PREPARING ROW
|
STA
|
131.000
|
$1,800.000
|
$500.000
|
$472.000
|
$2,000.000
|
$2,650.000
|
$1,640.000
|
$5,000.000
|
$4,198.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
344.000
|
$10.000
|
$25.000
|
$83.600
|
$31.000
|
$14.000
|
$22.000
|
$20.000
|
$20.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
61.000
|
$20.000
|
$25.000
|
$16.000
|
$34.200
|
$14.000
|
$15.000
|
$20.000
|
$20.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
3,655.000
|
$28.500
|
$10.000
|
$13.400
|
$17.600
|
$8.000
|
$8.500
|
$20.000
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
2,629.000
|
$20.000
|
$10.000
|
$16.750
|
$21.100
|
$9.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
10,522.000
|
$11.500
|
$7.000
|
$8.500
|
$7.000
|
$4.500
|
$7.000
|
$10.000
|
$12.500
|
|
|
REMOVING CONC (WHEELCHAIR RAMP)
|
SY
|
137.000
|
$25.000
|
$10.000
|
$16.500
|
$21.100
|
$14.000
|
$16.000
|
$20.000
|
$20.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
22.000
|
$15.000
|
$25.000
|
$41.000
|
$17.600
|
$14.000
|
$16.000
|
$20.000
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
2,382.000
|
$4.000
|
$5.500
|
$10.750
|
$34.600
|
$6.750
|
$7.000
|
$5.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
8,458.000
|
$13.000
|
$14.000
|
$10.200
|
$13.000
|
$20.000
|
$9.000
|
$20.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
4,565.000
|
$7.000
|
$14.000
|
$31.800
|
$6.000
|
$18.000
|
$40.000
|
$8.000
|
$25.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
5,662.000
|
$1.500
|
$2.000
|
$9.300
|
$7.000
|
$3.500
|
$5.920
|
$1.000
|
$6.000
|
|
|
BLOCK SODDING
|
SY
|
5,662.000
|
$7.000
|
$5.500
|
$6.000
|
$4.250
|
$8.250
|
$6.500
|
$4.000
|
$5.000
|
|
|
VEGETATIVE WATERING
|
MG
|
57.000
|
$12.000
|
$50.000
|
$60.000
|
$188.000
|
$200.000
|
$71.560
|
$10.000
|
$100.000
|
|
|
PROOF ROLLING
|
HR
|
104.000
|
$95.000
|
$90.000
|
$64.000
|
$117.000
|
$98.000
|
$110.000
|
$50.000
|
$150.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
1,150.000
|
$55.000
|
$72.000
|
$168.000
|
$126.000
|
$77.000
|
$175.000
|
$80.000
|
$60.000
|
|
|
CEMENT
|
TON
|
0.400
|
$180.000
|
$500.000
|
$1,200.000
|
$444.000
|
$1,000.000
|
$420.000
|
$200.000
|
$2,500.000
|
|
|
CEMENT TREAT (NEW BASE) (10")
|
SY
|
604.000
|
$4.000
|
$9.000
|
$9.500
|
$26.000
|
$28.000
|
$75.000
|
$4.000
|
$20.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
82,704.000
|
$3.000
|
$2.000
|
$1.110
|
$2.500
|
$1.750
|
$1.700
|
$2.000
|
$5.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (6")
|
SY
|
2,402.000
|
$93.000
|
$70.000
|
$72.250
|
$90.000
|
$65.000
|
$82.000
|
$100.000
|
$85.000
|
|
|
CONC PVMT (JOINTED-CPCD)(HES)(10")
|
SY
|
642.000
|
$150.000
|
$175.000
|
$160.500
|
$175.000
|
$93.000
|
$120.000
|
$100.000
|
$100.000
|
|
|
CEM STABIL BKFL
|
CY
|
279.000
|
$120.000
|
$115.000
|
$95.500
|
$86.000
|
$72.000
|
$125.000
|
$120.000
|
$350.000
|
|
|
CUT & RESTORING PAV
|
SY
|
301.000
|
$95.000
|
$40.000
|
$113.000
|
$104.000
|
$86.000
|
$150.000
|
$100.000
|
$100.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
245.000
|
$2.500
|
$5.000
|
$12.000
|
$29.000
|
$2.000
|
$12.000
|
$5.000
|
$10.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
11.000
|
$388.000
|
$550.000
|
$472.000
|
$840.000
|
$500.000
|
$450.000
|
$500.000
|
$550.000
|
|
|
RIPRAP (STONE TY R)(DRY)(12 IN)
|
CY
|
24.000
|
$205.000
|
$160.000
|
$170.000
|
$92.000
|
$200.000
|
$100.000
|
$200.000
|
$185.000
|
|
|
RAIL (HANDRAIL)(TY A)
|
LF
|
881.000
|
$225.000
|
$190.000
|
$215.600
|
$155.000
|
$200.000
|
$175.000
|
$150.000
|
$185.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
273.000
|
$400.000
|
$475.000
|
$367.000
|
$500.000
|
$400.000
|
$450.000
|
$400.000
|
$850.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
809.000
|
$60.000
|
$60.000
|
$53.000
|
$75.000
|
$61.000
|
$50.000
|
$80.000
|
$85.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
593.000
|
$80.000
|
$90.000
|
$68.000
|
$85.000
|
$70.000
|
$94.000
|
$80.000
|
$105.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
114.000
|
$125.000
|
$110.000
|
$92.000
|
$120.000
|
$97.000
|
$125.000
|
$100.000
|
$115.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
3.000
|
$4,500.000
|
$4,700.000
|
$3,260.000
|
$4,000.000
|
$5,000.000
|
$4,500.000
|
$4,000.000
|
$8,500.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
1.000
|
$4,250.000
|
$4,100.000
|
$3,700.000
|
$5,500.000
|
$5,000.000
|
$4,000.000
|
$4,000.000
|
$8,500.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
2.000
|
$5,000.000
|
$5,000.000
|
$4,470.000
|
$4,250.000
|
$5,000.000
|
$6,000.000
|
$5,000.000
|
$8,500.000
|
|
|
INLET (COMPL)(CURB)(TY 2)(5')
|
EA
|
1.000
|
$4,000.000
|
$6,100.000
|
$3,500.000
|
$5,000.000
|
$4,000.000
|
$4,500.000
|
$9,000.000
|
$8,500.000
|
|
|
INLET (COMPL)(CURB)(TY 1)(10')
|
EA
|
7.000
|
$4,800.000
|
$8,100.000
|
$4,535.000
|
$5,600.000
|
$4,000.000
|
$4,500.000
|
$5,000.000
|
$8,500.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
7.000
|
$6,300.000
|
$5,500.000
|
$12,000.000
|
$7,500.000
|
$4,000.000
|
$5,000.000
|
$6,999.000
|
$22,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
44.000
|
$850.000
|
$1,200.000
|
$732.000
|
$1,000.000
|
$1,000.000
|
$850.000
|
$900.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,200.000
|
$1,400.000
|
$1,000.000
|
$1,100.000
|
$2,000.000
|
$950.000
|
$1,200.000
|
$2,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$2,600.000
|
$1,800.000
|
$1,400.000
|
$1,300.000
|
$2,000.000
|
$2,500.000
|
$2,000.000
|
$3,500.000
|
|
|
GRATE & FRAME
|
EA
|
1.000
|
$1,000.000
|
$4,500.000
|
$1,850.000
|
$200.000
|
$2,250.000
|
$1,000.000
|
$1,500.000
|
$6,500.000
|
|
|
CAST-IN-PLACE TRENCH DRAIN
|
LF
|
481.000
|
$300.000
|
$250.000
|
$200.000
|
$480.000
|
$350.000
|
$400.000
|
$360.000
|
$2,000.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
2.000
|
$1,500.000
|
$1,400.000
|
$875.000
|
$350.000
|
$2,000.000
|
$1,500.000
|
$1,200.000
|
$2,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
21.000
|
$1,200.000
|
$625.000
|
$1,170.000
|
$425.000
|
$900.000
|
$750.000
|
$800.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,582.000
|
$18.000
|
$10.000
|
$22.000
|
$14.000
|
$30.000
|
$30.000
|
$20.000
|
$30.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
200.000
|
$65.000
|
$50.000
|
$26.500
|
$25.000
|
$58.000
|
$150.000
|
$50.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$500,000.000
|
$440,000.000
|
$241,300.000
|
$522,900.000
|
$440,000.000
|
$560,000.000
|
$500,000.000
|
$800,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$5,000.000
|
$2,500.000
|
$6,100.000
|
$960.000
|
$20,000.000
|
$10,000.000
|
$9,999.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
274.000
|
$50.000
|
$25.000
|
$32.000
|
$0.100
|
$41.000
|
$35.000
|
$50.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
274.000
|
$10.000
|
$5.000
|
$15.000
|
$0.100
|
$20.000
|
$7.000
|
$10.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,460.000
|
$4.000
|
$3.000
|
$4.790
|
$0.100
|
$5.750
|
$3.000
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,460.000
|
$1.000
|
$0.500
|
$1.600
|
$0.100
|
$2.000
|
$1.000
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
210.000
|
$10.000
|
$7.000
|
$4.790
|
$0.100
|
$8.000
|
$6.000
|
$5.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
210.000
|
$1.000
|
$1.000
|
$1.600
|
$0.100
|
$0.750
|
$1.000
|
$1.000
|
$9.000
|
|
|
SANDBAGS FOR EROSION CONTROL (8")
|
LF
|
176.000
|
$10.000
|
$6.000
|
$11.000
|
$0.100
|
$19.000
|
$6.000
|
$5.000
|
$10.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
336.000
|
$6.000
|
$3.000
|
$6.380
|
$0.100
|
$10.000
|
$13.000
|
$6.000
|
$10.000
|
|
|
COLORED TEXTURED CONC (6")
|
SY
|
153.000
|
$90.000
|
$100.000
|
$255.500
|
$145.000
|
$200.000
|
$140.000
|
$120.000
|
$125.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
13,063.000
|
$24.000
|
$20.000
|
$18.720
|
$22.000
|
$15.000
|
$25.000
|
$25.000
|
$35.000
|
|
|
CONCRETE GUTTER (MODIFIED)
|
LF
|
493.000
|
$70.000
|
$40.000
|
$48.000
|
$34.600
|
$48.000
|
$20.000
|
$40.000
|
$65.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
611.000
|
$20.000
|
$20.000
|
$29.000
|
$13.000
|
$14.000
|
$106.840
|
$100.000
|
$35.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
2,758.000
|
$97.000
|
$85.000
|
$67.000
|
$80.000
|
$78.000
|
$120.000
|
$120.000
|
$95.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
6,203.000
|
$65.000
|
$55.000
|
$67.860
|
$80.000
|
$58.000
|
$80.000
|
$75.000
|
$60.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
43.000
|
$2,500.000
|
$2,000.000
|
$1,560.000
|
$1,360.000
|
$2,000.000
|
$2,000.000
|
$1,500.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
1.000
|
$2,750.000
|
$3,000.000
|
$1,800.000
|
$1,360.000
|
$2,000.000
|
$2,500.000
|
$2,000.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
7.000
|
$2,500.000
|
$2,000.000
|
$1,560.000
|
$1,360.000
|
$2,000.000
|
$2,500.000
|
$1,600.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
2.000
|
$1,800.000
|
$1,800.000
|
$1,560.000
|
$1,360.000
|
$2,000.000
|
$2,500.000
|
$1,600.000
|
$2,500.000
|
|
|
CONC SIDEWALK (SPECIAL)(RETAINING WALL)
|
SF
|
263.000
|
$100.000
|
$60.000
|
$125.000
|
$51.000
|
$65.000
|
$150.000
|
$100.000
|
$125.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,786.000
|
$12.000
|
$10.000
|
$16.590
|
$10.000
|
$8.000
|
$10.000
|
$10.000
|
$15.000
|
|
|
GROUND BOX TY A (122311)
|
EA
|
13.000
|
$750.000
|
$1,000.000
|
$617.000
|
$825.000
|
$1,000.000
|
$800.000
|
$80.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
49.000
|
$500.000
|
$600.000
|
$429.000
|
$450.000
|
$500.000
|
$595.000
|
$500.000
|
$850.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
34.000
|
$90.000
|
$100.000
|
$91.000
|
$96.000
|
$100.000
|
$80.000
|
$50.000
|
$250.000
|
|
|
INSTL OM ASSM (OM-3L)(FLX)SRF
|
EA
|
20.000
|
$210.000
|
$250.000
|
$83.000
|
$255.000
|
$97.000
|
$245.000
|
$200.000
|
$100.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
14,727.000
|
$1.000
|
$0.600
|
$0.690
|
$1.000
|
$1.250
|
$0.550
|
$3.000
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
24,630.000
|
$0.900
|
$0.600
|
$0.690
|
$1.200
|
$1.500
|
$0.550
|
$3.000
|
$0.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
503.000
|
$0.750
|
$1.000
|
$1.000
|
$1.100
|
$0.500
|
$1.290
|
$2.000
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,750.000
|
$0.900
|
$1.000
|
$1.000
|
$0.910
|
$0.500
|
$1.290
|
$2.000
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,936.000
|
$0.900
|
$0.700
|
$0.790
|
$1.000
|
$1.250
|
$0.680
|
$1.000
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,775.000
|
$7.250
|
$6.500
|
$5.740
|
$7.950
|
$10.000
|
$6.000
|
$1.000
|
$20.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,998.000
|
$0.900
|
$0.350
|
$0.450
|
$0.410
|
$0.500
|
$0.310
|
$1.000
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
13,771.000
|
$0.600
|
$0.350
|
$0.430
|
$0.560
|
$0.750
|
$0.310
|
$1.000
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
17,849.000
|
$0.750
|
$0.350
|
$0.430
|
$0.420
|
$0.500
|
$0.310
|
$1.000
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
24,232.000
|
$0.750
|
$0.300
|
$0.430
|
$0.410
|
$0.500
|
$0.310
|
$1.000
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
41.000
|
$205.000
|
$280.000
|
$213.000
|
$220.000
|
$300.000
|
$275.000
|
$250.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
1.000
|
$400.000
|
$350.000
|
$390.000
|
$315.000
|
$400.000
|
$345.000
|
$400.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
19.000
|
$260.000
|
$310.000
|
$227.000
|
$275.000
|
$300.000
|
$299.000
|
$300.000
|
$250.000
|
|
PRE PM TY C (ACC PRK)(WHT)(SYMBL ONLY)
|
EA
|
1.000
|
$300.000
|
$550.000
|
$507.000
|
$570.000
|
$700.000
|
$500.000
|
$400.000
|
$500.000
|
|
PLOWABLE REFL PAV MRKR TY I-C
|
EA
|
94.000
|
$3.500
|
$11.000
|
$21.270
|
$5.450
|
$6.750
|
$10.000
|
$20.000
|
$5.000
|
|
PLOWABLE REFL PAV MRKR TY II-A-A
|
EA
|
705.000
|
$6.500
|
$11.000
|
$4.250
|
$3.500
|
$4.250
|
$10.000
|
$20.000
|
$5.000
|
|
PLOWABLE REFL PAV MRKR TY II-C-R
|
EA
|
39.000
|
$3.500
|
$11.000
|
$21.270
|
$5.450
|
$6.750
|
$10.000
|
$20.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
8,201.000
|
$0.500
|
$0.600
|
$0.500
|
$1.100
|
$1.250
|
$0.500
|
$1.000
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
662.000
|
$1.250
|
$0.900
|
$1.280
|
$2.200
|
$2.750
|
$0.800
|
$1.000
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
6.000
|
$50.000
|
$20.000
|
$58.500
|
$90.000
|
$100.000
|
$15.000
|
$100.000
|
$250.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
4.000
|
$65.000
|
$30.000
|
$84.000
|
$95.000
|
$100.000
|
$25.000
|
$175.000
|
$250.000
|
|
|
LANDSCAPE AMENITY
|
EA
|
1.000
|
$10,800.000
|
$60,000.000
|
$81,400.000
|
$51,000.000
|
$80,000.000
|
$72,000.000
|
$400,000.000
|
$200,000.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
199.000
|
$100.000
|
$120.000
|
$137.000
|
$182.000
|
$170.000
|
$230.000
|
$130.000
|
$110.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
7,781.000
|
$110.000
|
$80.000
|
$85.650
|
$107.000
|
$99.000
|
$130.000
|
$140.000
|
$110.000
|
|
|
BONDING COURSE
|
GAL
|
14,329.000
|
$5.500
|
$3.500
|
$3.000
|
$2.850
|
$12.000
|
$4.000
|
$6.000
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
120.000
|
$150.000
|
$100.000
|
$80.000
|
$15.000
|
$59.000
|
$90.000
|
$100.000
|
$150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$8,000.000
|
$10,000.000
|
$2,100.000
|
$1,000.000
|
$14,500.000
|
$8,600.000
|
$12,500.000
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
270.000
|
$325.000
|
$200.000
|
$300.000
|
$1.000
|
$300.000
|
$260.000
|
$250.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
270.000
|
$300.000
|
$250.000
|
$65.000
|
$1.000
|
$300.000
|
$260.000
|
$250.000
|
$450.000
|
|
|
FIRE HYDRANT RELOCATE & RECONNECT
|
EA
|
5.000
|
$9,500.000
|
$6,500.000
|
$3,520.000
|
$2,300.000
|
$5,000.000
|
$5,000.000
|
$20,000.000
|
$2,500.000
|
|
|
SAN SEWER PIPE (PVC)(SDR-35)(6")
|
LF
|
106.000
|
$80.000
|
$100.000
|
$200.000
|
$80.000
|
$100.000
|
$250.000
|
$300.000
|
$85.000
|
|
|
ADJUST AND/OR RELOCATE WATER METER BOX
|
EA
|
20.000
|
$400.000
|
$1,200.000
|
$820.000
|
$350.000
|
$900.000
|
$750.000
|
$2,500.000
|
$750.000
|
|
Totals: |
$5,504,346.450
|
$4,509,031.700
|
$4,589,986.950
|
$5,249,100.290
|
$5,480,961.250
|
$6,095,347.300
|
$6,875,635.000
|
$8,182,712.000
|