EXCAVATION (ROADWAY)
|
CY
|
2,833.000
|
$14.000
|
$19.000
|
$20.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
4,225.000
|
$15.000
|
$19.000
|
$21.000
|
$20.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
120,810.000
|
$1.500
|
$0.050
|
$0.550
|
$0.700
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
53,334.000
|
$0.200
|
$0.200
|
$0.220
|
$0.280
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
53,334.000
|
$0.200
|
$0.100
|
$0.170
|
$0.260
|
|
|
VEGETATIVE WATERING
|
MG
|
862.000
|
$17.000
|
$1.000
|
$30.000
|
$10.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
7,110.000
|
$55.000
|
$55.000
|
$66.200
|
$68.000
|
|
|
REWORK BS MTL (TY C)(12")(ORD COMP)
|
SY
|
32,300.000
|
$5.000
|
$1.750
|
$2.150
|
$1.750
|
|
|
CEMENT
|
TON
|
527.000
|
$230.000
|
$259.000
|
$260.000
|
$300.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
45,005.000
|
$3.000
|
$2.500
|
$3.000
|
$2.800
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
|
GAL
|
60,551.000
|
$8.000
|
$2.000
|
$3.300
|
$4.500
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
4,037.000
|
$4.300
|
$4.000
|
$3.800
|
$5.500
|
|
|
ASPH (CRS-2)
|
GAL
|
18,165.000
|
$3.650
|
$3.850
|
$3.000
|
$3.500
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
299.000
|
$152.000
|
$165.000
|
$130.000
|
$115.000
|
|
|
CEM STABIL BKFL
|
CY
|
8.000
|
$155.000
|
$435.000
|
$325.000
|
$250.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
40.000
|
$170.000
|
$115.000
|
$130.000
|
$100.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
33.000
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
96.000
|
$340.000
|
$1,040.000
|
$512.000
|
$400.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
896.000
|
$77.000
|
$125.000
|
$68.000
|
$68.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
4.000
|
$10,000.000
|
$11,500.000
|
$9,000.000
|
$7,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
48.000
|
$1,100.000
|
$2,100.000
|
$1,520.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$1,800.000
|
$3,200.000
|
$1,900.000
|
$2,100.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$2,000.000
|
$4,000.000
|
$2,300.000
|
$2,400.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$2,500.000
|
$2,000.000
|
$3,000.000
|
$2,700.000
|
|
|
REMOV STR (PIPE)
|
LF
|
976.000
|
$20.000
|
$15.000
|
$15.000
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$230,000.000
|
$273,000.000
|
$270,000.000
|
$285,800.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$6,000.000
|
$14,500.000
|
$7,000.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
585.000
|
$62.000
|
$65.000
|
$65.000
|
$80.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
585.000
|
$10.500
|
$15.000
|
$15.000
|
$27.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,040.000
|
$3.000
|
$6.000
|
$4.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,040.000
|
$0.760
|
$1.150
|
$1.000
|
$1.750
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,023.000
|
$45.000
|
$45.000
|
$86.000
|
$47.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
182.000
|
$50.000
|
$45.000
|
$67.000
|
$45.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
23,158.000
|
$0.180
|
$0.290
|
$0.200
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
11,304.000
|
$0.200
|
$0.290
|
$0.320
|
$0.250
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
15.000
|
$285.000
|
$320.000
|
$280.000
|
$300.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
|
EA
|
2.000
|
$1,130.000
|
$1,025.000
|
$900.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
20.000
|
$440.000
|
$500.000
|
$420.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
6.000
|
$500.000
|
$575.000
|
$500.000
|
$550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
11.000
|
$125.000
|
$115.000
|
$100.000
|
$110.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
13.000
|
$225.000
|
$250.000
|
$300.000
|
$325.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
|
EA
|
8.000
|
$75.000
|
$70.000
|
$60.000
|
$65.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
8.000
|
$95.000
|
$100.000
|
$90.000
|
$95.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,460.000
|
$1.300
|
$1.550
|
$1.030
|
$1.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
149.000
|
$7.200
|
$12.500
|
$11.000
|
$12.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
24,037.000
|
$0.600
|
$0.750
|
$0.650
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
2,240.000
|
$0.680
|
$0.780
|
$0.690
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
10,772.000
|
$0.650
|
$0.750
|
$0.670
|
$0.700
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
250.000
|
$3.800
|
$8.000
|
$7.300
|
$7.500
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
4,440.000
|
$130.000
|
$130.000
|
$115.000
|
$110.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
8,073.000
|
$3.000
|
$0.010
|
$4.000
|
$4.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
42.000
|
$75.000
|
$100.000
|
$100.000
|
$100.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,500.000
|
$15,000.000
|
$11,800.000
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
120.000
|
$215.000
|
$100.000
|
$250.000
|
$185.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
30.000
|
$50.000
|
$50.000
|
$40.000
|
$80.000
|
|
Totals: |
$3,085,753.090
|
$2,735,685.610
|
$2,801,684.230
|
$2,855,664.160
|