|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
1,640.000
|
$15.000
|
$15.000
|
$15.190
|
$14.900
|
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
21,016.000
|
$11.000
|
$9.800
|
$11.620
|
$13.950
|
|
|
|
REMOVING STAB BASE AND ASPH PAV (13")
|
SY
|
17,166.000
|
$18.000
|
$12.730
|
$19.000
|
$16.700
|
|
|
|
REMOVE STAB BASE & ASPH PAV (6.5")
|
SY
|
52,224.000
|
$11.000
|
$7.060
|
$8.870
|
$11.550
|
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
8.000
|
$1,700.000
|
$3,455.000
|
$3,484.290
|
$8,390.000
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
1,280.000
|
$45.000
|
$35.000
|
$59.680
|
$24.800
|
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
73,240.000
|
$3.000
|
$1.850
|
$3.280
|
$1.350
|
|
|
|
PRIME COAT (AE-P)
|
GAL
|
18,089.000
|
$4.750
|
$5.120
|
$7.840
|
$3.850
|
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
27,846.000
|
$4.820
|
$5.450
|
$5.820
|
$6.050
|
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
677.000
|
$250.000
|
$265.000
|
$355.940
|
$373.550
|
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
17,166.000
|
$170.000
|
$202.400
|
$211.200
|
$225.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$978,756.660
|
$625,000.000
|
$1,165,680.010
|
$1,941,510.620
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$30,000.000
|
$35,000.000
|
$18,370.000
|
$30,000.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,314.000
|
$13.000
|
$15.000
|
$11.860
|
$22.750
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,314.000
|
$2.000
|
$5.000
|
$4.590
|
$17.700
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,640.000
|
$30.000
|
$66.700
|
$69.600
|
$63.800
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
44.000
|
$920.000
|
$836.050
|
$948.000
|
$799.700
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
23.000
|
$1,104.000
|
$989.000
|
$972.000
|
$946.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
12.000
|
$1,200.000
|
$1,179.900
|
$984.000
|
$1,128.600
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
5.000
|
$2,000.000
|
$1,419.100
|
$1,320.000
|
$1,357.700
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
2.000
|
$1,400.000
|
$1,528.350
|
$1,320.000
|
$1,461.900
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
93.000
|
$165.000
|
$125.000
|
$120.000
|
$285.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
13.000
|
$93.000
|
$93.150
|
$90.000
|
$89.100
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
25,529.000
|
$0.400
|
$0.120
|
$0.120
|
$0.500
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
98,961.000
|
$0.280
|
$0.490
|
$0.520
|
$0.440
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
3,542.000
|
$0.500
|
$0.120
|
$0.120
|
$0.470
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
76,755.000
|
$0.400
|
$0.400
|
$0.420
|
$0.440
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,915.000
|
$2.690
|
$3.000
|
$4.510
|
$2.700
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
7,676.000
|
$2.500
|
$3.000
|
$6.370
|
$2.600
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
7,490.000
|
$1.130
|
$1.210
|
$1.260
|
$1.300
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
925.000
|
$2.400
|
$4.600
|
$4.800
|
$7.700
|
|
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
900.000
|
$3.000
|
$4.600
|
$4.800
|
$7.700
|
|
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
3,963.000
|
$1.100
|
$1.090
|
$1.140
|
$1.060
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
20,150.000
|
$0.900
|
$0.980
|
$1.020
|
$0.990
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
850.000
|
$0.980
|
$1.090
|
$1.140
|
$1.060
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
24,433.000
|
$0.850
|
$0.980
|
$1.020
|
$0.940
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
256.000
|
$23.000
|
$18.400
|
$19.200
|
$19.250
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
26.000
|
$310.000
|
$345.000
|
$360.000
|
$275.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
26.000
|
$395.000
|
$437.000
|
$456.000
|
$385.000
|
|
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
48.000
|
$26.000
|
$36.800
|
$38.400
|
$82.500
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
200.000
|
$5.150
|
$4.030
|
$4.200
|
$6.600
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
800.000
|
$4.000
|
$4.030
|
$4.200
|
$6.600
|
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
13,282.000
|
$0.500
|
$0.980
|
$1.020
|
$0.500
|
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,015.000
|
$0.900
|
$0.980
|
$1.020
|
$0.540
|
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,170.000
|
$1.200
|
$3.450
|
$3.600
|
$5.500
|
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
240.000
|
$3.750
|
$5.750
|
$6.000
|
$12.100
|
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
23,040.000
|
$135.000
|
$130.000
|
$188.000
|
$181.000
|
|
|
|
TACK COAT
|
GAL
|
1,684.000
|
$6.000
|
$5.420
|
$25.000
|
$3.850
|
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
6,052.000
|
$300.000
|
$175.000
|
$0.000
|
$0.000
|
|
|
|
BONDING COURSE
|
GAL
|
5,870.000
|
$4.250
|
$5.000
|
$7.250
|
$11.350
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$24,000.000
|
$21,000.000
|
$12,000.000
|
$24,285.000
|
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
4.000
|
$10,800.000
|
$9,000.000
|
$9,500.420
|
$15,900.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
350.000
|
$180.000
|
$150.000
|
$417.380
|
$492.800
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
60.000
|
$99.000
|
$102.000
|
$603.230
|
$106.250
|
|
1
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
6,052.000
|
$300.000
|
$0.000
|
$225.000
|
$257.450
|
|
Totals: |
$13,439,411.210
|
$10,681,716.810
|
$13,500,000.000
|
$14,712,824.000
|