PREPARING ROW
|
STA
|
106.480
|
$750.000
|
$365.000
|
$889.120
|
$501.290
|
$500.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,837.000
|
$12.000
|
$10.960
|
$13.680
|
$41.740
|
$15.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
106.480
|
$930.000
|
$650.350
|
$1,278.720
|
$662.130
|
$400.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
1,537.000
|
$16.000
|
$11.620
|
$13.680
|
$71.240
|
$22.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
10.100
|
$760.000
|
$1,000.000
|
$1,454.000
|
$1,432.610
|
$1,000.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
10.100
|
$525.000
|
$1,000.000
|
$965.000
|
$1,432.610
|
$500.000
|
|
|
PROOF ROLLING
|
HR
|
5.000
|
$120.000
|
$65.000
|
$105.300
|
$91.410
|
$75.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
3,102.000
|
$75.000
|
$74.030
|
$75.600
|
$98.800
|
$80.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
3,407.000
|
$5.000
|
$9.400
|
$5.260
|
$13.640
|
$7.000
|
|
|
ASPH (AC-15P)
|
GAL
|
27,259.000
|
$3.700
|
$4.960
|
$4.930
|
$7.500
|
$5.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
404.000
|
$125.000
|
$94.900
|
$100.580
|
$163.730
|
$135.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
334.000
|
$120.000
|
$94.900
|
$101.180
|
$163.730
|
$150.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
6.000
|
$171.000
|
$500.000
|
$551.260
|
$700.370
|
$300.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
32.000
|
$525.000
|
$531.210
|
$937.140
|
$859.560
|
$650.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
240.000
|
$40.000
|
$46.330
|
$69.330
|
$62.690
|
$45.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
410.000
|
$80.000
|
$85.330
|
$110.500
|
$122.790
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
100.000
|
$95.000
|
$150.000
|
$165.380
|
$123.750
|
$130.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
4.000
|
$8,250.000
|
$9,000.000
|
$9,922.630
|
$19,582.200
|
$17,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
8.000
|
$10,000.000
|
$10,500.000
|
$11,576.410
|
$10,135.610
|
$12,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,250.000
|
$1,200.000
|
$1,323.020
|
$1,702.720
|
$4,200.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$2,100.000
|
$2,000.000
|
$2,205.030
|
$2,953.660
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$560.000
|
$1,250.000
|
$1,378.140
|
$1,258.790
|
$1,500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,900.000
|
$2,500.000
|
$2,756.290
|
$3,228.730
|
$4,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
90.000
|
$15.000
|
$50.000
|
$55.130
|
$30.630
|
$35.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$117,211.220
|
$151,688.000
|
$174,691.220
|
$148,642.860
|
$493,954.420
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$8,000.000
|
$5,751.000
|
$3,502.640
|
$2,728.780
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
388.000
|
$62.000
|
$58.000
|
$101.500
|
$81.860
|
$60.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
388.000
|
$16.000
|
$15.000
|
$28.200
|
$21.830
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$20.000
|
$85.000
|
$25.050
|
$54.580
|
$10.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$8.000
|
$55.000
|
$10.000
|
$13.640
|
$5.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
58.000
|
$86.000
|
$65.000
|
$117.000
|
$106.890
|
$100.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,282.000
|
$3.000
|
$4.300
|
$4.250
|
$5.940
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,282.000
|
$1.000
|
$1.000
|
$1.000
|
$1.710
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
1,120.000
|
$80.000
|
$50.000
|
$117.000
|
$105.060
|
$150.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
570.000
|
$60.000
|
$49.810
|
$48.000
|
$51.630
|
$70.000
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
570.000
|
$10.000
|
$9.640
|
$36.000
|
$9.890
|
$15.000
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
570.000
|
$14.000
|
$22.790
|
$32.000
|
$5.110
|
$45.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
902.000
|
$50.000
|
$27.740
|
$36.000
|
$81.860
|
$25.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
650.000
|
$30.000
|
$28.790
|
$39.250
|
$40.930
|
$34.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
850.000
|
$5.330
|
$2.630
|
$3.500
|
$3.410
|
$3.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$300.000
|
$452.430
|
$250.000
|
$286.520
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,000.000
|
$3,714.610
|
$3,875.000
|
$4,311.470
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$566.000
|
$268.000
|
$250.000
|
$286.520
|
$500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,200.000
|
$1,750.000
|
$1,575.000
|
$552.440
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$800.000
|
$2,750.000
|
$1,575.000
|
$492.290
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$9,000.000
|
$8,585.000
|
$9,825.000
|
$7,124.300
|
$10,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$650.000
|
$765.000
|
$765.000
|
$1,091.510
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$800.000
|
$850.000
|
$850.000
|
$1,227.950
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,100.000
|
$1,250.000
|
$1,250.000
|
$1,773.700
|
$1,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
14.000
|
$89.000
|
$140.000
|
$140.000
|
$218.300
|
$250.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
30.000
|
$28.000
|
$30.000
|
$30.000
|
$54.580
|
$115.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
8.000
|
$24.000
|
$10.000
|
$10.000
|
$16.370
|
$60.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
8.000
|
$120.000
|
$65.000
|
$65.000
|
$90.050
|
$175.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,093.000
|
$1.000
|
$1.750
|
$1.590
|
$16.370
|
$1.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
40,625.000
|
$0.150
|
$0.220
|
$0.300
|
$0.450
|
$0.500
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
21,120.000
|
$0.480
|
$0.800
|
$0.770
|
$1.090
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
644.000
|
$0.490
|
$0.950
|
$1.500
|
$2.730
|
$1.250
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
17,937.000
|
$0.520
|
$0.800
|
$0.770
|
$1.360
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
259.000
|
$5.000
|
$4.800
|
$10.000
|
$15.010
|
$7.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$23,000.000
|
$10,000.000
|
$27,287.750
|
$7,500.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
924.000
|
$10.000
|
$8.800
|
$13.000
|
$18.010
|
$8.000
|
|
|
TMA (STATIONARY)
|
DAY
|
142.000
|
$200.000
|
$200.000
|
$350.000
|
$177.370
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
136.000
|
$85.000
|
$100.000
|
$150.000
|
$94.540
|
$25.000
|
|
Totals: |
$1,478,338.070
|
$1,482,698.938
|
$1,795,233.633
|
$2,123,469.544
|
$2,134,908.920
|