PREPARING ROW
|
STA
|
9.350
|
$3,000.000
|
$2,500.000
|
$2,140.000
|
$19,500.000
|
$15,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,615.000
|
$10.000
|
$15.000
|
$10.700
|
$14.000
|
$4.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
31.000
|
$50.000
|
$15.000
|
$23.500
|
$45.000
|
$50.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
1,767.000
|
$5.000
|
$7.000
|
$3.900
|
$2.000
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
157.000
|
$9.000
|
$20.000
|
$19.300
|
$30.000
|
$65.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
2,195.000
|
$16.000
|
$15.000
|
$11.300
|
$20.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
1,655.000
|
$11.000
|
$18.000
|
$8.400
|
$14.000
|
$22.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
2,067.000
|
$1.000
|
$5.000
|
$2.700
|
$2.000
|
$4.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
2,067.000
|
$0.500
|
$1.000
|
$0.530
|
$0.500
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
33.000
|
$25.000
|
$50.000
|
$42.700
|
$16.000
|
$26.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
2,067.000
|
$1.000
|
$3.000
|
$1.350
|
$1.300
|
$1.100
|
|
|
PROOF ROLLING
|
HR
|
42.000
|
$75.000
|
$80.000
|
$54.600
|
$55.000
|
$70.000
|
|
|
FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS
|
CY
|
354.000
|
$50.000
|
$50.000
|
$71.900
|
$75.000
|
$110.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
425.000
|
$4.000
|
$7.000
|
$4.250
|
$4.000
|
$4.000
|
|
|
D-GR HMA(SQ) TY-C SAC-B PG70-22
|
TON
|
235.000
|
$85.000
|
$150.000
|
$211.000
|
$200.000
|
$200.000
|
|
|
D-GR HMA(SQ) TY-C PG70-22
|
TON
|
235.000
|
$150.000
|
$150.000
|
$201.000
|
$190.000
|
$190.000
|
|
|
CEM STABIL BKFL
|
CY
|
129.000
|
$100.000
|
$150.000
|
$140.000
|
$210.000
|
$185.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
920.000
|
$15.000
|
$35.000
|
$87.500
|
$24.000
|
$95.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
887.000
|
$345.000
|
$535.000
|
$293.000
|
$400.000
|
$370.000
|
|
|
CORE HOLE
|
EA
|
30.000
|
$500.000
|
$300.000
|
$224.000
|
$250.000
|
$150.000
|
|
|
CL C CONC (ABUT)
|
CY
|
68.100
|
$900.000
|
$1,127.000
|
$976.000
|
$1,200.000
|
$1,650.000
|
|
|
CL C CONC (CAP)
|
CY
|
208.500
|
$1,000.000
|
$1,127.000
|
$1,010.000
|
$1,300.000
|
$1,310.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
110.000
|
$925.000
|
$925.400
|
$788.000
|
$1,000.000
|
$1,045.000
|
|
|
REINF CONC SLAB
|
SF
|
17,940.000
|
$16.000
|
$17.000
|
$23.500
|
$25.000
|
$30.000
|
|
|
APPROACH SLAB
|
CY
|
113.500
|
$585.000
|
$847.000
|
$623.000
|
$575.000
|
$700.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
330.000
|
$15.000
|
$40.000
|
$58.500
|
$34.000
|
$40.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
2,321.620
|
$145.000
|
$145.000
|
$183.000
|
$185.000
|
$240.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
2.000
|
$535.000
|
$1,600.000
|
$1,040.000
|
$850.000
|
$1,500.000
|
|
|
RIPRAP (STONE TY R)(DRY)(6 IN)
|
CY
|
3.000
|
$115.000
|
$800.000
|
$356.000
|
$400.000
|
$1,400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
31.000
|
$460.000
|
$450.000
|
$751.000
|
$600.000
|
$750.000
|
|
|
RAIL (TY T221)
|
LF
|
820.000
|
$80.000
|
$65.000
|
$81.700
|
$77.000
|
$150.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
239.500
|
$80.000
|
$91.850
|
$138.000
|
$130.000
|
$100.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
155.000
|
$110.000
|
$150.000
|
$141.000
|
$125.000
|
$145.000
|
|
|
GABION MATTRESSES (GALV)(18 IN)
|
SY
|
2,204.000
|
$65.000
|
$91.000
|
$112.000
|
$120.000
|
$105.000
|
|
|
GABIONS (5'X 3')(GALV)
|
CY
|
499.000
|
$175.000
|
$187.600
|
$276.000
|
$265.000
|
$250.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
29.000
|
$100.000
|
$98.000
|
$88.500
|
$100.000
|
$300.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$5,200.000
|
$8,330.000
|
$5,400.000
|
$6,500.000
|
$8,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$1,800.000
|
$1,880.000
|
$1,750.000
|
$4,500.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$75,000.000
|
$50,000.000
|
$96,100.000
|
$52,000.000
|
$55,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$263,250.000
|
$285,000.000
|
$290,000.000
|
$360,000.000
|
$320,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
25.000
|
$8,000.000
|
$2,500.000
|
$1,280.000
|
$6,000.000
|
$1,800.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
60.000
|
$30.000
|
$30.000
|
$31.700
|
$30.000
|
$38.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
60.000
|
$9.000
|
$20.000
|
$26.400
|
$25.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$25.000
|
$25.000
|
$21.100
|
$20.000
|
$34.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$7.000
|
$15.000
|
$16.900
|
$16.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,926.000
|
$3.000
|
$3.000
|
$4.250
|
$4.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,926.000
|
$1.000
|
$1.000
|
$1.050
|
$1.000
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
25.000
|
$4,000.000
|
$2,400.000
|
$2,110.000
|
$1.000
|
$3,400.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
940.000
|
$25.000
|
$16.000
|
$46.300
|
$25.000
|
$45.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,780.000
|
$6.000
|
$10.000
|
$2.350
|
$5.000
|
$7.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
940.000
|
$7.000
|
$10.000
|
$9.500
|
$12.000
|
$13.000
|
|
|
CONC CURB (TY I)
|
LF
|
40.000
|
$11.000
|
$30.000
|
$37.200
|
$47.000
|
$125.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
775.000
|
$40.000
|
$38.500
|
$33.300
|
$40.000
|
$34.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,800.000
|
$2,585.000
|
$3,320.000
|
$2,750.000
|
$2,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
450.000
|
$3.000
|
$2.200
|
$2.100
|
$5.000
|
$2.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,700.000
|
$3,355.000
|
$2,310.000
|
$4,000.000
|
$3,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$375.000
|
$220.000
|
$317.000
|
$400.000
|
$206.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$850.000
|
$600.000
|
$793.000
|
$650.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$650.000
|
$500.000
|
$528.000
|
$650.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$6,500.000
|
$8,500.000
|
$9,940.000
|
$10,500.000
|
$9,400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$535.000
|
$704.000
|
$555.000
|
$600.000
|
$525.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$115.000
|
$22.000
|
$127.000
|
$120.000
|
$120.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$30.000
|
$20.900
|
$33.800
|
$20.000
|
$32.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
15.000
|
$25.000
|
$25.300
|
$38.100
|
$33.000
|
$36.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,880.000
|
$1.000
|
$1.320
|
$1.250
|
$1.200
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
72.000
|
$6.000
|
$16.500
|
$15.900
|
$15.000
|
$15.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,880.000
|
$1.000
|
$1.320
|
$1.250
|
$1.200
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,790.000
|
$0.500
|
$1.320
|
$1.250
|
$1.200
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,870.000
|
$0.500
|
$1.320
|
$1.250
|
$1.200
|
$2.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
24.000
|
$3.000
|
$55.000
|
$52.900
|
$50.000
|
$50.000
|
|
|
BONDING COURSE
|
GAL
|
319.000
|
$4.000
|
$5.500
|
$5.300
|
$5.000
|
$5.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$200.000
|
$300.000
|
$267.000
|
$550.000
|
$350.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$15,000.000
|
$157,000.000
|
$10,000.000
|
$14,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
404.000
|
$160.000
|
$250.000
|
$65.400
|
$140.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
16.000
|
$80.000
|
$150.000
|
$77.100
|
$150.000
|
$600.000
|
|
|
STRMWTR TREAT UNIT (54 IN) (3 CART)
|
EA
|
1.000
|
$75,000.000
|
$55,000.000
|
$50,600.000
|
$62,000.000
|
$85,000.000
|
|
Totals: |
$2,908,908.900
|
$3,176,381.375
|
$3,472,260.870
|
$3,665,748.800
|
$4,035,749.000
|