PREPARING ROW
|
STA
|
87.100
|
$2,000.000
|
$302.000
|
$200.000
|
$200.000
|
$873.110
|
$400.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,342.000
|
$7.000
|
$5.720
|
$10.000
|
$20.000
|
$12.590
|
$12.000
|
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
87.100
|
$480.000
|
$388.000
|
$400.000
|
$600.000
|
$561.970
|
$870.000
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
19,354.000
|
$1.000
|
$0.430
|
$1.000
|
$1.250
|
$1.530
|
$2.050
|
|
|
|
BLOCK SODDING
|
SY
|
190.000
|
$3.150
|
$5.320
|
$5.000
|
$5.000
|
$8.930
|
$5.600
|
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
19,354.000
|
$0.130
|
$0.130
|
$0.120
|
$0.120
|
$0.150
|
$0.140
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
9,677.000
|
$0.100
|
$0.130
|
$0.120
|
$0.120
|
$0.120
|
$0.140
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
9,677.000
|
$0.100
|
$0.130
|
$0.120
|
$0.120
|
$0.120
|
$0.140
|
|
|
|
VEGETATIVE WATERING
|
MG
|
193.500
|
$14.000
|
$21.000
|
$15.000
|
$20.000
|
$47.690
|
$120.000
|
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
78.000
|
$33.000
|
$66.000
|
$75.000
|
$65.000
|
$67.340
|
$108.000
|
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
27,251.000
|
$10.900
|
$13.000
|
$14.000
|
$16.050
|
$13.100
|
$13.500
|
|
|
|
REWORK BS MTL (TY B) (6") (ORD COMP)
|
SY
|
23,342.000
|
$1.800
|
$3.300
|
$2.750
|
$1.500
|
$4.750
|
$4.500
|
|
|
|
CEMENT
|
TON
|
558.000
|
$149.000
|
$148.000
|
$140.000
|
$175.000
|
$161.690
|
$145.000
|
|
|
|
CEMENT TREAT (EXIST MATL)(DC)(12")
|
SY
|
33,031.000
|
$4.000
|
$1.400
|
$1.500
|
$1.250
|
$2.430
|
$3.000
|
|
|
|
ASPH (RC-250)
|
GAL
|
8,251.000
|
$4.000
|
$3.600
|
$3.750
|
$3.850
|
$4.660
|
$4.500
|
|
|
|
ASPH (SPG 73-19)
|
GAL
|
10,344.000
|
$2.400
|
$3.130
|
$3.250
|
$3.400
|
$3.620
|
$4.250
|
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
244.000
|
$105.000
|
$148.000
|
$90.000
|
$65.000
|
$146.970
|
$120.000
|
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
218.000
|
$105.000
|
$131.300
|
$110.000
|
$100.500
|
$183.780
|
$160.000
|
|
|
|
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
|
TON
|
142.000
|
$100.000
|
$160.000
|
$125.000
|
$150.000
|
$190.100
|
$222.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
22.200
|
$65.000
|
$0.000
|
$0.000
|
$0.000
|
$177.770
|
$65.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
29.200
|
$65.000
|
$143.000
|
$200.000
|
$135.000
|
$177.770
|
$65.000
|
|
|
|
CUT & RESTORING PAV
|
SY
|
25.000
|
$90.000
|
$172.000
|
$100.000
|
$150.000
|
$220.410
|
$120.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
49.000
|
$415.000
|
$584.000
|
$450.000
|
$550.000
|
$522.570
|
$550.000
|
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
2.000
|
$55.000
|
$212.000
|
$250.000
|
$200.000
|
$336.740
|
$450.000
|
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
12.000
|
$430.000
|
$515.000
|
$700.000
|
$485.000
|
$1,179.980
|
$835.000
|
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
8.000
|
$510.000
|
$600.000
|
$750.000
|
$565.000
|
$1,617.360
|
$850.000
|
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
12.000
|
$570.000
|
$744.000
|
$800.000
|
$700.000
|
$1,179.980
|
$1,020.000
|
|
|
|
CONC BOX CULV (10 FT X 6 FT)(EXTEND)
|
LF
|
18.000
|
$625.000
|
$1,000.000
|
$1,200.000
|
$950.000
|
$2,072.270
|
$1,510.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
30.000
|
$50.000
|
$0.000
|
$0.000
|
$0.000
|
$107.300
|
$75.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
88.000
|
$65.000
|
$112.000
|
$85.000
|
$105.000
|
$66.140
|
$89.000
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
4.000
|
$95.000
|
$213.000
|
$150.000
|
$200.000
|
$206.500
|
$250.000
|
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$5,200.000
|
$4,800.000
|
$5,000.000
|
$4,500.000
|
$6,698.470
|
$6,500.000
|
|
|
|
INLET(COMPL)(DROP)(TY 1)(1 GRATE)
|
EA
|
1.000
|
$3,000.000
|
$2,660.000
|
$4,000.000
|
$2,500.000
|
$6,323.470
|
$6,500.000
|
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$25,000.000
|
$21,270.000
|
$35,000.000
|
$20,000.000
|
$24,991.280
|
$36,000.000
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$6,500.000
|
$6,381.000
|
$15,000.000
|
$6,000.000
|
$7,495.260
|
$15,000.000
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$8,500.000
|
$6,900.000
|
$8,000.000
|
$6,500.000
|
$8,120.260
|
$8,640.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
2.000
|
$8,500.000
|
$7,980.000
|
$10,000.000
|
$7,500.000
|
$9,370.260
|
$11,000.000
|
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
1.000
|
$900.000
|
$850.000
|
$850.000
|
$800.000
|
$1,254.740
|
$1,800.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$700.000
|
$850.000
|
$850.000
|
$800.000
|
$783.750
|
$1,800.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,100.000
|
$900.000
|
$900.000
|
$850.000
|
$1,176.990
|
$2,500.000
|
|
|
|
REMOV STR (WINGWALL)
|
EA
|
7.000
|
$1,200.000
|
$1,600.000
|
$1,250.000
|
$1,500.000
|
$1,738.590
|
$2,000.000
|
|
|
|
REMOV STR (PIPE)
|
EA
|
5.000
|
$350.000
|
$800.000
|
$500.000
|
$750.000
|
$327.450
|
$650.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$105,600.000
|
$82,000.000
|
$122,000.000
|
$55,000.000
|
$265,035.510
|
$150,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$3,000.000
|
$1,300.000
|
$2,500.000
|
$4,000.000
|
$3,448.310
|
$16,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
320.000
|
$29.000
|
$26.600
|
$25.000
|
$25.000
|
$40.530
|
$27.800
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
320.000
|
$9.000
|
$9.500
|
$5.000
|
$9.000
|
$10.820
|
$10.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
386.000
|
$2.300
|
$4.250
|
$4.000
|
$4.000
|
$3.410
|
$4.500
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
386.000
|
$0.650
|
$1.000
|
$1.000
|
$1.000
|
$1.310
|
$1.120
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
395.000
|
$3.500
|
$4.800
|
$5.000
|
$4.500
|
$7.610
|
$5.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
395.000
|
$0.800
|
$1.000
|
$1.000
|
$1.000
|
$2.360
|
$1.120
|
|
|
|
CONCRETE GUTTER (MODIFIED)
|
LF
|
132.000
|
$90.000
|
$16.000
|
$40.000
|
$15.000
|
$45.890
|
$105.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
282.000
|
$30.000
|
$31.900
|
$50.000
|
$61.500
|
$47.010
|
$55.000
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
602.000
|
$10.000
|
$39.000
|
$25.000
|
$38.000
|
$27.900
|
$55.000
|
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
88.000
|
$15.000
|
$87.000
|
$25.000
|
$75.000
|
$34.450
|
$55.000
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
600.000
|
$20.000
|
$19.500
|
$25.000
|
$18.250
|
$19.330
|
$21.000
|
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$1,135.000
|
$1,010.000
|
$950.000
|
$950.000
|
$1,048.070
|
$1,060.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$2,400.000
|
$2,400.000
|
$2,250.000
|
$2,387.790
|
$2,500.000
|
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
5.000
|
$175.000
|
$265.000
|
$250.000
|
$250.000
|
$272.610
|
$280.000
|
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
2.000
|
$230.000
|
$320.000
|
$300.000
|
$300.000
|
$320.060
|
$340.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
57.000
|
$525.000
|
$372.000
|
$350.000
|
$350.000
|
$378.150
|
$389.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$600.000
|
$400.000
|
$400.000
|
$375.000
|
$482.610
|
$417.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$1,000.000
|
$480.000
|
$500.000
|
$450.000
|
$482.610
|
$500.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
20.000
|
$85.000
|
$75.000
|
$70.000
|
$70.000
|
$74.510
|
$78.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
12.000
|
$25.000
|
$21.000
|
$20.000
|
$20.000
|
$22.690
|
$23.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
12.000
|
$77.000
|
$80.000
|
$75.000
|
$75.000
|
$79.590
|
$84.000
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
12.000
|
$15.000
|
$10.500
|
$10.000
|
$10.000
|
$11.340
|
$12.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
790.000
|
$0.220
|
$0.530
|
$0.500
|
$0.400
|
$0.440
|
$0.560
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
17,198.000
|
$0.180
|
$0.160
|
$0.150
|
$0.390
|
$0.330
|
$0.240
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
218.000
|
$0.800
|
$1.000
|
$1.000
|
$1.600
|
$2.040
|
$15.000
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
31.000
|
$5.500
|
$15.950
|
$15.000
|
$10.000
|
$9.560
|
$17.000
|
|
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$132.000
|
$309.000
|
$300.000
|
$250.000
|
$260.570
|
$473.000
|
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
17,420.000
|
$0.500
|
$0.580
|
$0.550
|
$0.650
|
$0.790
|
$0.790
|
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
790.000
|
$0.700
|
$0.640
|
$0.600
|
$0.700
|
$1.700
|
$1.100
|
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
17,198.000
|
$0.550
|
$0.580
|
$0.550
|
$0.650
|
$0.790
|
$0.800
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
178.000
|
$3.000
|
$4.250
|
$4.000
|
$7.000
|
$4.770
|
$4.450
|
|
|
|
THERMOPLASTIC PIPE (SIZE)(PP)
|
LF
|
60.000
|
$25.950
|
$0.000
|
$0.000
|
$0.000
|
$107.300
|
$65.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,000.000
|
$2,600.000
|
$5,000.000
|
$4,500.000
|
$8,380.700
|
$8,000.000
|
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
18.000
|
$3.000
|
$21.270
|
$25.000
|
$48.000
|
$28.720
|
$22.500
|
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$8,000.000
|
$600.000
|
$5,000.000
|
$4,000.000
|
$8,380.700
|
$50,000.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$200.000
|
$500.000
|
$300.000
|
$450.000
|
$533.160
|
$2,000.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
90.000
|
$50.000
|
$58.500
|
$75.000
|
$55.000
|
$107.300
|
$75.000
|
|
Totals: |
$1,427,018.460
|
$1,262,197.650
|
$1,378,245.310
|
$1,385,067.930
|
$1,807,138.541
|
$1,920,462.760
|