|
|
PREPARING ROW
|
STA
|
104.000
|
$1,000.000
|
$300.000
|
$854.700
|
$410.090
|
$478.230
|
$2,820.000
|
|
|
SUBGR WIDEN (OC)
|
STA
|
275.600
|
$320.000
|
$400.000
|
$854.700
|
$413.810
|
$302.630
|
$210.000
|
|
|
EMBANK (FNL)(OC)(TY C)
|
CY
|
2,205.000
|
$24.000
|
$23.000
|
$19.800
|
$18.980
|
$35.490
|
$20.000
|
|
|
EMBANK (VEH)(OC)(TY C)
|
CY
|
387.000
|
$30.000
|
$26.000
|
$24.200
|
$22.430
|
$45.070
|
$20.000
|
|
|
BLADING
|
HR
|
20.000
|
$110.000
|
$150.000
|
$99.000
|
$102.500
|
$52.830
|
$194.000
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
360.000
|
$0.750
|
$0.500
|
$1.000
|
$1.000
|
$0.310
|
$1.000
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
360.000
|
$0.750
|
$0.500
|
$1.000
|
$1.000
|
$0.350
|
$1.000
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
91,867.000
|
$0.150
|
$0.360
|
$0.230
|
$0.230
|
$0.220
|
$0.250
|
|
|
DRILL SEED (TEMP_WARM)
|
SY
|
22,967.000
|
$0.200
|
$0.360
|
$0.190
|
$0.190
|
$0.220
|
$0.250
|
|
|
DRILL SEED (TEMP_COOL)
|
SY
|
22,967.000
|
$0.200
|
$0.360
|
$0.190
|
$0.190
|
$0.220
|
$0.200
|
|
|
VEGETATIVE WATERING
|
TGL
|
776.310
|
$30.000
|
$26.000
|
$26.400
|
$30.000
|
$47.000
|
$50.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
17,176.000
|
$65.000
|
$112.000
|
$116.650
|
$120.340
|
$121.280
|
$139.250
|
|
|
CEMENT
|
TON
|
1,222.000
|
$180.000
|
$175.000
|
$209.000
|
$201.380
|
$221.080
|
$255.000
|
|
|
CEMENT TRT (EXIST MATL)(8")
|
SY
|
60,351.000
|
$2.000
|
$4.300
|
$1.870
|
$2.890
|
$3.870
|
$2.100
|
|
|
ASPH (RC-250)
|
GAL
|
8,396.000
|
$5.000
|
$4.800
|
$4.840
|
$10.260
|
$6.040
|
$6.500
|
|
|
AGGR (TY-E, GR-5)(SAC-B)
|
CY
|
300.000
|
$160.000
|
$170.000
|
$116.880
|
$216.330
|
$183.440
|
$245.000
|
|
|
AGGR (TY-PE, GR-3)(SAC-B)
|
CY
|
566.000
|
$140.000
|
$156.000
|
$155.270
|
$188.340
|
$182.040
|
$205.000
|
|
|
AGGR (TY-PE, GR-4)(SAC-B)
|
CY
|
861.000
|
$140.000
|
$138.000
|
$155.340
|
$186.140
|
$217.080
|
$200.000
|
|
|
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
|
GAL
|
57,294.000
|
$4.000
|
$4.500
|
$4.400
|
$5.180
|
$5.220
|
$5.500
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
4,292.000
|
$99.000
|
$198.000
|
$129.800
|
$168.100
|
$168.670
|
$175.000
|
|
|
TACK COAT
|
GAL
|
6,895.000
|
$5.500
|
$4.850
|
$3.630
|
$4.470
|
$5.440
|
$4.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
1,000.000
|
$69.000
|
$53.000
|
$68.730
|
$91.920
|
$57.670
|
$67.000
|
|
|
PLANE ASPH CONC PAV(1")
|
SY
|
5,842.000
|
$1.000
|
$1.850
|
$1.650
|
$2.430
|
$3.470
|
$1.500
|
|
|
CUT & RESTORING PAV
|
SY
|
181.000
|
$185.000
|
$119.000
|
$210.000
|
$227.200
|
$243.250
|
$225.000
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
39.000
|
$100.000
|
$33.000
|
$84.000
|
$111.570
|
$234.690
|
$91.000
|
|
|
CEM STABIL BKFL
|
CY
|
305.000
|
$160.000
|
$64.000
|
$194.250
|
$185.000
|
$156.850
|
$325.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
220.000
|
$60.000
|
$1.000
|
$10.500
|
$10.000
|
$4.500
|
$21.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,882.000
|
$18.000
|
$5.000
|
$26.250
|
$25.000
|
$14.840
|
$28.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
18.000
|
$350.000
|
$800.000
|
$840.000
|
$800.000
|
$554.400
|
$425.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
26.000
|
$275.000
|
$161.000
|
$168.080
|
$150.000
|
$282.440
|
$285.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
680.000
|
$200.000
|
$245.000
|
$262.140
|
$235.300
|
$176.560
|
$257.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
24.000
|
$162.000
|
$78.000
|
$105.000
|
$100.000
|
$85.470
|
$28.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
54.000
|
$650.000
|
$720.000
|
$735.000
|
$700.000
|
$661.400
|
$700.000
|
|
|
CONC BOX CULV (8 FT X 3 FT)
|
LF
|
60.000
|
$700.000
|
$835.000
|
$840.000
|
$800.000
|
$873.840
|
$850.000
|
|
|
CONC BOX CULV (9 FT X 4 FT)
|
LF
|
106.000
|
$800.000
|
$1,000.000
|
$945.000
|
$900.000
|
$1,300.520
|
$1,200.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
128.000
|
$90.000
|
$53.000
|
$56.700
|
$54.000
|
$94.290
|
$92.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
40.000
|
$80.000
|
$62.000
|
$60.900
|
$58.000
|
$107.430
|
$255.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
292.000
|
$115.000
|
$139.000
|
$131.250
|
$125.000
|
$125.800
|
$160.000
|
|
|
RC PIPE (CL III)(27 IN)
|
LF
|
16.000
|
$120.000
|
$161.000
|
$157.500
|
$150.000
|
$150.220
|
$310.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
140.000
|
$160.000
|
$193.000
|
$210.000
|
$200.000
|
$164.550
|
$145.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
76.000
|
$200.000
|
$284.000
|
$278.250
|
$265.000
|
$174.420
|
$168.000
|
|
|
SET (TY I) (36 IN) (3: 1) (C)
|
EA
|
2.000
|
$8,000.000
|
$7,000.000
|
$8,925.020
|
$8,500.000
|
$14,950.030
|
$6,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
2.000
|
$10,000.000
|
$9,000.000
|
$12,600.030
|
$12,000.000
|
$12,795.590
|
$6,500.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
2.000
|
$12,000.000
|
$13,000.000
|
$18,900.050
|
$18,000.000
|
$14,598.950
|
$11,000.000
|
|
|
SET (TY I)(S= 9 FT)(HW= 5 FT)(3:1)(C)
|
EA
|
4.000
|
$14,000.000
|
$18,000.000
|
$23,100.060
|
$22,000.000
|
$20,493.960
|
$13,100.000
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$1,200.000
|
$850.000
|
$840.000
|
$800.000
|
$1,490.320
|
$1,100.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,300.000
|
$1,000.000
|
$997.500
|
$950.000
|
$1,939.320
|
$1,525.000
|
|
|
SET (TY II) (18 IN) (TP) (6: 1) (P)
|
EA
|
4.000
|
$1,000.000
|
$1,000.000
|
$997.500
|
$950.000
|
$1,468.250
|
$850.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
6.000
|
$2,500.000
|
$2,100.000
|
$2,625.010
|
$2,500.000
|
$1,911.210
|
$850.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
6.000
|
$1,600.000
|
$2,100.000
|
$2,100.010
|
$2,000.000
|
$1,995.540
|
$850.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,800.000
|
$1,900.000
|
$2,362.510
|
$2,250.000
|
$2,209.430
|
$1,250.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
34.000
|
$1,700.000
|
$2,100.000
|
$2,625.010
|
$2,500.000
|
$2,368.880
|
$1,425.000
|
|
|
SET (TY II) (24 IN) (TP) (6: 1) (P)
|
EA
|
2.000
|
$2,200.000
|
$2,100.000
|
$2,625.010
|
$2,500.000
|
$1,977.390
|
$1,050.000
|
|
|
SET (TY II) (27 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,600.000
|
$3,200.000
|
$3,150.010
|
$3,000.000
|
$1,933.810
|
$2,900.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$3,200.000
|
$3,150.010
|
$3,000.000
|
$3,289.270
|
$2,150.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$2,500.000
|
$3,700.000
|
$3,360.010
|
$3,200.000
|
$3,379.430
|
$3,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$3,000.000
|
$3,500.000
|
$3,675.010
|
$3,500.000
|
$4,335.980
|
$3,850.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
6.000
|
$3,000.000
|
$4,500.000
|
$4,725.010
|
$4,500.000
|
$4,785.980
|
$4,400.000
|
|
|
SET (TY II) (15 IN) (TP) (6:1) (P)
|
EA
|
4.000
|
$1,400.000
|
$950.000
|
$945.000
|
$900.000
|
$1,473.870
|
$800.000
|
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
16.000
|
$20.000
|
$44.000
|
$57.750
|
$55.000
|
$75.150
|
$68.000
|
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
8.000
|
$50.000
|
$90.000
|
$105.000
|
$100.000
|
$90.240
|
$100.000
|
|
|
THERMOPLASTIC PIPE (PP) (15")
|
LF
|
16.000
|
$40.000
|
$60.000
|
$52.500
|
$50.000
|
$73.720
|
$52.000
|
|
|
REMOV STR (SMALL)
|
EA
|
11.000
|
$1,000.000
|
$550.000
|
$577.500
|
$550.000
|
$602.810
|
$775.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$400,000.000
|
$25,000.000
|
$497,052.950
|
$294,500.000
|
$473,416.720
|
$680,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$3,225.000
|
$10,000.000
|
$4,615.790
|
$5,009.750
|
$3,632.540
|
$2,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$5,000.000
|
$9,000.000
|
$5,173.640
|
$7,500.000
|
$6,797.020
|
$28,856.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$250.000
|
$300.000
|
$310.420
|
$265.000
|
$167.640
|
$325.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$300.000
|
$1,500.000
|
$517.360
|
$500.000
|
$54.670
|
$550.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
170.000
|
$50.000
|
$32.000
|
$42.000
|
$42.000
|
$40.720
|
$42.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
170.000
|
$20.000
|
$7.000
|
$20.000
|
$20.000
|
$19.020
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,380.000
|
$4.500
|
$3.500
|
$5.000
|
$5.000
|
$5.400
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,380.000
|
$1.500
|
$1.500
|
$1.000
|
$1.000
|
$1.140
|
$1.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
27.000
|
$60.000
|
$100.000
|
$39.600
|
$72.780
|
$200.090
|
$423.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,766.000
|
$22.000
|
$16.000
|
$30.800
|
$47.910
|
$13.970
|
$34.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
79.000
|
$40.000
|
$16.000
|
$30.800
|
$102.810
|
$76.670
|
$124.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
900.000
|
$36.000
|
$28.000
|
$31.460
|
$29.650
|
$32.390
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,850.000
|
$2,250.000
|
$2,758.620
|
$2,100.000
|
$3,596.100
|
$2,124.000
|
|
|
SHORT RADIUS (28")
|
LF
|
12.500
|
$40.000
|
$40.000
|
$44.990
|
$42.400
|
$83.000
|
$44.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$1,100.000
|
$1,350.000
|
$1,352.790
|
$1,275.000
|
$2,634.020
|
$1,508.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,000.000
|
$3,700.000
|
$3,787.800
|
$3,570.000
|
$3,654.230
|
$3,992.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$30,000.000
|
$20,000.000
|
$32,923.070
|
$31,030.000
|
$30,913.210
|
$37,160.000
|
|
|
REMOVE AND INSTALL EXISTING GATE
|
EA
|
2.000
|
$2,000.000
|
$2,000.000
|
$1,092.840
|
$1,030.000
|
$1,003.020
|
$3,500.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
140.000
|
$25.000
|
$10.000
|
$30.820
|
$29.050
|
$25.020
|
$25.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
8.000
|
$250.000
|
$350.000
|
$190.980
|
$150.000
|
$465.430
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$1,000.000
|
$1,200.000
|
$949.600
|
$775.000
|
$936.600
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,000.000
|
$1,200.000
|
$1,241.380
|
$1,100.000
|
$1,213.790
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
30.000
|
$500.000
|
$635.000
|
$578.250
|
$525.000
|
$338.240
|
$438.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
32.000
|
$100.000
|
$100.000
|
$116.710
|
$100.000
|
$131.110
|
$90.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
|
EA
|
16.000
|
$25.000
|
$160.000
|
$37.140
|
$20.000
|
$20.500
|
$23.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
26.000
|
$30.000
|
$20.000
|
$43.500
|
$30.000
|
$25.150
|
$33.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
24.000
|
$30.000
|
$20.000
|
$19.630
|
$15.000
|
$7.340
|
$17.000
|
|
|
INSTL OM ASSM (OM-2Z)(YFLX)GNDHH(BI)
|
EA
|
24.000
|
$120.000
|
$75.000
|
$76.390
|
$70.000
|
$93.050
|
$79.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
172,540.000
|
$0.250
|
$0.270
|
$0.250
|
$0.250
|
$0.310
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
20,092.000
|
$0.250
|
$0.400
|
$0.250
|
$0.250
|
$0.310
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
25,200.000
|
$0.250
|
$0.400
|
$0.250
|
$0.250
|
$0.310
|
$0.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
7,291.000
|
$2.000
|
$1.600
|
$1.720
|
$2.000
|
$0.290
|
$1.500
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
58,860.000
|
$0.600
|
$1.050
|
$0.900
|
$1.100
|
$0.830
|
$0.900
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
8,180.000
|
$0.600
|
$1.050
|
$0.900
|
$1.100
|
$0.830
|
$0.900
|
|
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
|
LF
|
6,473.000
|
$0.600
|
$1.050
|
$0.900
|
$1.100
|
$0.840
|
$1.000
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
779.000
|
$17.000
|
$23.000
|
$12.000
|
$15.000
|
$17.450
|
$12.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
426.000
|
$6.000
|
$8.000
|
$5.250
|
$5.000
|
$6.980
|
$5.250
|
|
Totals: |
$4,482,046.450
|
$5,637,914.820
|
$6,049,442.129
|
$6,152,057.076
|
$6,339,201.028
|
$7,094,599.000
|