|
|
REMOVING CONC (PAV)
|
SY
|
14.000
|
$10.000
|
$40.000
|
$35.000
|
$30.000
|
$57.700
|
$29.000
|
$17.600
|
$40.000
|
$20.000
|
$6.970
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
66.000
|
$10.000
|
$25.000
|
$35.000
|
$30.000
|
$45.100
|
$30.000
|
$13.700
|
$40.000
|
$20.000
|
$11.430
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
612.000
|
$15.000
|
$25.000
|
$30.000
|
$30.000
|
$28.300
|
$30.000
|
$12.900
|
$40.000
|
$20.000
|
$24.510
|
|
|
REMOVING CONC (CURB)
|
LF
|
140.000
|
$1.500
|
$15.000
|
$10.000
|
$10.000
|
$6.200
|
$5.850
|
$10.600
|
$8.000
|
$20.000
|
$5.830
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
565.000
|
$10.000
|
$10.000
|
$12.000
|
$20.000
|
$8.900
|
$9.400
|
$12.200
|
$10.000
|
$20.000
|
$11.180
|
|
|
REMOVE CONC (GUTTER)
|
LF
|
60.000
|
$10.000
|
$10.000
|
$12.000
|
$20.000
|
$11.500
|
$9.400
|
$7.600
|
$20.000
|
$20.000
|
$8.130
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
109.000
|
$20.000
|
$25.000
|
$25.000
|
$30.000
|
$60.000
|
$37.000
|
$21.400
|
$20.000
|
$20.000
|
$34.840
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
645.000
|
$5.000
|
$25.000
|
$20.000
|
$30.000
|
$36.500
|
$32.000
|
$6.200
|
$40.000
|
$20.000
|
$14.720
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
663.000
|
$15.000
|
$40.000
|
$22.000
|
$30.000
|
$31.800
|
$25.000
|
$37.000
|
$30.000
|
$20.000
|
$20.610
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
396.000
|
$40.000
|
$65.000
|
$35.000
|
$30.000
|
$44.800
|
$32.000
|
$24.000
|
$28.000
|
$30.000
|
$51.520
|
|
|
BLOCK SODDING
|
SY
|
2,628.000
|
$5.000
|
$1.000
|
$6.000
|
$4.000
|
$5.450
|
$6.500
|
$4.880
|
$5.000
|
$6.000
|
$3.780
|
|
|
VEGETATIVE WATERING
|
MG
|
7.200
|
$15.000
|
$1.000
|
$100.000
|
$10.000
|
$1.000
|
$290.000
|
$191.000
|
$10.000
|
$1,000.000
|
$36.800
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR 4)(9")
|
SY
|
734.000
|
$10.000
|
$10.000
|
$22.000
|
$30.000
|
$70.550
|
$36.000
|
$49.200
|
$70.000
|
$60.000
|
$58.880
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
148.000
|
$90.000
|
$200.000
|
$100.000
|
$100.000
|
$135.700
|
$190.000
|
$225.000
|
$140.000
|
$250.000
|
$182.650
|
|
|
D-GR HMA(SQ) TY-C SAC-A PG64-22
|
TON
|
49.000
|
$120.000
|
$250.000
|
$100.000
|
$200.000
|
$136.200
|
$255.000
|
$360.000
|
$140.000
|
$400.000
|
$272.990
|
|
|
CONC PVMT (CONT REINF - CRCP) (8")
|
SY
|
30.000
|
$40.000
|
$135.000
|
$500.000
|
$150.000
|
$208.000
|
$95.000
|
$313.000
|
$130.000
|
$200.000
|
$116.450
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
238.000
|
$150.000
|
$45.000
|
$35.000
|
$100.000
|
$97.750
|
$93.000
|
$152.000
|
$80.000
|
$85.000
|
$136.940
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
24.000
|
$550.000
|
$650.000
|
$400.000
|
$500.000
|
$608.000
|
$495.000
|
$685.000
|
$600.000
|
$650.000
|
$755.860
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
21.000
|
$220.000
|
$80.000
|
$300.000
|
$500.000
|
$195.000
|
$150.000
|
$181.000
|
$200.000
|
$185.000
|
$258.330
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
2.000
|
$700.000
|
$650.000
|
$500.000
|
$500.000
|
$710.000
|
$630.000
|
$836.000
|
$600.000
|
$1,500.000
|
$822.790
|
|
|
RAIL (HANDRAIL)(TY A)
|
LF
|
75.000
|
$120.000
|
$200.000
|
$225.000
|
$150.000
|
$290.000
|
$200.000
|
$366.000
|
$180.000
|
$210.000
|
$445.720
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
13.000
|
$60.000
|
$150.000
|
$75.000
|
$100.000
|
$180.000
|
$93.000
|
$117.000
|
$70.000
|
$150.000
|
$84.200
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,000.000
|
$1,500.000
|
$1,500.000
|
$1,100.000
|
$1,765.000
|
$925.000
|
$1,780.000
|
$800.000
|
$1,850.000
|
$2,013.610
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,100.000
|
$1,500.000
|
$1,500.000
|
$1,100.000
|
$1,895.000
|
$1,020.000
|
$2,390.000
|
$900.000
|
$2,000.000
|
$2,331.550
|
|
|
GRATE & FRAME
|
EA
|
19.000
|
$1,200.000
|
$1,000.000
|
$1,500.000
|
$1,500.000
|
$2,720.000
|
$2,510.000
|
$3,440.000
|
$2,500.000
|
$3,500.000
|
$6,027.590
|
|
|
REMOVE STR (BOLLARD)
|
EA
|
2.000
|
$150.000
|
$250.000
|
$300.000
|
$100.000
|
$100.000
|
$205.000
|
$203.000
|
$100.000
|
$500.000
|
$169.910
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$36,000.000
|
$85,000.000
|
$60,000.000
|
$50,000.000
|
$55,705.000
|
$112,000.000
|
$55,000.000
|
$50,000.000
|
$125,000.000
|
$125,114.900
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$3,000.000
|
$1,000.000
|
$3,000.000
|
$3,000.000
|
$1,625.000
|
$2,750.000
|
$2,710.000
|
$4,000.000
|
$8,500.000
|
$7,359.700
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
160.000
|
$30.000
|
$0.100
|
$25.000
|
$10.000
|
$38.050
|
$46.000
|
$47.200
|
$18.000
|
$30.000
|
$45.330
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
160.000
|
$10.000
|
$0.100
|
$15.000
|
$1.000
|
$10.870
|
$13.000
|
$12.900
|
$12.000
|
$15.000
|
$12.480
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
18.000
|
$15.000
|
$0.100
|
$20.000
|
$1.000
|
$9.780
|
$12.000
|
$22.000
|
$6.000
|
$10.000
|
$13.340
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,088.000
|
$2.000
|
$0.100
|
$3.000
|
$2.000
|
$4.080
|
$5.000
|
$4.410
|
$3.000
|
$4.000
|
$3.260
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,088.000
|
$1.000
|
$0.100
|
$1.000
|
$1.000
|
$1.630
|
$2.000
|
$1.780
|
$1.000
|
$2.000
|
$1.010
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
214.000
|
$5.000
|
$0.100
|
$12.000
|
$3.000
|
$5.440
|
$6.550
|
$11.400
|
$6.000
|
$18.000
|
$7.340
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
214.000
|
$1.000
|
$0.100
|
$2.000
|
$1.000
|
$1.630
|
$2.000
|
$2.270
|
$2.000
|
$9.000
|
$2.010
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
904.000
|
$20.000
|
$40.000
|
$25.000
|
$30.000
|
$36.650
|
$22.000
|
$40.000
|
$43.000
|
$50.000
|
$35.600
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
84.000
|
$500.000
|
$300.000
|
$159.000
|
$400.000
|
$245.000
|
$195.000
|
$372.000
|
$105.000
|
$200.000
|
$463.660
|
|
|
CONC CURB & GUTTER (SLOTTED)
|
LF
|
31.000
|
$15.000
|
$40.000
|
$50.000
|
$50.000
|
$175.000
|
$36.000
|
$80.000
|
$70.000
|
$50.000
|
$463.660
|
|
|
CONCRETE GUTTER (MODIFIED)
|
LF
|
11.000
|
$100.000
|
$75.000
|
$50.000
|
$50.000
|
$160.000
|
$59.000
|
$131.000
|
$90.000
|
$100.000
|
$57.350
|
|
|
DRIVEWAYS (CONC)
|
SY
|
872.000
|
$70.000
|
$100.000
|
$55.000
|
$70.000
|
$70.000
|
$135.000
|
$92.000
|
$90.000
|
$85.000
|
$103.440
|
|
|
CONC SIDEWALKS (4")
|
SY
|
1,925.000
|
$50.000
|
$100.000
|
$52.000
|
$70.000
|
$59.290
|
$55.000
|
$65.000
|
$65.000
|
$65.000
|
$74.770
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
$2,355.000
|
$1,700.000
|
$1,500.000
|
$955.000
|
$2,080.000
|
$2,500.000
|
$3,000.000
|
$2,247.880
|
|
|
CURB RAMPS (TY 5)
|
EA
|
2.000
|
$2,600.000
|
$1,500.000
|
$3,200.000
|
$1,700.000
|
$1,675.000
|
$965.000
|
$3,200.000
|
$2,000.000
|
$3,000.000
|
$4,277.680
|
|
|
CURB RAMPS (TY 7)
|
SY
|
99.000
|
$150.000
|
$150.000
|
$1,550.000
|
$1,500.000
|
$110.600
|
$180.000
|
$182.000
|
$500.000
|
$650.000
|
$235.800
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE A)
|
SY
|
62.000
|
$200.000
|
$175.000
|
$68.000
|
$200.000
|
$282.700
|
$220.000
|
$916.000
|
$500.000
|
$85.000
|
$492.460
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
63.000
|
$200.000
|
$175.000
|
$69.000
|
$150.000
|
$100.000
|
$130.000
|
$116.000
|
$500.000
|
$125.000
|
$172.920
|
|
|
CONCRETE MEDIAN (NOSE)
|
SY
|
2.000
|
$100.000
|
$125.000
|
$2,500.000
|
$500.000
|
$720.000
|
$550.000
|
$267.000
|
$200.000
|
$250.000
|
$93.660
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
2.000
|
$180.000
|
$400.000
|
$250.000
|
$300.000
|
$190.000
|
$600.000
|
$157.000
|
$400.000
|
$850.000
|
$246.840
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
215.000
|
$40.000
|
$20.000
|
$14.000
|
$15.000
|
$23.900
|
$18.250
|
$22.000
|
$25.000
|
$15.000
|
$32.380
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
370.000
|
$30.000
|
$30.000
|
$30.000
|
$30.000
|
$54.350
|
$40.000
|
$50.000
|
$55.000
|
$40.000
|
$73.600
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
510.000
|
$1.500
|
$1.500
|
$3.000
|
$1.000
|
$1.750
|
$2.500
|
$1.600
|
$2.500
|
$3.000
|
$2.360
|
|
|
GROUND BOX TY D (162922)
|
EA
|
11.000
|
$2,700.000
|
$800.000
|
$1,250.000
|
$800.000
|
$1,630.500
|
$1,650.000
|
$1,500.000
|
$2,000.000
|
$1,000.000
|
$2,207.910
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
1.000
|
$1,400.000
|
$1,000.000
|
$2,500.000
|
$1,000.000
|
$1,630.500
|
$1,960.000
|
$1,500.000
|
$2,000.000
|
$1,000.000
|
$2,207.910
|
|
|
REMOVE GROUND BOX
|
EA
|
7.000
|
$500.000
|
$100.000
|
$100.000
|
$200.000
|
$217.400
|
$490.000
|
$200.000
|
$400.000
|
$150.000
|
$294.390
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
4.000
|
$500.000
|
$800.000
|
$650.000
|
$400.000
|
$350.000
|
$850.000
|
$496.000
|
$300.000
|
$900.000
|
$781.040
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
5.000
|
$550.000
|
$800.000
|
$850.000
|
$400.000
|
$760.900
|
$1,115.000
|
$433.000
|
$300.000
|
$900.000
|
$671.260
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
2.000
|
$80.000
|
$100.000
|
$5.000
|
$50.000
|
$61.000
|
$198.000
|
$77.000
|
$20.000
|
$100.000
|
$113.210
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
1,028.000
|
$6.000
|
$5.000
|
$11.400
|
$8.000
|
$7.600
|
$15.000
|
$8.000
|
$30.000
|
$10.000
|
$10.300
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
7.000
|
$120.000
|
$150.000
|
$170.000
|
$150.000
|
$217.400
|
$220.000
|
$250.000
|
$250.000
|
$250.000
|
$294.390
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
1,028.000
|
$10.000
|
$5.000
|
$3.800
|
$3.000
|
$3.250
|
$2.900
|
$4.000
|
$30.000
|
$5.000
|
$4.420
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
7.000
|
$70.000
|
$125.000
|
$40.000
|
$80.000
|
$68.500
|
$72.000
|
$75.000
|
$250.000
|
$100.000
|
$92.730
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
16.000
|
$0.500
|
$5.000
|
$0.500
|
$1.000
|
$2.200
|
$0.950
|
$10.000
|
$4.000
|
$3.000
|
$2.940
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
96.000
|
$0.500
|
$5.000
|
$2.500
|
$1.000
|
$5.450
|
$4.890
|
$10.000
|
$4.000
|
$6.000
|
$7.360
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
16.000
|
$0.500
|
$5.000
|
$2.000
|
$1.000
|
$5.450
|
$4.890
|
$10.000
|
$4.000
|
$6.000
|
$7.360
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
474.000
|
$5.000
|
$10.000
|
$6.000
|
$4.000
|
$2.200
|
$6.250
|
$4.000
|
$2.000
|
$3.000
|
$2.940
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
1.000
|
$80.000
|
$55.000
|
$125.000
|
$50.000
|
$108.700
|
$92.000
|
$85.000
|
$200.000
|
$150.000
|
$147.190
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
112.000
|
$0.100
|
$1.000
|
$1.500
|
$1.000
|
$1.100
|
$0.160
|
$2.000
|
$1.000
|
$2.000
|
$1.470
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,028.000
|
$1.000
|
$2.000
|
$10.000
|
$1.000
|
$3.250
|
$1.200
|
$6.000
|
$4.000
|
$4.000
|
$4.420
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
7.000
|
$20.000
|
$50.000
|
$400.000
|
$20.000
|
$54.350
|
$20.000
|
$45.000
|
$50.000
|
$100.000
|
$73.600
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
18.000
|
$600.000
|
$850.000
|
$400.000
|
$800.000
|
$755.000
|
$505.000
|
$695.000
|
$800.000
|
$2,850.000
|
$1,023.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
1,825.000
|
$1.000
|
$2.000
|
$3.000
|
$1.000
|
$1.800
|
$2.950
|
$1.650
|
$2.000
|
$3.000
|
$2.430
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
1,240.000
|
$1.500
|
$3.000
|
$4.000
|
$2.000
|
$2.000
|
$4.240
|
$1.850
|
$2.500
|
$3.000
|
$2.720
|
|
|
PED POLE ASSEMBLY
|
EA
|
10.000
|
$2,000.000
|
$2,500.000
|
$1,900.000
|
$1,500.000
|
$2,830.000
|
$2,450.000
|
$2,600.000
|
$3,000.000
|
$2,500.000
|
$3,827.040
|
|
|
PEDESTRIAN PUSH BUTTON POLE
|
EA
|
4.000
|
$1,600.000
|
$3,000.000
|
$2,500.000
|
$1,500.000
|
$2,830.000
|
$3,300.000
|
$2,600.000
|
$3,000.000
|
$2,500.000
|
$3,827.040
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
14.000
|
$900.000
|
$1,200.000
|
$750.000
|
$80.000
|
$869.600
|
$980.000
|
$800.000
|
$1,000.000
|
$1,800.000
|
$1,177.550
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
1.000
|
$3,000.000
|
$5,000.000
|
$3,500.000
|
$3,000.000
|
$4,160.000
|
$4,600.000
|
$3,830.000
|
$4,000.000
|
$6,500.000
|
$5,630.170
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
10.000
|
$160.000
|
$200.000
|
$150.000
|
$100.000
|
$163.050
|
$138.000
|
$150.000
|
$200.000
|
$500.000
|
$220.790
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
6.000
|
$150.000
|
$100.000
|
$100.000
|
$50.000
|
$54.350
|
$105.000
|
$50.000
|
$100.000
|
$500.000
|
$73.600
|
|
|
REMOVAL OF TRAFFIC SIGNAL POLE FND
|
LF
|
6.000
|
$500.000
|
$800.000
|
$900.000
|
$50.000
|
$1,195.700
|
$1,110.000
|
$1,100.000
|
$1,500.000
|
$1,500.000
|
$1,619.130
|
|
|
REMOVE PED POLE ASSM
|
EA
|
1.000
|
$250.000
|
$500.000
|
$900.000
|
$200.000
|
$380.450
|
$1,110.000
|
$350.000
|
$400.000
|
$2,500.000
|
$515.180
|
|
|
RELOCATE OF PEDESTRIAN PUSH BUTTON
|
EA
|
4.000
|
$300.000
|
$500.000
|
$600.000
|
$200.000
|
$108.700
|
$755.000
|
$100.000
|
$175.000
|
$2,000.000
|
$147.190
|
|
|
UNDERSEAL COURSE
|
GAL
|
112.000
|
$5.000
|
$20.000
|
$40.000
|
$4.000
|
$15.400
|
$65.500
|
$17.000
|
$100.000
|
$10.000
|
$3.790
|
|
|
TMA (STATIONARY)
|
DAY
|
120.000
|
$200.000
|
$50.000
|
$250.000
|
$200.000
|
$480.000
|
$265.000
|
$100.000
|
$100.000
|
$350.000
|
$515.180
|
|
Totals: |
$707,722.200
|
$862,612.400
|
$879,451.600
|
$896,642.000
|
$909,466.850
|
$960,917.900
|
$976,036.990
|
$1,035,963.000
|
$1,222,427.000
|
$1,303,869.160
|