MIDLAND VARIOUS (0906-32-067)

Items: 69

County: MIDLAND
Length: 0.0000 MILES
Highway: VARIOUS
District: ODESSA
Control Number: 0906-32-067
DBE Goal: 0.0%
Project: STP 2025(749)TAPS
Guaranty: $45,000.00
Time: 142 WORKING DAYS
Engineer's Estimate: $2,157,806.94
Date: 08/06/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263221
Type: BICYCLE AND PEDESTRIAN IMPROVEMENTS
Project ID: A00206263
Contract Type: FEDERAL
Project Description: SHARED-USE PATH WITH ADA RAMPS, REFLECTIVE CROSSWALKS, SIGNAGE, LIGHTING AND PEDESTRIAN SAFETY INFRASTRUCTURE.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ODA-PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$2,157,806.94
$2,075,905.00
Over/Under Est: -3.8% -$81,901.94
$2,097,279.39
Over/Under Est: -2.81% -$60,527.55
Amt Left: 1.03% $21,374.39
Over/Under Est: 16.71% $360,531.66
Amt Left: 21.31% $442,433.60
Delta: -20.08% -$421,059.21
$3,223,207.94
Over/Under Est: 49.37% $1,065,401.00
Amt Left: 55.27% $1,147,302.94
Delta: -27.99% -$704,869.34
Over/Under Est: 49.79% $1,074,331.26
Amt Left: 55.7% $1,156,233.20
Delta: -0.28% -$8,930.26
$3,409,999.85
Over/Under Est: 58.03% $1,252,192.91
Amt Left: 64.27% $1,334,094.85
Delta: -5.50% -$177,861.65

Bid Items & Bid Tabulations

69 Total 0 of 69
MIDLAND  |  VARIOUS  |  ODESSA  |  0906-32-067  |  08/06/2026 1:00 PM CDT  |  $2,157,806.94  |  STP 2025(749)TAPS  |  BICYCLE AND PEDESTRIAN IMPRVS  |  142 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DELGADO'S CONTRACTORS, LLC
TI-ZACK CONCRETE, LLC
O. TREVINO CONSTRUCTION, LLC
REECE ALBERT, INC.
RAGLE CONSTRUCTION, INC.
DAN WILLIAMS COMPANY
PREPARING ROW
STA 28.000 $1,000.000 $750.000 $660.000 $7,144.000 $2,904.660 $11,500.000 $10,000.000
REMOV CONC (PAV)
SY 565.000 $45.000 $15.000 $28.250 $39.000 $114.410 $22.000 $50.000
REMOV CONC (DRIVEWAYS)
SY 905.000 $35.000 $25.000 $35.270 $28.000 $44.570 $22.000 $25.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 4,121.000 $30.000 $22.000 $29.050 $15.250 $18.340 $12.500 $17.000
REMOV CONC (CURB)
LF 94.000 $27.000 $8.000 $8.490 $5.000 $16.080 $6.500 $8.000
REMOV CONC (CURB & GUTTER)
LF 1,574.000 $9.000 $8.000 $10.140 $13.000 $25.290 $6.000 $5.000
REMOV CONC (FLUME)
SY 9.000 $40.000 $20.000 $88.670 $81.000 $55.970 $54.500 $70.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 162.000 $8.000 $10.000 $24.630 $28.000 $15.550 $30.000 $25.000
RMV (15") TRT/UNTRT BASE & ASPH PAV
SY 1,317.000 $13.000 $15.000 $30.300 $31.000 $20.370 $15.000 $17.000
EXCAV (ROADWAY)
CY 1,638.000 $25.000 $40.000 $48.720 $25.000 $57.950 $65.000 $55.000
EMBANK (FNL)(OC)(TY D)
CY 328.000 $30.000 $45.000 $2.430 $105.000 $138.050 $35.400 $35.000
DRILL SEED (PERM_URBAN_CLAY)
SY 7,454.000 $0.200 $1.000 $1.100 $1.650 $0.570 $1.500 $1.500
FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS)
CY 687.000 $100.000 $125.000 $90.690 $126.500 $167.620 $130.000 $200.000
CONC PVMT (CRCP) (8")
SY 453.000 $82.000 $120.000 $156.690 $200.000 $217.920 $147.000 $250.000
CL A CONC (MISC)
CY 8.000 $1,200.000 $700.000 $732.120 $900.000 $1,161.220 $1,500.000 $900.000
CL B CONC (FLUME)
CY 10.000 $1,250.000 $700.000 $732.120 $1,750.000 $2,319.280 $1,100.000 $1,500.000
RIPRAP (CONC)(6 IN)
CY 16.000 $600.000 $700.000 $732.120 $1,300.000 $2,345.280 $1,000.000 $900.000
GRATE & FRAME
EA 8.000 $1,750.000 $400.000 $1,212.450 $5,650.000 $4,255.920 $6,600.000 $6,000.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 10.000 $1,000.000 $1,000.000 $798.000 $1,000.000 $1,041.420 $1,200.000 $1,100.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 14.000 $1,073.000 $500.000 $570.000 $265.000 $1,029.920 $1,100.000 $1,100.000
ADJUSTING MANHOLES (WATER METER)
EA 2.000 $700.000 $500.000 $399.000 $265.000 $1,030.130 $1,100.000 $2,000.000
MOBILIZATION
LS 1.000 $120,858.040 $150,000.000 $60,682.480 $200,000.000 $286,716.560 $320,000.000 $330,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $12,500.000 $2,500.000 $4,400.000 $9,200.000 $15,333.840 $85,000.000 $30,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 143.000 $23.090 $100.000 $0.110 $180.000 $196.680 $55.000 $135.000
TMA (STATIONARY)
DAY 143.000 $255.010 $150.000 $0.110 $180.000 $206.270 $287.000 $195.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 46.000 $85.000 $45.000 $0.110 $110.000 $31.260 $100.000 $120.000
ROCK FILTER DAMS (REMOVE)
LF 46.000 $12.500 $10.000 $0.110 $44.000 $9.840 $40.000 $33.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 167.000 $25.000 $35.000 $0.110 $50.000 $21.920 $45.000 $36.900
CONSTRUCTION EXITS (REMOVE)
SY 167.000 $7.000 $5.000 $0.110 $11.000 $9.470 $10.000 $19.350
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,215.000 $3.800 $7.000 $0.110 $5.500 $8.910 $5.000 $4.300
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,215.000 $1.020 $1.000 $0.110 $1.700 $5.700 $1.550 $1.500
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 882.000 $2.000 $7.000 $0.110 $8.500 $7.970 $7.500 $5.050
BIODEG EROSN CONT LOGS (REMOVE)
LF 882.000 $1.500 $2.000 $0.110 $2.250 $4.240 $2.000 $1.000
LANDSCAPE PAVERS
SY 44.000 $130.000 $90.000 $137.500 $155.000 $19.970 $176.000 $175.000
CONC CURB & GUTTER (TY II)
LF 1,659.000 $70.000 $40.000 $53.990 $50.000 $45.510 $33.000 $45.000
CONC CURB (TY C1)
LF 248.000 $130.000 $40.000 $96.260 $17.000 $122.970 $136.000 $95.000
DRIVEWAYS (CONC) (HES)
SY 1,176.000 $125.000 $120.000 $131.910 $140.000 $167.820 $117.000 $150.000
CONC SIDEWALKS (4")
SY 96.000 $74.000 $85.000 $113.720 $147.000 $173.600 $67.500 $120.000
CONC SIDEWALKS (6")
SY 8,509.000 $95.000 $100.000 $109.820 $80.000 $129.020 $78.750 $141.000
CURB RAMPS (TY 1)
EA 4.000 $3,000.000 $2,500.000 $2,098.630 $4,500.000 $3,035.950 $2,000.000 $3,000.000
CURB RAMPS (TY 2)
EA 4.000 $3,600.000 $2,500.000 $2,098.630 $4,500.000 $3,892.440 $2,100.000 $3,000.000
CURB RAMPS (TY 7)
EA 29.000 $2,600.000 $2,500.000 $2,098.630 $4,700.000 $3,587.700 $2,120.000 $3,000.000
CURB RAMPS (TY 10)
EA 17.000 $2,600.000 $2,500.000 $2,098.630 $4,350.000 $3,898.650 $2,700.000 $3,000.000
CURB RAMPS (TY 21)
EA 3.000 $3,800.000 $2,500.000 $2,098.630 $4,900.000 $4,464.260 $3,400.000 $3,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 24.000 $785.000 $900.000 $440.000 $1,000.000 $1,155.770 $868.000 $875.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 1.000 $395.000 $900.000 $440.000 $400.000 $456.720 $343.000 $345.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 7.000 $700.000 $900.000 $440.000 $900.000 $993.330 $746.000 $750.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 1.000 $600.000 $900.000 $440.000 $160.000 $179.750 $135.000 $135.000
REMOVE SM RD SN SUP&AM
EA 8.000 $120.000 $500.000 $55.000 $110.000 $251.620 $150.000 $160.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 24.000 $1.200 $6.000 $5.500 $5.500 $6.660 $5.000 $5.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 141.000 $1.300 $6.000 $5.500 $5.500 $6.660 $5.000 $5.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 161.000 $8.000 $11.000 $11.000 $11.000 $13.320 $10.000 $10.000
REFL PAV MRK TY I (W)4"(SLD)(100MIL)
LF 55.000 $0.400 $6.000 $5.500 $5.500 $6.660 $5.000 $5.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 1,977.000 $0.750 $6.000 $5.500 $5.500 $6.660 $5.000 $5.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 1,919.000 $0.550 $6.000 $5.500 $5.500 $6.660 $5.000 $5.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 700.000 $0.700 $6.000 $5.500 $5.500 $6.660 $5.000 $5.000
PREFAB PM TY C (W)(24")(SLD)
LF 1,087.000 $14.000 $20.000 $17.500 $19.000 $23.300 $17.500 $17.500
PREFAB PM TY C (W)(ARROW)
EA 1.000 $350.000 $3,330.000 $330.000 $326.500 $399.460 $300.000 $300.000
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 2.000 $600.000 $600.000 $605.000 $600.000 $732.350 $550.000 $550.000
PREFAB PM TY C (W)(WORD)
EA 1.000 $500.000 $450.000 $467.500 $463.000 $565.910 $425.000 $425.000
PREFAB PM TY C (W)(SYMBOL)
EA 6.000 $500.000 $350.000 $385.000 $380.000 $466.040 $350.000 $350.000
PREFAB PM TY C (W)(BIKE SYMBOL)
EA 6.000 $500.000 $400.000 $440.000 $435.000 $532.610 $400.000 $400.000
REFL PAV MRKR TY II-A-A
EA 68.000 $4.000 $22.000 $22.000 $21.000 $26.630 $20.000 $20.000
ELIM EXT PM & MRKS (6")
LF 40.000 $0.500 $60.000 $5.500 $5.500 $6.660 $5.000 $5.000
ELIM EXT PM & MRKS (24")
LF 112.000 $4.000 $8.000 $8.250 $8.000 $9.990 $7.500 $7.500
PAV SURF PREP FOR MRK (6")
LF 1,977.000 $0.600 $4.000 $3.850 $3.750 $4.660 $3.500 $3.500
TREE REMOVAL (4" - 12" DIA)
EA 8.000 $400.000 $250.000 $715.000 $1,350.000 $724.590 $500.000 $400.000
TREE REMOVAL (12" - 18" DIA)
EA 2.000 $700.000 $350.000 $1,375.000 $3,700.000 $874.390 $1,200.000 $450.000
REMOVABLE BOLLARD
EA 43.000 $1,000.000 $750.000 $1,100.000 $1,150.000 $1,945.000 $1,400.000 $1,000.000
Totals: $2,157,806.940 $2,075,905.000 $2,097,279.390 $2,518,338.600 $3,223,207.940 $3,232,138.200 $3,409,999.850
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $55,000.00