MAVERICK US 57 (0276-01-044)

Items: 88

County: MAVERICK
Length: 0.0000 MILES (1.5184 MILES)
Highway: US 57
District: LAREDO
Control Number: 0276-01-044
DBE Goal: 0.0%
Project: F 2026(846)
Guaranty: $100,000.00
Time: 235 WORKING DAYS
Engineer's Estimate: $11,559,333.07
Date: 08/06/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263207
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00189724
Contract Type: FEDERAL
Project Description: REHABILITATION OF EXISTING MULTI-LANE ROADWAY CONSISTING OF GEOGRID, FLEXBASE, HMA SP TYB AND TYC, SMA TY C, MBGF, & PAVEMENT MARKING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$11,559,333.07
$8,822,696.98
Over/Under Est: -23.67% -$2,736,636.09
Over/Under Est: -22.21% -$2,567,436.97
Amt Left: 1.92% $169,199.12
$12,605,854.95
Over/Under Est: 9.05% $1,046,521.88
Amt Left: 42.88% $3,783,157.97
Delta: -40.19% -$3,613,958.85

Bid Items & Bid Tabulations

88 Total 0 of 88
MAVERICK  |  US 57  |  LAREDO  |  0276-01-044  |  08/06/2026 1:00 PM CDT  |  $11,559,333.07  |  F 2026(846)  |  REHAB EXIST ROADWAY  |  235 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
HUNTER INDUSTRIES, LTD.
CK NEWBERRY, LLC
PREPARING ROW
STA 82.000 $746.000 $500.000 $514.500 $500.000
REMOV CONC (DRIVEWAYS)
SY 923.000 $35.000 $15.000 $19.560 $15.000
RMV (14"-18") TRT/UNTRT BASE & ASPH PAV
SY 65,243.000 $14.000 $9.000 $8.130 $10.000
EXCAV (ROADWAY)
CY 19,546.000 $12.500 $15.000 $15.240 $21.000
EMBANK (FNL)(OC)(TY A)
CY 1,356.000 $21.000 $10.000 $13.040 $25.000
DRILL SEED (PERM_RURAL_CLAY)
AC 9.400 $555.000 $1,700.000 $1,700.000 $2,000.000
DRILL SEED (TEMP_WARM)
AC 9.400 $640.000 $1,100.000 $1,100.000 $1,100.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 30,171.000 $75.000 $65.000 $63.080 $86.000
GEOGRID BASE REINFORCEMENT (TYPE 2)
SY 65,243.000 $2.000 $1.800 $1.170 $2.250
PRIME COAT (MC-30)
GAL 13,049.000 $4.100 $5.000 $4.690 $5.500
SP MIXES SP-B SAC-B PG70-22
TON 15,659.000 $125.000 $91.000 $88.170 $125.000
SP MIXES SP-C SAC-B PG70-22
TON 11,255.000 $125.000 $94.000 $93.550 $130.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 10,346.000 $145.000 $124.000 $134.940 $140.000
FLEXIBLEPAVEMENTSTRUCTUREREPAIR(10.5")
SY 2,209.000 $76.800 $83.000 $67.240 $125.000
PLANE ASPH CONC PAV (2.5")
SY 3,888.000 $6.100 $4.000 $3.180 $5.000
FLOWABLE BACKFILL
CY 154.000 $252.810 $170.000 $210.000 $350.000
RIPRAP (MOW STRIP)(4 IN)
CY 60.000 $800.000 $600.000 $640.000 $550.000
CONC BOX CULV (5 FT X 2 FT)
LF 6.000 $1,000.000 $4,100.000 $1,720.000 $575.000
RC PIPE (CL III)(36 IN)
LF 270.000 $139.110 $228.000 $168.000 $250.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1)(C)
EA 4.000 $12,036.000 $7,700.000 $10,300.000 $7,000.000
CLEAN EXIST CULVERTS
EA 6.000 $2,600.000 $4,000.000 $1,250.000 $2,000.000
REMOV STR (SET)
EA 4.000 $2,800.000 $1,800.000 $1,850.000 $500.000
REMOV STR (HEADWALL)
EA 2.000 $2,000.000 $1,400.000 $875.000 $1,000.000
REMOV STR (PIPE)
LF 180.000 $25.000 $14.000 $6.500 $10.000
MOBILIZATION
LS 1.000 $1,073,233.860 $400,000.000 $702,391.800 $1,250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $5,917.000 $3,200.000 $5,131.850 $10,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $5,000.000 $11,000.000 $3,613.850 $10,000.000
TMA (STATIONARY)
DAY 62.000 $225.000 $200.000 $103.250 $300.000
TMA (MOBILE OPERATION)
DAY 15.000 $737.500 $200.000 $232.320 $25.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 129.000 $109.000 $85.000 $85.000 $85.000
ROCK FILTER DAMS (REMOVE)
LF 129.000 $21.000 $18.000 $18.000 $18.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 223.000 $33.750 $44.000 $44.000 $44.000
CONSTRUCTION EXITS (REMOVE)
SY 223.000 $13.300 $10.000 $10.000 $10.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 35.000 $122.500 $140.000 $66.000 $85.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,374.000 $5.400 $5.000 $5.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,374.000 $1.700 $1.500 $1.500 $1.500
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 6,810.000 $50.000 $21.000 $20.000 $75.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 6,270.000 $10.000 $4.000 $7.500 $4.500
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 6,810.000 $14.000 $14.000 $11.500 $35.000
DRIVEWAYS (CONC)
SY 923.000 $117.100 $125.000 $117.000 $125.000
DRIVEWAYS (ACP)
SY 1,347.000 $45.000 $54.000 $41.000 $65.000
DRIVEWAYS (SURF TREAT)
SY 363.000 $27.500 $54.000 $34.560 $70.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,025.000 $27.400 $28.000 $25.930 $35.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,448.000 $1,800.000 $1,735.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 1,025.000 $2.750 $2.000 $1.900 $2.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 6.000 $253.200 $300.000 $275.000 $400.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,353.500 $3,700.000 $3,555.000 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $281.000 $250.000 $250.000 $400.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 17.000 $1,200.000 $900.000 $1,200.000 $425.000
CRASH CUSH ATTEN (REMOVE)
EA 23.000 $700.000 $800.000 $750.000 $325.000
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 23.000 $7,000.000 $5,400.000 $8,400.000 $11,000.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 6.000 $300.000 $300.000 $275.000 $300.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 5.000 $352.500 $300.000 $300.000 $300.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $798.000 $1,000.000 $950.000 $1,000.000
RELOCATE EXISTING MAILBOX
EA 17.000 $334.000 $50.000 $579.670 $200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 28.000 $715.500 $900.000 $850.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 9.000 $1,039.600 $1,100.000 $1,050.000 $1,050.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,056.900 $1,500.000 $1,450.000 $1,450.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 30.000 $23.590 $80.000 $75.000 $80.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 28.000 $121.000 $125.000 $125.000 $125.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 70.000 $29.650 $6.000 $5.000 $5.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 8,158.000 $4.500 $0.900 $0.850 $4.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 8,164.000 $6.000 $0.900 $0.850 $4.000
WK ZN PAV MRK REMOV (W)(DBL ARROW)
EA 1.000 $480.250 $350.000 $325.000 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,964.000 $0.670 $2.000 $1.600 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,140.000 $2.000 $1.200 $1.100 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 30.000 $20.000 $17.000 $16.000 $11.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 18.000 $190.000 $160.000 $150.000 $175.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 8.000 $258.750 $270.000 $250.000 $180.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 7.000 $48.900 $27.000 $25.000 $45.000
PAVEMENT SLER 6"
LF 45,058.000 $0.330 $0.400 $0.380 $0.250
PAVEMENT SLER 8"
LF 1,140.000 $0.800 $0.600 $0.520 $0.500
PAVEMENT SLER 24"
LF 30.000 $3.820 $11.000 $10.000 $2.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 5,808.000 $0.900 $1.170 $1.100 $0.600
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 16,358.000 $0.750 $0.890 $0.840 $0.550
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 4,250.000 $0.750 $1.170 $1.100 $0.600
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 18,000.000 $0.500 $0.890 $0.840 $0.550
REFL PAV MRKR TY II-A-A
EA 1,700.000 $4.160 $8.000 $7.500 $4.000
TRAFFIC BUTTON TY W
EA 1,630.000 $4.000 $5.000 $4.500 $4.000
TRAFFIC BUTTON TY Y
EA 1,630.000 $1.970 $5.000 $4.500 $4.000
ELIM EXT PM & MRKS (4")
LF 35,100.000 $0.500 $0.270 $0.250 $0.750
ELIM EXT PM & MRKS (8")
LF 830.000 $0.950 $0.370 $0.350 $0.750
ELIM EXT PM & MRKS (24")
LF 65.000 $35.000 $16.000 $15.000 $3.000
ELIM EXT PM & MRKS (ARROW)
EA 6.000 $40.000 $80.000 $75.000 $55.000
ELIM EXT PM & MRKS (WORD)
EA 4.000 $40.000 $80.000 $75.000 $60.000
TEMP TRAF SIGNALS
EA 1.000 $22,000.000 $40,000.000 $13,600.200 $100,000.000
BONDING COURSE
GAL 24,644.000 $4.400 $2.000 $3.400 $4.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $10,000.000 $6,500.000 $5,162.650 $5,000.000
Totals: $11,559,333.070 $8,822,696.980 $8,991,896.100 $12,605,854.950
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $486,874.38
Total: $537,874.38