PREPARING ROW
|
STA
|
2.000
|
$4,000.000
|
$10,000.000
|
$4,950.000
|
$12,000.000
|
$22,320.000
|
$50,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9,534.000
|
$15.000
|
$15.850
|
$15.000
|
$20.000
|
$21.240
|
$20.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
934.000
|
$25.000
|
$39.000
|
$25.000
|
$32.000
|
$32.480
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
5,573.000
|
$10.000
|
$6.500
|
$15.000
|
$10.000
|
$18.920
|
$30.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
AC
|
3.800
|
$900.000
|
$830.000
|
$500.000
|
$975.000
|
$828.000
|
$3,000.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
AC
|
2.700
|
$600.000
|
$445.000
|
$500.000
|
$925.000
|
$445.000
|
$3,000.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
AC
|
2.700
|
$600.000
|
$445.000
|
$500.000
|
$975.000
|
$445.000
|
$3,000.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,000.000
|
$11.000
|
$5.250
|
$15.000
|
$10.000
|
$23.600
|
$55.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
2,165.000
|
$2.250
|
$1.050
|
$1.000
|
$1.400
|
$1.050
|
$6.500
|
|
|
PROOF ROLLING
|
HR
|
28.000
|
$100.000
|
$128.000
|
$65.000
|
$60.000
|
$58.000
|
$150.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
17,643.000
|
$38.000
|
$37.600
|
$48.000
|
$51.000
|
$55.580
|
$55.000
|
|
|
RWRK BS MTL(TY B)(8")(DEN CNT)(ORG POS)
|
CY
|
2,934.000
|
$17.000
|
$16.000
|
$20.000
|
$20.000
|
$5.800
|
$10.000
|
|
|
PRIME COAT (RC-250)
|
GAL
|
12,441.000
|
$5.000
|
$4.300
|
$3.500
|
$5.500
|
$4.160
|
$8.000
|
|
|
ASPH (CRS-1P)
|
GAL
|
12,441.000
|
$4.000
|
$3.500
|
$3.500
|
$5.500
|
$3.930
|
$8.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
12,441.000
|
$4.100
|
$3.700
|
$3.500
|
$5.500
|
$3.930
|
$8.000
|
|
|
AGGR(TY-B GR-3 SAC-B)
|
CY
|
665.000
|
$130.000
|
$60.000
|
$100.000
|
$102.000
|
$75.840
|
$200.000
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
453.000
|
$140.000
|
$84.500
|
$95.000
|
$136.000
|
$71.800
|
$200.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
462.000
|
$135.000
|
$120.000
|
$135.000
|
$119.760
|
$95.160
|
$200.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
18,817.000
|
$5.000
|
$3.500
|
$2.750
|
$4.500
|
$3.730
|
$8.000
|
|
|
CL C CONC (CULV)
|
CY
|
168.200
|
$1,350.000
|
$1,300.000
|
$1,100.000
|
$1,500.000
|
$1,550.000
|
$1,500.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
0.800
|
$650.000
|
$1,600.000
|
$1,500.000
|
$700.000
|
$1,000.000
|
$650.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
62.500
|
$650.000
|
$550.000
|
$450.000
|
$700.000
|
$650.000
|
$650.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
116.000
|
$175.000
|
$90.000
|
$60.000
|
$95.000
|
$80.000
|
$85.000
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (P)
|
EA
|
8.000
|
$2,600.000
|
$1,400.000
|
$1,550.000
|
$1,200.000
|
$1,000.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
EA
|
4.000
|
$1,250.000
|
$800.000
|
$500.000
|
$900.000
|
$750.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$225,000.000
|
$200,000.000
|
$185,000.000
|
$275,000.000
|
$355,924.710
|
$390,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$4,500.000
|
$8,000.000
|
$2,250.000
|
$4,000.000
|
$4,092.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
100.000
|
$30.000
|
$29.300
|
$40.000
|
$40.000
|
$45.000
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$15.000
|
$8.200
|
$25.000
|
$30.000
|
$12.000
|
$15.000
|
|
|
SANDBAGS FOR EROSION CONTROL (12")
|
LF
|
30.000
|
$50.000
|
$10.000
|
$30.000
|
$50.000
|
$18.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,880.000
|
$5.000
|
$4.900
|
$5.000
|
$5.500
|
$2.350
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,880.000
|
$1.000
|
$1.500
|
$1.000
|
$3.000
|
$0.500
|
$12.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
1,020.000
|
$30.000
|
$14.000
|
$15.000
|
$33.000
|
$27.500
|
$25.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
1,020.000
|
$30.000
|
$14.000
|
$15.000
|
$33.000
|
$27.500
|
$20.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,991.000
|
$45.000
|
$50.000
|
$50.000
|
$73.000
|
$71.840
|
$42.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
439.000
|
$45.000
|
$50.000
|
$65.000
|
$60.000
|
$20.920
|
$42.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,100.000
|
$25.000
|
$22.000
|
$20.000
|
$30.000
|
$26.000
|
$25.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
250.000
|
$25.000
|
$40.000
|
$25.000
|
$50.000
|
$44.000
|
$35.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
100.000
|
$25.000
|
$23.000
|
$35.000
|
$30.000
|
$26.500
|
$35.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,100.000
|
$2.750
|
$2.500
|
$3.000
|
$4.000
|
$3.000
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$2,850.000
|
$2,480.000
|
$2,400.000
|
$3,300.000
|
$2,900.000
|
$2,850.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,000.000
|
$750.000
|
$1,000.000
|
$1,500.000
|
$1,250.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$12,500.000
|
$7,500.000
|
$10,000.000
|
$9,000.000
|
$8,000.000
|
$13,500.000
|
|
|
PIPE UNDERDRAINS (TY 7) (6")
|
LF
|
1,000.000
|
$40.000
|
$25.000
|
$25.000
|
$33.000
|
$30.000
|
$30.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
20.000
|
$32.000
|
$25.250
|
$28.000
|
$30.000
|
$25.000
|
$15.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
80.000
|
$1.500
|
$2.000
|
$2.500
|
$3.000
|
$2.000
|
$3.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
160.000
|
$2.000
|
$1.500
|
$2.000
|
$2.000
|
$1.500
|
$3.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$1,000.000
|
$2,000.000
|
$2,200.000
|
$2,500.000
|
$2,000.000
|
$1,000.000
|
|
|
REMOVE GROUND BOX
|
EA
|
4.000
|
$200.000
|
$350.000
|
$400.000
|
$400.000
|
$350.000
|
$500.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$1,100.000
|
$500.000
|
$550.000
|
$750.000
|
$500.000
|
$2,500.000
|
|
|
ELC SRV TY D 120/240 070(NS)AL(E)SP(O)
|
EA
|
1.000
|
$6,500.000
|
$7,000.000
|
$7,500.000
|
$7,800.000
|
$6,900.000
|
$5,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$850.000
|
$540.000
|
$550.000
|
$950.000
|
$810.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$850.000
|
$655.000
|
$700.000
|
$1,100.000
|
$875.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$850.000
|
$790.000
|
$800.000
|
$1,200.000
|
$975.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
3.000
|
$500.000
|
$280.000
|
$300.000
|
$850.000
|
$700.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
7.000
|
$500.000
|
$365.000
|
$400.000
|
$950.000
|
$800.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
13.000
|
$300.000
|
$96.000
|
$100.000
|
$125.000
|
$100.000
|
$450.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
22.000
|
$30.000
|
$22.300
|
$50.000
|
$30.000
|
$20.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
38.000
|
$40.000
|
$28.350
|
$50.000
|
$50.000
|
$40.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
18,056.000
|
$0.500
|
$0.180
|
$0.250
|
$0.180
|
$0.180
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
18,138.000
|
$0.500
|
$0.320
|
$0.350
|
$0.320
|
$0.320
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
27,633.000
|
$0.700
|
$0.480
|
$0.500
|
$0.480
|
$0.480
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
31,870.000
|
$0.600
|
$0.480
|
$0.500
|
$0.480
|
$0.480
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,142.000
|
$1.500
|
$1.500
|
$1.000
|
$2.000
|
$1.350
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
885.000
|
$1.500
|
$1.000
|
$2.000
|
$1.000
|
$1.000
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
44.000
|
$8.500
|
$14.000
|
$15.000
|
$14.000
|
$14.000
|
$20.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
6.000
|
$32.000
|
$30.000
|
$33.000
|
$30.000
|
$30.000
|
$550.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
450.000
|
$0.600
|
$0.750
|
$1.000
|
$0.750
|
$0.750
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
22,774.000
|
$0.600
|
$0.340
|
$0.500
|
$0.340
|
$0.340
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
838.000
|
$0.800
|
$0.600
|
$0.750
|
$0.600
|
$0.600
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
23,050.000
|
$0.600
|
$0.350
|
$0.500
|
$0.350
|
$0.350
|
$1.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
24.000
|
$4.000
|
$4.300
|
$5.000
|
$4.300
|
$4.300
|
$15.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
639.000
|
$3.500
|
$4.300
|
$5.000
|
$4.300
|
$4.300
|
$15.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,313.000
|
$1.000
|
$1.400
|
$1.000
|
$2.000
|
$0.760
|
$1.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
754.000
|
$1.500
|
$3.000
|
$3.500
|
$3.500
|
$3.000
|
$3.500
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$475.000
|
$2,100.000
|
$550.000
|
$750.000
|
$500.000
|
$3,500.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
1.000
|
$10,500.000
|
$16,000.000
|
$16,500.000
|
$17,500.000
|
$15,000.000
|
$9,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
428.000
|
$200.000
|
$150.000
|
$195.000
|
$300.000
|
$400.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
200.000
|
$35.000
|
$150.000
|
$50.000
|
$125.000
|
$50.000
|
$200.000
|
|
Totals: |
$2,691,320.250
|
$2,449,573.590
|
$2,587,017.550
|
$3,201,392.660
|
$3,235,536.730
|
$3,974,338.500
|