|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,285.000
|
$20.000
|
$20.000
|
$45.000
|
$16.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
85.000
|
$6.000
|
$22.000
|
$78.000
|
$70.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
25.000
|
$20.000
|
$80.000
|
$170.000
|
$75.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
30.000
|
$45.000
|
$80.000
|
$180.000
|
$75.000
|
|
|
BACKFILL (TY B)
|
STA
|
76.000
|
$235.000
|
$340.000
|
$320.000
|
$275.000
|
|
|
BLOCK SODDING
|
SY
|
120.000
|
$5.500
|
$20.000
|
$15.000
|
$10.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
60.000
|
$0.600
|
$10.000
|
$3.000
|
$0.500
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
60.000
|
$0.450
|
$10.000
|
$3.000
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
2.000
|
$20.000
|
$150.000
|
$330.000
|
$100.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
1,100.000
|
$65.000
|
$114.000
|
$115.000
|
$100.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
34,177.000
|
$2.850
|
$2.650
|
$4.300
|
$3.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
22,184.000
|
$2.500
|
$2.650
|
$4.400
|
$3.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
2,127.000
|
$5.000
|
$5.750
|
$6.000
|
$3.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
3.000
|
$160.000
|
$3,000.000
|
$2,300.000
|
$1,300.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
15.000
|
$600.000
|
$1,100.000
|
$750.000
|
$650.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
52.000
|
$185.000
|
$365.000
|
$250.000
|
$225.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
262.000
|
$550.000
|
$620.000
|
$600.000
|
$650.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
899.000
|
$33.000
|
$36.000
|
$28.000
|
$50.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
2.000
|
$6,800.000
|
$18,000.000
|
$24,500.000
|
$9,500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,225.000
|
$3,000.000
|
$1,100.000
|
$2,850.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$280,000.000
|
$358,000.000
|
$313,500.000
|
$429,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$6,600.000
|
$20,000.000
|
$5,078.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
170.000
|
$40.000
|
$40.000
|
$37.000
|
$35.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
55.000
|
$55.000
|
$75.000
|
$110.000
|
$80.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
225.000
|
$9.500
|
$15.000
|
$8.000
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
305.000
|
$3.500
|
$12.000
|
$6.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
305.000
|
$0.750
|
$5.000
|
$3.000
|
$1.250
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
5,000.000
|
$35.000
|
$30.000
|
$27.500
|
$33.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,850.000
|
$2,950.000
|
$3,200.000
|
$3,000.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,475.000
|
$1,500.000
|
$1,100.000
|
$1,650.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,675.000
|
$2.550
|
$2.750
|
$3.000
|
$6.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$340.000
|
$300.000
|
$125.000
|
$670.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
13.000
|
$3,450.000
|
$3,100.000
|
$2,775.000
|
$3,700.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
9.000
|
$330.000
|
$300.000
|
$275.000
|
$525.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$670.000
|
$1,400.000
|
$1,300.000
|
$730.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$140.000
|
$105.000
|
$100.000
|
$115.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
13.000
|
$20.000
|
$37.000
|
$35.000
|
$8.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
70.000
|
$46.000
|
$47.000
|
$45.000
|
$20.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
920.000
|
$1.030
|
$1.400
|
$0.990
|
$1.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,504.000
|
$1.050
|
$1.400
|
$0.990
|
$1.500
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,440.000
|
$1.750
|
$2.530
|
$0.800
|
$2.650
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
7,369.000
|
$1.200
|
$1.260
|
$0.810
|
$1.300
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,015.000
|
$2.750
|
$3.370
|
$2.780
|
$3.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,580.000
|
$8.000
|
$10.320
|
$6.400
|
$11.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
80.000
|
$0.850
|
$4.000
|
$1.500
|
$4.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
600.000
|
$8.000
|
$10.320
|
$6.500
|
$11.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
7,270.000
|
$0.750
|
$0.720
|
$0.710
|
$0.750
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
26,760.000
|
$0.770
|
$0.680
|
$0.690
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
4,420.000
|
$0.700
|
$0.790
|
$0.710
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
26,625.000
|
$0.840
|
$0.680
|
$0.690
|
$0.750
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
51.000
|
$235.000
|
$275.000
|
$226.000
|
$285.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
3.000
|
$380.000
|
$400.000
|
$340.000
|
$420.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
33.000
|
$300.000
|
$275.000
|
$339.000
|
$285.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
78.000
|
$40.000
|
$34.000
|
$39.000
|
$35.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
820.000
|
$4.500
|
$3.790
|
$3.510
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
602.000
|
$4.500
|
$5.050
|
$3.510
|
$5.250
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
117.000
|
$3.850
|
$5.690
|
$3.510
|
$6.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
16,824.000
|
$147.000
|
$135.000
|
$165.000
|
$155.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
39,297.000
|
$3.300
|
$0.010
|
$0.010
|
$4.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
56.000
|
$120.000
|
$150.000
|
$35.000
|
$100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
72.000
|
$250.000
|
$50.000
|
$185.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
152.000
|
$65.000
|
$20.000
|
$20.000
|
$90.000
|
|
Totals: |
$3,840,522.550
|
$3,759,444.640
|
$4,232,839.460
|
$4,300,929.700
|