|
|
REMOVING CONC (MEDIANS)
|
SY
|
347.000
|
$50.000
|
$54.000
|
|
|
REMOVE STAB BASE & ASPH PAV (5IN)
|
SY
|
347.000
|
$5.000
|
$20.500
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
3.000
|
$1,000.000
|
$1,700.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
146.000
|
$50.000
|
$62.000
|
|
|
BLADING
|
HR
|
2.000
|
$100.000
|
$297.000
|
|
|
PROOF ROLLING
|
HR
|
5.000
|
$100.000
|
$122.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
596.000
|
$6.000
|
$7.000
|
|
|
ASPH (AC-20XP)
|
GAL
|
8,880.000
|
$5.000
|
$3.900
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
202.000
|
$100.000
|
$285.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
|
TON
|
10,367.000
|
$200.000
|
$163.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
8,500.000
|
$70.000
|
$50.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
8,500.000
|
$50.000
|
$26.000
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
40,248.000
|
$3.500
|
$4.500
|
|
|
PLANE ASPH CONC PAV (6")
|
SY
|
12,301.000
|
$12.000
|
$9.250
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$400,000.000
|
$365,000.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
6.000
|
$4,000.000
|
$8,900.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$10,000.000
|
$60,000.000
|
|
|
BARR, SIGNS, TRAFFIC HANDLING
|
EA
|
6.000
|
$4,000.000
|
$3,000.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
612.000
|
$50.000
|
$62.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$800.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
4.000
|
$800.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$900.000
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
17.000
|
$100.000
|
$80.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
7.000
|
$25.000
|
$50.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,060.000
|
$2.000
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
313.000
|
$2.000
|
$2.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,329.000
|
$1.000
|
$2.100
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
496.000
|
$2.500
|
$5.500
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
15.000
|
$1.000
|
$16.500
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
6,649.000
|
$0.500
|
$2.250
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
33,266.000
|
$0.500
|
$1.250
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
423.000
|
$0.500
|
$1.600
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
9,505.000
|
$0.500
|
$1.600
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
904.000
|
$15.000
|
$30.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
16.000
|
$250.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
10.000
|
$275.000
|
$480.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
147.000
|
$4.000
|
$5.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
402.000
|
$4.000
|
$5.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
140.000
|
$50.000
|
$75.000
|
|
|
TMA (STATIONARY)
|
EA
|
3.000
|
$12,000.000
|
$12,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
192.000
|
$75.000
|
$105.000
|
|
Totals: |
$4,122,773.500
|
$3,690,711.000
|