|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
196.700
|
$553.000
|
$350.000
|
$500.000
|
$530.000
|
$310.000
|
$757.630
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
19,494.300
|
$11.000
|
$15.000
|
$15.500
|
$18.000
|
$14.000
|
$14.670
|
|
|
|
BACKFILL (TY B)
|
STA
|
196.700
|
$191.000
|
$200.000
|
$50.000
|
$113.000
|
$230.000
|
$209.050
|
|
|
|
BLADING
|
STA
|
10.000
|
$107.000
|
$500.000
|
$275.000
|
$232.000
|
$125.000
|
$119.400
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
STA
|
196.700
|
$120.000
|
$350.000
|
$75.000
|
$215.000
|
$138.000
|
$114.600
|
|
|
|
ROLL SODDING
|
SY
|
17,084.000
|
$4.670
|
$4.000
|
$4.000
|
$3.750
|
$4.350
|
$4.040
|
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
AC
|
26.330
|
$491.500
|
$600.000
|
$575.000
|
$500.000
|
$630.000
|
$556.280
|
|
|
|
VEGETATIVE WATERING
|
MG
|
1,040.000
|
$18.000
|
$15.000
|
$25.000
|
$30.000
|
$20.000
|
$34.390
|
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
5,383.000
|
$36.580
|
$50.000
|
$45.600
|
$49.000
|
$52.000
|
$52.360
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
5,007.000
|
$4.400
|
$4.500
|
$4.850
|
$3.900
|
$4.500
|
$5.970
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
1,000.000
|
$43.000
|
$50.000
|
$75.000
|
$51.000
|
$71.500
|
$74.490
|
|
|
|
PLAN & TEXT ASPH CONC PAV(2" TO 4")
|
SY
|
52,765.000
|
$2.760
|
$1.500
|
$1.500
|
$1.750
|
$1.900
|
$4.380
|
|
|
|
CEM STABIL BKFL
|
CY
|
311.000
|
$91.000
|
$125.000
|
$155.000
|
$150.000
|
$110.000
|
$61.990
|
|
|
|
CUT & RESTORING PAV
|
SY
|
170.000
|
$88.000
|
$75.000
|
$105.000
|
$100.000
|
$110.500
|
$122.840
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
162.000
|
$1.720
|
$25.000
|
$8.250
|
$1.000
|
$5.000
|
$3.440
|
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
91.000
|
$135.000
|
$150.000
|
$183.000
|
$165.000
|
$110.000
|
$135.080
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
62.000
|
$368.000
|
$500.000
|
$415.000
|
$510.000
|
$560.000
|
$350.150
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
626.000
|
$55.000
|
$0.000
|
$0.001
|
$0.000
|
$59.000
|
$0.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
116.000
|
$55.000
|
$55.000
|
$58.000
|
$50.000
|
$59.000
|
$64.420
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
50.000
|
$80.250
|
$80.000
|
$69.000
|
$67.000
|
$74.000
|
$135.540
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
170.000
|
$80.250
|
$0.000
|
$0.001
|
$0.000
|
$74.000
|
$0.000
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
382.000
|
$99.000
|
$90.000
|
$87.000
|
$90.000
|
$96.500
|
$79.590
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
128.000
|
$141.000
|
$135.000
|
$118.000
|
$128.000
|
$135.500
|
$97.540
|
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
76.000
|
$171.000
|
$250.000
|
$179.000
|
$230.000
|
$245.000
|
$215.300
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
2.000
|
$5,069.000
|
$4,000.000
|
$7,200.000
|
$2,500.000
|
$2,750.000
|
$5,827.920
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
6.000
|
$6,825.000
|
$4,500.000
|
$7,500.000
|
$3,000.000
|
$3,300.000
|
$5,442.450
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
3.000
|
$7,036.000
|
$5,500.000
|
$7,700.000
|
$4,200.000
|
$4,620.000
|
$5,985.900
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$10,701.000
|
$8,500.000
|
$9,200.000
|
$7,000.000
|
$7,700.000
|
$7,686.670
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$998.000
|
$850.000
|
$975.000
|
$740.000
|
$750.000
|
$1,813.290
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
34.000
|
$900.000
|
$900.000
|
$1,100.000
|
$900.000
|
$860.000
|
$1,706.340
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,375.000
|
$1,500.000
|
$1,450.000
|
$1,200.000
|
$1,175.000
|
$2,124.850
|
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,807.000
|
$2,000.000
|
$1,500.000
|
$1,430.000
|
$1,250.000
|
$2,309.880
|
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$2,263.000
|
$3,000.000
|
$2,050.000
|
$2,300.000
|
$2,000.000
|
$3,230.650
|
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$8,000.000
|
$12,500.000
|
$12,500.000
|
$8,500.000
|
$9,350.000
|
$13,829.450
|
|
|
|
REMOV STR (PIPE)
|
LF
|
956.000
|
$12.500
|
$15.000
|
$10.400
|
$8.000
|
$13.000
|
$14.320
|
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
42.000
|
$300.000
|
$50.000
|
$182.000
|
$85.000
|
$25.000
|
$55.930
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$400,000.000
|
$300,000.000
|
$385,000.000
|
$313,200.000
|
$450,000.000
|
$513,307.330
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$7,150.000
|
$2,500.000
|
$9,750.000
|
$26,335.000
|
$17,650.000
|
$11,937.380
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,048.000
|
$30.000
|
$25.000
|
$25.000
|
$29.000
|
$35.000
|
$30.080
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,048.000
|
$9.280
|
$5.000
|
$10.000
|
$8.500
|
$12.700
|
$8.960
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,338.000
|
$3.250
|
$3.000
|
$6.500
|
$2.850
|
$5.320
|
$2.450
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,338.000
|
$0.950
|
$0.500
|
$0.540
|
$0.700
|
$0.600
|
$0.760
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,493.000
|
$35.000
|
$35.000
|
$54.000
|
$44.150
|
$50.000
|
$48.110
|
|
|
|
TURNOUTS (ACP)
|
SY
|
437.000
|
$54.000
|
$50.000
|
$35.000
|
$34.600
|
$76.000
|
$75.140
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
21,026.000
|
$0.460
|
$0.350
|
$0.420
|
$0.250
|
$0.220
|
$0.240
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
350.000
|
$26.340
|
$30.000
|
$26.000
|
$25.000
|
$29.700
|
$27.010
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,800.000
|
$2,100.000
|
$2,450.000
|
$1,900.000
|
$2,227.500
|
$2,114.610
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
200.000
|
$2.670
|
$4.000
|
$3.100
|
$3.000
|
$1.100
|
$2.910
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,600.000
|
$2,700.000
|
$2,600.000
|
$2,500.000
|
$3,135.000
|
$2,571.360
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$303.000
|
$300.000
|
$260.000
|
$250.000
|
$302.500
|
$310.100
|
|
|
|
WIRE FENCE (TY C)
|
LF
|
86.000
|
$7.500
|
$25.000
|
$15.000
|
$50.000
|
$41.000
|
$21.090
|
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
19.000
|
$185.000
|
$220.000
|
$205.000
|
$200.000
|
$253.000
|
$208.810
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
52.000
|
$340.000
|
$400.000
|
$390.000
|
$375.000
|
$368.500
|
$366.320
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
4.000
|
$419.000
|
$500.000
|
$465.000
|
$450.000
|
$632.500
|
$492.070
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
4.000
|
$24.000
|
$30.000
|
$26.000
|
$25.000
|
$49.500
|
$29.550
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
20.000
|
$55.000
|
$50.000
|
$41.000
|
$40.000
|
$66.000
|
$59.670
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
40,601.000
|
$0.250
|
$0.170
|
$0.210
|
$0.170
|
$0.180
|
$0.190
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(LNDP)
|
LF
|
311.000
|
$0.550
|
$2.000
|
$0.420
|
$0.500
|
$1.650
|
$1.790
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
130.000
|
$0.630
|
$2.000
|
$0.600
|
$0.500
|
$1.650
|
$1.790
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
4,089.000
|
$0.230
|
$0.250
|
$0.290
|
$0.170
|
$0.240
|
$0.260
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
27,336.000
|
$0.250
|
$0.170
|
$0.210
|
$0.170
|
$0.180
|
$0.190
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,287.000
|
$1.110
|
$1.000
|
$1.200
|
$0.950
|
$1.500
|
$1.960
|
|
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
311.000
|
$0.810
|
$1.000
|
$0.630
|
$1.000
|
$1.100
|
$1.190
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
130.000
|
$0.900
|
$1.000
|
$0.990
|
$1.000
|
$1.100
|
$1.190
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
37.000
|
$9.000
|
$10.000
|
$6.250
|
$12.000
|
$8.800
|
$9.550
|
|
|
|
PAVEMENT SEALER 4"
|
LF
|
638.000
|
$0.320
|
$0.500
|
$0.310
|
$1.000
|
$0.550
|
$0.600
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,089.000
|
$0.240
|
$0.450
|
$0.380
|
$0.330
|
$0.460
|
$0.500
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
27,336.000
|
$0.340
|
$0.350
|
$0.380
|
$0.330
|
$0.370
|
$0.410
|
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
40,601.000
|
$0.620
|
$0.600
|
$0.540
|
$0.650
|
$0.640
|
$0.690
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$258.000
|
$250.000
|
$230.000
|
$275.000
|
$231.000
|
$250.680
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$305.000
|
$250.000
|
$300.000
|
$375.000
|
$231.000
|
$250.680
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
513.000
|
$4.250
|
$3.500
|
$4.000
|
$4.370
|
$3.820
|
$4.140
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
638.000
|
$0.450
|
$3.000
|
$2.200
|
$1.000
|
$2.750
|
$2.980
|
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$2,354.000
|
$2,500.000
|
$2,250.000
|
$6,120.000
|
$3,500.000
|
$4,054.310
|
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
4,390.000
|
$61.110
|
$70.000
|
$90.000
|
$80.000
|
$112.200
|
$113.410
|
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
6,743.000
|
$58.940
|
$65.000
|
$77.000
|
$85.000
|
$113.300
|
$119.370
|
|
|
|
TACK COAT
|
GAL
|
16,348.000
|
$2.980
|
$2.000
|
$1.000
|
$2.200
|
$3.300
|
$3.340
|
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
7,842.000
|
$95.000
|
$75.000
|
$87.000
|
$96.000
|
$126.500
|
$136.090
|
|
|
|
UNDERSEAL COURSE
|
GAL
|
17,819.000
|
$3.200
|
$2.000
|
$2.600
|
$3.000
|
$3.300
|
$4.600
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$6,000.000
|
$6,000.000
|
$7,500.000
|
$2,165.000
|
$12,000.000
|
$5,968.690
|
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$122.000
|
$200.000
|
$50.000
|
$205.000
|
$175.000
|
$155.190
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
100.000
|
$42.000
|
$25.000
|
$50.000
|
$25.000
|
$22.000
|
$57.150
|
|
1
|
|
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
|
LF
|
170.000
|
$80.250
|
$60.000
|
$45.000
|
$40.000
|
$45.000
|
$220.000
|
|
1
|
|
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
|
LF
|
626.000
|
$55.000
|
$50.000
|
$39.000
|
$30.000
|
$33.500
|
$120.000
|
|
Totals: |
$3,653,241.095
|
$3,425,176.890
|
$3,877,226.586
|
$4,053,006.480
|
$4,770,654.210
|
$5,211,613.819
|