|
|
PREPARING ROW
|
STA
|
185.000
|
$2,500.000
|
$500.000
|
$439.560
|
$1,250.000
|
$533.120
|
$350.000
|
$525.000
|
$1,500.000
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
10,644.000
|
$5.000
|
$4.500
|
$7.150
|
$7.100
|
$3.000
|
$7.000
|
$6.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
12,361.000
|
$20.000
|
$18.500
|
$8.240
|
$11.500
|
$12.700
|
$13.000
|
$18.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
2,118.000
|
$30.000
|
$8.000
|
$20.080
|
$6.750
|
$9.570
|
$24.000
|
$18.000
|
$10.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
619.000
|
$160.000
|
$90.000
|
$102.240
|
$125.000
|
$100.000
|
$250.000
|
$25.000
|
$25.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
31,115.000
|
$0.500
|
$0.270
|
$0.270
|
$0.410
|
$0.410
|
$0.560
|
$0.400
|
$0.650
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
15,559.000
|
$0.500
|
$0.270
|
$0.270
|
$0.360
|
$0.410
|
$0.890
|
$0.400
|
$1.000
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
15,559.000
|
$0.500
|
$0.270
|
$0.270
|
$0.360
|
$0.410
|
$0.780
|
$0.400
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
14,927.000
|
$50.000
|
$36.000
|
$38.620
|
$75.000
|
$27.830
|
$63.000
|
$95.000
|
$104.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
7,464.000
|
$4.000
|
$3.000
|
$4.280
|
$4.250
|
$4.060
|
$3.280
|
$3.250
|
$3.500
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
6,841.000
|
$4.000
|
$3.000
|
$3.030
|
$5.000
|
$2.450
|
$3.360
|
$4.000
|
$2.250
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
2,771.000
|
$110.000
|
$69.000
|
$112.840
|
$77.500
|
$89.250
|
$95.000
|
$75.000
|
$110.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
111,491.000
|
$4.000
|
$2.000
|
$2.530
|
$2.300
|
$2.420
|
$3.000
|
$2.250
|
$2.250
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
|
TON
|
39,073.000
|
$95.000
|
$67.500
|
$84.680
|
$67.000
|
$89.900
|
$79.000
|
$89.000
|
$79.150
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
1,267.000
|
$2.000
|
$8.750
|
$4.540
|
$2.950
|
$5.750
|
$3.000
|
$1.500
|
$5.250
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
6,357.000
|
$2.500
|
$2.500
|
$2.190
|
$2.950
|
$2.280
|
$3.120
|
$1.500
|
$3.500
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
4,295.000
|
$2.500
|
$3.000
|
$2.470
|
$2.950
|
$2.790
|
$2.650
|
$2.000
|
$4.000
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
598.000
|
$40.000
|
$19.250
|
$19.350
|
$22.000
|
$27.400
|
$28.750
|
$20.000
|
$15.000
|
|
|
CEM STABIL BKFL
|
CY
|
41.000
|
$200.000
|
$200.000
|
$208.770
|
$190.000
|
$197.260
|
$500.000
|
$195.000
|
$1,200.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
25.000
|
$135.000
|
$200.000
|
$208.770
|
$190.000
|
$197.260
|
$600.000
|
$195.000
|
$1,200.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
288.000
|
$25.000
|
$56.000
|
$25.460
|
$45.000
|
$49.310
|
$45.000
|
$45.000
|
$30.000
|
|
|
CL C CONC (RAC-R)
|
CY
|
27.200
|
$1,300.000
|
$800.000
|
$1,603.960
|
$1,500.000
|
$1,917.790
|
$2,000.000
|
$1,750.000
|
$1,150.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
930.000
|
$225.000
|
$158.000
|
$117.110
|
$135.000
|
$147.940
|
$155.250
|
$165.000
|
$140.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
10.800
|
$600.000
|
$715.000
|
$432.810
|
$450.000
|
$476.710
|
$968.960
|
$450.000
|
$1,100.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
598.000
|
$35.000
|
$21.000
|
$21.390
|
$30.000
|
$29.590
|
$31.050
|
$20.000
|
$7.000
|
|
|
RAIL (TY T221)
|
LF
|
104.000
|
$70.000
|
$142.000
|
$147.670
|
$188.000
|
$202.740
|
$257.600
|
$150.000
|
$300.000
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
638.667
|
$300.000
|
$210.000
|
$198.590
|
$225.000
|
$243.290
|
$276.000
|
$100.000
|
$150.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
30.000
|
$60.000
|
$52.000
|
$56.010
|
$66.000
|
$71.230
|
$69.520
|
$450.000
|
$200.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
68.000
|
$1,300.000
|
$460.000
|
$687.410
|
$700.000
|
$712.320
|
$700.000
|
$700.000
|
$750.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
17.000
|
$1,350.000
|
$675.000
|
$717.960
|
$1,200.000
|
$1,260.260
|
$1,300.000
|
$1,200.000
|
$1,050.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
54.000
|
$1,400.000
|
$630.000
|
$789.250
|
$950.000
|
$986.290
|
$1,500.000
|
$950.000
|
$1,050.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$23,000.000
|
$11,500.000
|
$15,123.070
|
$23,000.000
|
$24,657.280
|
$28,000.000
|
$22,000.000
|
$15,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
1.000
|
$5,000.000
|
$4,350.000
|
$5,142.850
|
$9,000.000
|
$5,479.390
|
$8,000.000
|
$5,000.000
|
$5,800.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
7.000
|
$5,500.000
|
$6,140.000
|
$5,244.700
|
$5,500.000
|
$5,753.360
|
$8,500.000
|
$5,000.000
|
$6,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
1.000
|
$7,000.000
|
$7,500.000
|
$6,874.120
|
$5,700.000
|
$6,027.330
|
$10,000.000
|
$5,000.000
|
$7,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$9,500.000
|
$9,200.000
|
$7,179.630
|
$5,900.000
|
$6,246.510
|
$14,000.000
|
$5,000.000
|
$10,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$830.000
|
$1,525.000
|
$1,069.310
|
$2,200.000
|
$2,410.940
|
$2,000.000
|
$2,000.000
|
$6,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$3,000.000
|
$2,285.000
|
$1,603.960
|
$2,050.000
|
$2,191.760
|
$2,000.000
|
$2,000.000
|
$10,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
30.000
|
$25.000
|
$15.000
|
$12.220
|
$15.000
|
$16.440
|
$52.520
|
$100.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$419,825.000
|
$300,000.000
|
$193,945.000
|
$575,000.000
|
$429,672.550
|
$701,701.000
|
$775,000.000
|
$830,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$10,000.000
|
$8,000.000
|
$7,886.750
|
$6,100.000
|
$9,877.050
|
$18,000.000
|
$2,500.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
244.000
|
$50.000
|
$52.000
|
$33.610
|
$40.000
|
$17.480
|
$49.420
|
$45.000
|
$60.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
244.000
|
$15.000
|
$15.150
|
$15.280
|
$9.000
|
$10.490
|
$18.240
|
$15.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
234.000
|
$30.000
|
$35.000
|
$15.650
|
$18.000
|
$13.960
|
$52.410
|
$15.000
|
$75.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
234.000
|
$10.000
|
$11.000
|
$4.290
|
$7.000
|
$7.530
|
$11.600
|
$15.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
22,819.000
|
$10.000
|
$4.550
|
$4.580
|
$6.000
|
$5.210
|
$6.810
|
$5.000
|
$9.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
22,819.000
|
$2.000
|
$0.750
|
$0.760
|
$1.000
|
$1.020
|
$0.820
|
$1.000
|
$0.750
|
|
|
PTB (FUR & INST)(STEEL)
|
LF
|
300.000
|
$200.000
|
$207.000
|
$163.370
|
$155.000
|
$156.850
|
$279.450
|
$150.000
|
$200.000
|
|
|
PTB (MOVE)(STEEL)
|
LF
|
2,100.000
|
$20.000
|
$19.000
|
$7.750
|
$5.000
|
$13.010
|
$13.480
|
$20.000
|
$12.000
|
|
|
PTB (STKPL)(STEEL)
|
LF
|
300.000
|
$30.000
|
$11.000
|
$10.140
|
$8.000
|
$14.310
|
$33.860
|
$50.000
|
$12.000
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
245.000
|
$40.000
|
$44.000
|
$76.380
|
$36.000
|
$38.360
|
$23.000
|
$35.000
|
$60.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
123,032.000
|
$0.200
|
$0.160
|
$0.160
|
$0.190
|
$0.090
|
$0.130
|
$0.140
|
$0.120
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
61,574.000
|
$0.250
|
$0.220
|
$0.220
|
$0.210
|
$0.180
|
$0.180
|
$0.230
|
$0.130
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
3,560.000
|
$25.000
|
$18.250
|
$18.330
|
$20.500
|
$19.730
|
$20.700
|
$17.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
28.000
|
$2,200.000
|
$1,550.000
|
$1,553.040
|
$1,850.000
|
$1,671.220
|
$1,753.750
|
$1,500.000
|
$2,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,100.000
|
$925.000
|
$916.550
|
$900.000
|
$986.290
|
$1,035.000
|
$950.000
|
$1,250.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
100.000
|
$25.000
|
$25.500
|
$28.510
|
$19.500
|
$30.680
|
$32.200
|
$30.000
|
$30.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,035.000
|
$5.000
|
$2.000
|
$2.040
|
$1.500
|
$2.190
|
$2.300
|
$2.000
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
26.000
|
$2,600.000
|
$2,250.000
|
$2,062.240
|
$2,075.000
|
$2,219.150
|
$2,328.750
|
$2,000.000
|
$3,200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
14.000
|
$1,800.000
|
$2,300.000
|
$518.620
|
$1,025.000
|
$2,493.120
|
$2,021.550
|
$2,200.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$800.000
|
$1,115.000
|
$518.610
|
$525.000
|
$1,205.470
|
$2,021.550
|
$1,100.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$12,000.000
|
$9,250.000
|
$8,759.750
|
$10,000.000
|
$10,027.290
|
$18,831.250
|
$9,500.000
|
$12,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
22.000
|
$500.000
|
$500.000
|
$504.100
|
$500.000
|
$542.460
|
$569.250
|
$500.000
|
$55.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$650.000
|
$590.000
|
$590.670
|
$600.000
|
$635.610
|
$667.000
|
$600.000
|
$125.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
6.000
|
$900.000
|
$725.000
|
$728.150
|
$725.000
|
$783.550
|
$822.250
|
$700.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,150.000
|
$1,000.000
|
$1,003.120
|
$1,000.000
|
$1,079.440
|
$1,132.750
|
$1,000.000
|
$1,250.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
4.000
|
$750.000
|
$380.000
|
$381.900
|
$400.000
|
$410.960
|
$431.250
|
$400.000
|
$120.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
12.000
|
$100.000
|
$110.000
|
$106.930
|
$110.000
|
$115.070
|
$120.750
|
$100.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
58.000
|
$25.000
|
$12.000
|
$12.220
|
$13.000
|
$26.300
|
$13.800
|
$13.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
150.000
|
$25.000
|
$18.000
|
$18.330
|
$19.000
|
$31.780
|
$20.700
|
$19.000
|
$35.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
14.000
|
$125.000
|
$66.000
|
$66.200
|
$66.000
|
$53.700
|
$74.750
|
$70.000
|
$140.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
6,690.000
|
$1.000
|
$1.520
|
$1.530
|
$1.550
|
$1.640
|
$1.730
|
$1.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
6,075.000
|
$1.250
|
$1.610
|
$1.450
|
$0.800
|
$2.010
|
$1.730
|
$0.700
|
$3.250
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
662.000
|
$0.500
|
$0.610
|
$0.810
|
$0.600
|
$0.660
|
$0.920
|
$0.500
|
$0.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
35.000
|
$6.000
|
$12.140
|
$6.110
|
$12.000
|
$13.150
|
$6.900
|
$25.000
|
$25.000
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
7,137.000
|
$0.200
|
$0.130
|
$0.120
|
$0.130
|
$0.140
|
$0.140
|
$0.130
|
$0.150
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
123,032.000
|
$0.200
|
$0.120
|
$0.120
|
$0.120
|
$0.130
|
$0.140
|
$0.130
|
$0.150
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
662.000
|
$0.500
|
$0.250
|
$0.450
|
$0.250
|
$0.270
|
$0.510
|
$0.260
|
$0.250
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
35.000
|
$3.000
|
$3.030
|
$4.070
|
$3.000
|
$3.290
|
$4.600
|
$0.130
|
$0.250
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
10,540.000
|
$0.100
|
$0.130
|
$0.120
|
$0.130
|
$0.140
|
$0.140
|
$0.130
|
$0.150
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
65,744.000
|
$0.150
|
$0.120
|
$0.120
|
$0.120
|
$0.130
|
$0.140
|
$0.130
|
$0.150
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
7,137.000
|
$0.400
|
$0.300
|
$0.310
|
$0.300
|
$0.330
|
$0.350
|
$0.260
|
$0.250
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
123,032.000
|
$0.400
|
$0.280
|
$0.290
|
$0.280
|
$0.310
|
$0.320
|
$0.260
|
$0.250
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
10,540.000
|
$0.400
|
$0.280
|
$0.310
|
$0.280
|
$0.310
|
$0.350
|
$0.260
|
$0.250
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
65,744.000
|
$0.400
|
$0.280
|
$0.290
|
$0.280
|
$0.310
|
$0.320
|
$0.260
|
$0.250
|
|
PREFAB PAV MRK TY C (W) (4") (DOT)
|
LF
|
420.000
|
$2.750
|
$2.020
|
$3.060
|
$2.000
|
$2.190
|
$3.450
|
$4.500
|
$4.600
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$200.000
|
$217.450
|
$241.360
|
$215.000
|
$235.620
|
$272.550
|
$250.000
|
$260.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$250.000
|
$278.140
|
$224.050
|
$275.000
|
$301.370
|
$253.000
|
$350.000
|
$360.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
335.000
|
$3.500
|
$4.000
|
$3.360
|
$3.500
|
$4.330
|
$3.800
|
$3.500
|
$3.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,891.000
|
$3.500
|
$3.690
|
$3.060
|
$3.500
|
$4.000
|
$3.450
|
$3.500
|
$3.500
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$5,300.000
|
$12,500.000
|
$10,163.520
|
$10,500.000
|
$10,936.870
|
$12,052.000
|
$10,000.000
|
$15,000.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
840.000
|
$105.000
|
$36.500
|
$36.660
|
$55.000
|
$115.070
|
$120.750
|
$40.000
|
$23.000
|
|
Totals: |
$8,659,019.850
|
$5,814,758.830
|
$6,436,978.650
|
$6,864,653.985
|
$6,947,899.730
|
$7,933,861.440
|
$7,965,827.990
|
$8,463,382.410
|