550
|
$0.520
|
$0.400
|
$0.470
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
6,111.000
|
$0.900
|
$0.400
|
$0.350
|
$0.350
|
$0.340
|
$1.750
|
$0.850
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
12,291.000
|
$0.900
|
$0.400
|
$0.350
|
$0.350
|
$0.340
|
$1.750
|
$0.850
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
488.000
|
$3.400
|
$0.590
|
$2.750
|
$1.050
|
$2.000
|
$1.600
|
$1.000
|
$2.000
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
12,200.000
|
$0.350
|
$1.290
|
$1.100
|
$1.150
|
$1.100
|
$0.800
|
$1.350
|
$1.000
|
|
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
|
LF
|
1,525.000
|
$0.350
|
$2.930
|
$2.500
|
$2.650
|
$2.500
|
$0.800
|
$1.350
|
$1.000
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
10,000.000
|
$0.350
|
$1.290
|
$1.100
|
$1.150
|
$1.100
|
$0.800
|
$1.350
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
153.000
|
$6.000
|
$8.790
|
$8.000
|
$8.000
|
$7.500
|
$10.000
|
$6.000
|
$11.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
6,513.000
|
$2.000
|
$0.760
|
$0.650
|
$0.700
|
$0.650
|
$1.000
|
$1.000
|
$1.000
|
|
|
ELIM EXT PM & MRKS (RUMBLE STRIP)
|
LF
|
5,935.000
|
$1.000
|
$1.170
|
$2.000
|
$0.270
|
$3.000
|
$2.000
|
$3.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
820.000
|
$0.100
|
$0.120
|
$0.100
|
$0.110
|
$0.100
|
$0.010
|
$0.500
|
$2.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$6,000.000
|
$8,000.000
|
$10,000.000
|
$9,000.000
|
$11,500.000
|
$5,000.000
|
$13,250.000
|
$7,000.000
|
|
Totals: |
$3,915,110.250
|
$3,770,670.020
|
$4,082,179.550
|
$4,088,161.280
|
$4,141,649.250
|
$4,396,983.320
|
$4,788,150.240
|
$5,099,373.100
|