|
|
REMOVING CONC (PAV)
|
SY
|
2,499.000
|
$25.000
|
$12.000
|
$20.000
|
$104.610
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
667.000
|
$7.000
|
$10.000
|
$20.000
|
$28.880
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
578.000
|
$14.000
|
$20.000
|
$20.000
|
$34.190
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-14")
|
SY
|
136.000
|
$4.000
|
$12.000
|
$20.000
|
$84.040
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
2,064.000
|
$12.000
|
$15.000
|
$30.000
|
$42.670
|
|
|
CONC PVMT (CONT REINF - CRCP) (8")
|
SY
|
1,919.000
|
$85.000
|
$120.000
|
$110.000
|
$212.990
|
|
|
CURB (TYPE II)
|
LF
|
1,005.000
|
$50.000
|
$15.000
|
$25.000
|
$57.960
|
|
|
RIPRAP (MOW STRIP)(6 IN)
|
CY
|
1.250
|
$500.000
|
$1,200.000
|
$2,000.000
|
$3,178.840
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
34.000
|
$155.000
|
$150.000
|
$185.000
|
$230.850
|
|
|
CAST-IN-PLACE TRENCH DRAIN
|
LF
|
464.000
|
$280.000
|
$250.000
|
$300.000
|
$375.400
|
|
|
ADJUSTING MANHOLES
|
EA
|
4.000
|
$600.000
|
$800.000
|
$2,500.000
|
$2,881.860
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
5.000
|
$525.000
|
$500.000
|
$1,000.000
|
$1,176.340
|
|
|
ADJUSTING MANHOLES (ELECTRIC BOX)
|
EA
|
7.000
|
$650.000
|
$600.000
|
$650.000
|
$2,400.090
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$34,950.840
|
$50,000.000
|
$110,000.000
|
$357,616.450
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$2,500.000
|
$10,000.000
|
$8,500.000
|
$6,054.900
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
154.000
|
$6.000
|
$4.000
|
$18.000
|
$14.300
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
154.000
|
$2.500
|
$1.000
|
$9.000
|
$3.300
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
275.000
|
$95.000
|
$120.000
|
$200.000
|
$171.380
|
|
|
DRIVEWAYS (CONC)
|
SY
|
61.000
|
$95.000
|
$80.000
|
$100.000
|
$259.430
|
|
|
CONC SIDEWALKS (4")
|
SY
|
625.000
|
$80.000
|
$80.000
|
$70.000
|
$120.400
|
|
|
CURB RAMPS (TY 1)
|
EA
|
3.000
|
$1,850.000
|
$1,400.000
|
$2,500.000
|
$3,278.560
|
|
|
CURB RAMPS (TY 6)
|
EA
|
1.000
|
$1,800.000
|
$1,500.000
|
$2,500.000
|
$3,316.860
|
|
|
CURB RAMPS (TY 7)
|
EA
|
20.000
|
$1,755.000
|
$1,500.000
|
$2,500.000
|
$2,526.350
|
|
|
CURB RAMPS (TY 21)
|
EA
|
1.000
|
$2,800.000
|
$2,100.000
|
$2,500.000
|
$3,356.330
|
|
|
CONC MEDIAN(MONO NOSE)
|
SY
|
2.000
|
$250.000
|
$400.000
|
$200.000
|
$1,898.790
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
26.000
|
$775.000
|
$700.000
|
$850.000
|
$679.580
|
|
|
IN SM RD SN SUP&AM (INST SIGN ONLY)
|
EA
|
2.000
|
$150.000
|
$150.000
|
$650.000
|
$731.970
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$80.000
|
$100.000
|
$150.000
|
$181.970
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
9.000
|
$100.000
|
$100.000
|
$450.000
|
$101.350
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
141.000
|
$1.100
|
$1.000
|
$1.000
|
$2.300
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,060.000
|
$0.800
|
$1.000
|
$6.000
|
$1.700
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,622.000
|
$14.000
|
$6.000
|
$20.000
|
$6.700
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
45.000
|
$200.000
|
$150.000
|
$250.000
|
$168.770
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
24.000
|
$36.000
|
$50.000
|
$250.000
|
$48.710
|
|
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
|
EA
|
53.000
|
$125.000
|
$150.000
|
$250.000
|
$142.020
|
|
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
|
EA
|
53.000
|
$250.000
|
$100.000
|
$250.000
|
$307.020
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
109.000
|
$3.200
|
$3.000
|
$6.000
|
$4.860
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
450.000
|
$0.400
|
$0.500
|
$1.000
|
$1.150
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
7,261.000
|
$0.400
|
$0.500
|
$1.000
|
$0.790
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,320.000
|
$0.300
|
$0.500
|
$1.000
|
$0.900
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,230.000
|
$0.350
|
$0.500
|
$1.000
|
$0.800
|
|
REFL PAV MRKR TY I-C
|
EA
|
28.000
|
$3.000
|
$3.000
|
$15.000
|
$17.060
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
5.000
|
$2.750
|
$3.000
|
$15.000
|
$44.940
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
15,261.000
|
$0.100
|
$0.500
|
$1.000
|
$0.560
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,060.000
|
$0.150
|
$0.500
|
$1.000
|
$1.260
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
109.000
|
$0.400
|
$0.500
|
$1.000
|
$3.210
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,622.000
|
$1.250
|
$1.000
|
$1.000
|
$3.400
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
45.000
|
$17.500
|
$15.000
|
$100.000
|
$31.270
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
24.000
|
$3.500
|
$20.000
|
$100.000
|
$12.570
|
|
|
PAV SURF PREP FOR MRK (BIKE ARROW)
|
EA
|
53.000
|
$12.500
|
$5.000
|
$100.000
|
$25.200
|
|
|
PAV SURF PREP FOR MRK (BIKE SYMBOL)
|
EA
|
53.000
|
$9.000
|
$5.000
|
$100.000
|
$30.700
|
|
|
TREE PROTECTION
|
EA
|
12.000
|
$265.000
|
$250.000
|
$500.000
|
$548.290
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
|
CY
|
2.500
|
$300.000
|
$400.000
|
$1,000.000
|
$1,159.970
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
|
CY
|
2.500
|
$300.000
|
$400.000
|
$1,000.000
|
$1,159.970
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
240.000
|
$60.000
|
$90.000
|
$150.000
|
$92.140
|
|
|
TMA (STATIONARY)
|
DAY
|
120.000
|
$140.000
|
$200.000
|
$550.000
|
$470.720
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
32.000
|
$120.000
|
$50.000
|
$85.000
|
$109.300
|
|
|
FIRE HYDRANT RELOCATE & RECONNECT
|
EA
|
1.000
|
$2,600.000
|
$15,000.000
|
$10,000.000
|
$5,952.500
|
|
Totals: |
$767,307.590
|
$834,326.500
|
$1,164,156.000
|
$1,893,124.220
|