PREPARING ROW
|
STA
|
79.020
|
$1,700.000
|
$230.000
|
$500.000
|
$300.000
|
$1,300.000
|
$200.000
|
$650.000
|
$650.000
|
$140.000
|
$500.000
|
$1,225.000
|
$2,500.000
|
$1,500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
209.000
|
$15.000
|
$20.000
|
$15.000
|
$19.000
|
$9.500
|
$10.000
|
$13.000
|
$24.000
|
$8.000
|
$10.000
|
$13.000
|
$14.000
|
$20.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
427.000
|
$6.350
|
$15.000
|
$10.000
|
$5.000
|
$4.000
|
$8.000
|
$7.000
|
$12.000
|
$7.000
|
$5.000
|
$8.000
|
$3.000
|
$12.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,750.000
|
$6.500
|
$6.000
|
$10.000
|
$9.500
|
$10.500
|
$8.000
|
$9.500
|
$5.000
|
$8.000
|
$15.000
|
$13.000
|
$20.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,400.000
|
$12.000
|
$5.000
|
$10.000
|
$12.500
|
$14.000
|
$6.000
|
$8.000
|
$18.000
|
$36.000
|
$30.000
|
$50.000
|
$15.000
|
$35.000
|
|
|
BLADING
|
LF
|
5,838.000
|
$0.570
|
$1.000
|
$1.000
|
$0.200
|
$0.500
|
$2.500
|
$2.000
|
$1.500
|
$0.500
|
$2.500
|
$1.000
|
$1.000
|
$10.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
29,206.000
|
$0.750
|
$0.500
|
$0.400
|
$0.200
|
$0.350
|
$0.500
|
$0.350
|
$0.800
|
$2.000
|
$1.000
|
$1.400
|
$1.250
|
$5.500
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
14,605.000
|
$0.100
|
$0.200
|
$0.140
|
$0.060
|
$0.090
|
$0.080
|
$0.060
|
$0.150
|
$0.140
|
$0.200
|
$0.200
|
$0.200
|
$0.500
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
14,605.000
|
$0.100
|
$0.180
|
$0.140
|
$0.060
|
$0.090
|
$0.080
|
$0.060
|
$0.150
|
$0.140
|
$0.200
|
$0.200
|
$0.200
|
$0.500
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
29,229.000
|
$0.400
|
$0.320
|
$0.270
|
$0.300
|
$0.260
|
$0.310
|
$0.290
|
$0.450
|
$0.290
|
$0.350
|
$0.300
|
$0.350
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
292.300
|
$16.000
|
$5.000
|
$5.000
|
$10.000
|
$18.450
|
$25.000
|
$14.000
|
$20.000
|
$10.000
|
$30.000
|
$25.000
|
$18.000
|
$100.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
10.000
|
$60.000
|
$250.000
|
$200.000
|
$150.000
|
$300.000
|
$75.000
|
$78.000
|
$240.000
|
$48.000
|
$56.000
|
$300.000
|
$110.000
|
$75.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
|
SY
|
24,534.000
|
$10.500
|
$11.000
|
$8.300
|
$8.050
|
$9.000
|
$8.000
|
$10.500
|
$11.000
|
$10.000
|
$19.600
|
$9.000
|
$12.500
|
$12.500
|
|
|
REWORK BS MTL (TY C) (10"-14")(OC)
|
SY
|
20,243.000
|
$2.250
|
$1.400
|
$1.000
|
$1.250
|
$1.800
|
$2.050
|
$1.750
|
$2.000
|
$4.000
|
$3.000
|
$2.800
|
$1.000
|
$5.500
|
|
|
CEMENT
|
TON
|
391.000
|
$145.000
|
$150.000
|
$140.000
|
$138.500
|
$145.000
|
$145.000
|
$147.000
|
$140.000
|
$140.000
|
$153.000
|
$135.000
|
$150.000
|
$171.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
26,064.000
|
$1.500
|
$1.350
|
$1.500
|
$1.250
|
$1.400
|
$1.750
|
$1.600
|
$1.900
|
$3.000
|
$3.300
|
$3.000
|
$3.500
|
$4.000
|
|
|
CM TRT(PT MX)(CL N)(TYD)(GR1-2)(FN POS)
|
CY
|
471.000
|
$65.000
|
$130.000
|
$100.000
|
$92.000
|
$92.000
|
$90.160
|
$120.000
|
$120.000
|
$100.000
|
$125.000
|
$180.000
|
$175.000
|
$171.000
|
|
|
ASPH (RC-250)
|
GAL
|
6,134.000
|
$3.750
|
$4.000
|
$3.200
|
$3.500
|
$4.030
|
$3.750
|
$3.250
|
$3.500
|
$4.200
|
$4.400
|
$3.500
|
$5.000
|
$6.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
182.000
|
$87.000
|
$90.000
|
$87.000
|
$125.000
|
$135.870
|
$95.000
|
$135.000
|
$120.000
|
$131.000
|
$137.500
|
$120.000
|
$135.000
|
$350.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
9,569.000
|
$3.400
|
$2.850
|
$2.500
|
$2.450
|
$3.630
|
$3.000
|
$2.700
|
$3.000
|
$2.500
|
$2.750
|
$3.200
|
$3.000
|
$4.250
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
197.000
|
$115.000
|
$90.000
|
$110.000
|
$105.000
|
$155.440
|
$105.000
|
$105.000
|
$125.000
|
$100.000
|
$104.500
|
$140.000
|
$110.000
|
$350.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
|
TON
|
274.000
|
$90.000
|
$160.000
|
$100.000
|
$110.000
|
$109.390
|
$120.000
|
$110.000
|
$118.000
|
$210.000
|
$220.000
|
$100.000
|
$210.000
|
$140.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
405.000
|
$3.000
|
$10.000
|
$10.000
|
$12.000
|
$15.000
|
$5.000
|
$6.500
|
$10.000
|
$15.000
|
$16.500
|
$15.000
|
$20.000
|
$10.000
|
|
|
CEM STABIL BKFL
|
CY
|
234.000
|
$80.000
|
$160.000
|
$120.000
|
$122.000
|
$90.000
|
$115.000
|
$130.000
|
$120.000
|
$95.000
|
$120.000
|
$100.000
|
$125.000
|
$140.000
|
|
|
CUT & RESTORING PAV
|
SY
|
231.000
|
$165.000
|
$60.000
|
$40.000
|
$61.000
|
$33.000
|
$130.000
|
$125.000
|
$135.000
|
$81.000
|
$160.000
|
$110.000
|
$40.000
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
234.000
|
$5.000
|
$10.000
|
$10.000
|
$5.050
|
$2.000
|
$10.000
|
$17.000
|
$11.000
|
$1.000
|
$8.000
|
$1.000
|
$5.000
|
$3.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
666.000
|
$22.000
|
$30.000
|
$30.000
|
$15.250
|
$5.000
|
$35.000
|
$30.000
|
$30.000
|
$20.000
|
$30.000
|
$25.000
|
$20.000
|
$45.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
3.000
|
$440.000
|
$1,000.000
|
$1,000.000
|
$410.000
|
$680.000
|
$500.000
|
$675.000
|
$600.000
|
$685.000
|
$450.000
|
$1,000.000
|
$950.000
|
$550.000
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
33.000
|
$180.000
|
$200.000
|
$150.000
|
$180.000
|
$95.000
|
$125.000
|
$185.000
|
$150.000
|
$99.000
|
$80.000
|
$220.000
|
$150.000
|
$185.000
|
|
|
RIPRAP (STONE PROTECTION)(21 IN)
|
CY
|
14.000
|
$275.000
|
$200.000
|
$200.000
|
$185.000
|
$140.000
|
$250.000
|
$220.000
|
$270.000
|
$259.000
|
$80.000
|
$280.000
|
$250.000
|
$250.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
32.000
|
$500.000
|
$500.000
|
$450.000
|
$340.000
|
$420.000
|
$550.000
|
$430.000
|
$525.000
|
$405.000
|
$400.000
|
$640.000
|
$450.000
|
$550.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
448.000
|
$210.000
|
$360.000
|
$330.000
|
$375.000
|
$335.000
|
$425.000
|
$350.000
|
$400.000
|
$380.000
|
$300.000
|
$375.000
|
$400.000
|
$500.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,374.000
|
$50.000
|
$50.000
|
$50.000
|
$47.000
|
$33.000
|
$48.000
|
$60.000
|
$46.000
|
$74.000
|
$36.000
|
$70.000
|
$75.000
|
$85.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
326.000
|
$60.000
|
$62.000
|
$60.000
|
$58.000
|
$48.000
|
$92.000
|
$70.000
|
$80.000
|
$110.000
|
$50.000
|
$100.000
|
$85.000
|
$95.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
139.000
|
$80.000
|
$80.000
|
$90.000
|
$79.000
|
$85.000
|
$132.000
|
$92.000
|
$110.000
|
$195.000
|
$75.000
|
$150.000
|
$120.000
|
$105.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
8.000
|
$145.000
|
$80.000
|
$100.000
|
$104.000
|
$96.000
|
$120.000
|
$78.000
|
$160.000
|
$87.000
|
$72.000
|
$130.000
|
$150.000
|
$125.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
1.000
|
$4,200.000
|
$4,800.000
|
$4,500.000
|
$3,700.000
|
$4,400.000
|
$4,500.000
|
$4,600.000
|
$4,500.000
|
$3,700.000
|
$3,000.000
|
$4,000.000
|
$4,500.000
|
$5,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$16,000.000
|
$10,600.000
|
$15,000.000
|
$8,200.000
|
$24,000.000
|
$16,000.000
|
$17,000.000
|
$17,000.000
|
$22,000.000
|
$10,000.000
|
$26,000.000
|
$20,000.000
|
$8,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
50.000
|
$850.000
|
$775.000
|
$1,000.000
|
$1,250.000
|
$600.000
|
$800.000
|
$1,600.000
|
$800.000
|
$845.000
|
$762.000
|
$1,400.000
|
$950.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,000.000
|
$775.000
|
$1,200.000
|
$1,400.000
|
$700.000
|
$850.000
|
$1,650.000
|
$850.000
|
$1,050.000
|
$765.000
|
$1,400.000
|
$1,750.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,200.000
|
$960.000
|
$1,400.000
|
$1,575.000
|
$880.000
|
$950.000
|
$1,650.000
|
$900.000
|
$1,240.000
|
$1,048.000
|
$1,800.000
|
$2,500.000
|
$2,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,700.000
|
$880.000
|
$1,400.000
|
$1,575.000
|
$920.000
|
$2,000.000
|
$1,750.000
|
$2,000.000
|
$1,200.000
|
$1,100.000
|
$1,600.000
|
$2,500.000
|
$3,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,800.000
|
$1,025.000
|
$1,700.000
|
$1,800.000
|
$1,050.000
|
$2,500.000
|
$1,750.000
|
$2,200.000
|
$1,300.000
|
$1,300.000
|
$1,700.000
|
$2,500.000
|
$3,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,950.000
|
$1,500.000
|
$2,800.000
|
$1,900.000
|
$1,550.000
|
$3,000.000
|
$1,775.000
|
$2,400.000
|
$1,800.000
|
$1,500.000
|
$2,100.000
|
$2,500.000
|
$4,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,200.000
|
$1,000.000
|
$1,500.000
|
$725.000
|
$580.000
|
$1,250.000
|
$4,200.000
|
$1,000.000
|
$850.000
|
$800.000
|
$1,200.000
|
$2,000.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
303.000
|
$20.000
|
$10.000
|
$10.000
|
$8.150
|
$4.500
|
$30.000
|
$13.400
|
$20.000
|
$21.000
|
$15.000
|
$20.000
|
$15.000
|
$30.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
120.000
|
$70.000
|
$40.000
|
$50.000
|
$72.000
|
$20.000
|
$95.000
|
$43.000
|
$75.000
|
$40.000
|
$45.000
|
$80.000
|
$60.000
|
$100.000
|
|
|
REMOV STR (PIPE)
|
EA
|
34.000
|
$520.000
|
$200.000
|
$500.000
|
$360.000
|
$92.000
|
$850.000
|
$425.000
|
$750.000
|
$155.000
|
$300.000
|
$750.000
|
$250.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$143,500.000
|
$50,000.000
|
$140,000.650
|
$135,000.000
|
$158,000.000
|
$150,000.000
|
$159,000.000
|
$160,000.000
|
$106,000.000
|
$90,000.000
|
$165,000.000
|
$210,000.000
|
$270,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$5,500.000
|
$4,000.000
|
$4,000.000
|
$11,500.000
|
$10,640.000
|
$1,750.000
|
$1,800.000
|
$7,000.000
|
$6,500.000
|
$13,440.000
|
$1,800.000
|
$25,000.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
88.000
|
$26.500
|
$23.000
|
$25.000
|
$30.000
|
$31.000
|
$30.000
|
$28.000
|
$45.000
|
$32.000
|
$35.000
|
$30.000
|
$25.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
88.000
|
$8.500
|
$10.000
|
$3.000
|
$10.000
|
$7.000
|
$12.000
|
$10.000
|
$15.000
|
$2.000
|
$5.000
|
$10.000
|
$12.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
817.000
|
$2.750
|
$2.600
|
$3.000
|
$5.000
|
$2.600
|
$3.500
|
$3.500
|
$4.000
|
$2.500
|
$3.000
|
$2.500
|
$3.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
817.000
|
$0.650
|
$0.500
|
$0.500
|
$1.000
|
$0.500
|
$1.000
|
$1.000
|
$1.000
|
$0.100
|
$1.000
|
$1.000
|
$0.500
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,688.000
|
$5.000
|
$3.750
|
$4.000
|
$4.000
|
$3.300
|
$3.000
|
$2.950
|
$4.000
|
$3.000
|
$2.500
|
$3.000
|
$4.000
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,688.000
|
$1.000
|
$0.500
|
$1.000
|
$0.750
|
$1.000
|
$0.800
|
$0.750
|
$1.000
|
$0.500
|
$0.750
|
$1.000
|
$0.500
|
$8.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
251.000
|
$17.500
|
$32.000
|
$30.000
|
$30.000
|
$39.000
|
$30.000
|
$29.000
|
$32.000
|
$38.000
|
$20.000
|
$22.000
|
$30.000
|
$35.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
248.000
|
$83.000
|
$80.000
|
$70.000
|
$90.000
|
$90.000
|
$130.000
|
$92.000
|
$135.000
|
$90.000
|
$75.000
|
$100.000
|
$80.000
|
$85.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,945.000
|
$18.000
|
$28.000
|
$30.000
|
$30.000
|
$38.000
|
$30.000
|
$34.000
|
$22.000
|
$35.000
|
$22.000
|
$32.000
|
$45.000
|
$42.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
352.000
|
$14.000
|
$25.000
|
$15.000
|
$25.000
|
$27.000
|
$11.000
|
$36.000
|
$65.000
|
$35.000
|
$16.500
|
$30.000
|
$40.000
|
$42.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
221.000
|
$14.000
|
$25.000
|
$15.000
|
$30.000
|
$42.000
|
$18.000
|
$42.000
|
$43.000
|
$49.000
|
$16.500
|
$35.000
|
$20.000
|
$42.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
200.000
|
$20.000
|
$20.150
|
$30.000
|
$20.000
|
$20.150
|
$21.000
|
$21.000
|
$21.000
|
$21.000
|
$20.000
|
$20.000
|
$22.000
|
$25.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,200.000
|
$865.000
|
$1,200.000
|
$1,100.000
|
$865.000
|
$1,200.000
|
$865.000
|
$1,200.000
|
$957.000
|
$950.000
|
$1,100.000
|
$950.000
|
$1,850.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
100.000
|
$65.000
|
$40.150
|
$65.000
|
$48.000
|
$40.150
|
$50.000
|
$41.000
|
$50.000
|
$44.000
|
$75.000
|
$50.000
|
$45.000
|
$35.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,200.000
|
$2,231.000
|
$2,300.000
|
$2,550.000
|
$2,231.000
|
$2,550.000
|
$2,231.000
|
$2,600.000
|
$2,450.000
|
$2,250.000
|
$2,500.000
|
$2,500.000
|
$2,850.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
17.000
|
$175.000
|
$160.000
|
$150.000
|
$165.000
|
$110.000
|
$175.000
|
$160.000
|
$170.000
|
$149.000
|
$156.000
|
$110.000
|
$125.000
|
$650.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
2.000
|
$230.000
|
$196.000
|
$200.000
|
$200.000
|
$155.000
|
$225.000
|
$196.000
|
$210.000
|
$161.000
|
$178.000
|
$160.000
|
$175.000
|
$650.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
3.000
|
$600.000
|
$552.000
|
$500.000
|
$565.000
|
$420.000
|
$650.000
|
$552.000
|
$580.000
|
$615.000
|
$644.000
|
$450.000
|
$500.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
44.000
|
$350.000
|
$320.000
|
$400.000
|
$330.000
|
$335.000
|
$350.000
|
$349.000
|
$340.000
|
$350.000
|
$557.000
|
$350.000
|
$400.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$410.000
|
$425.000
|
$500.000
|
$435.000
|
$475.000
|
$450.000
|
$423.000
|
$450.000
|
$460.000
|
$667.000
|
$500.000
|
$500.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$675.500
|
$575.000
|
$700.000
|
$589.000
|
$600.000
|
$600.000
|
$572.000
|
$600.000
|
$620.000
|
$1,092.000
|
$600.000
|
$700.000
|
$650.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
8.000
|
$280.000
|
$320.000
|
$300.000
|
$325.000
|
$265.000
|
$350.000
|
$316.000
|
$340.000
|
$340.000
|
$402.000
|
$300.000
|
$275.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
24.000
|
$85.000
|
$85.000
|
$75.000
|
$50.000
|
$50.000
|
$75.000
|
$90.000
|
$55.000
|
$100.000
|
$109.000
|
$50.000
|
$55.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
8.000
|
$28.000
|
$20.000
|
$30.000
|
$14.000
|
$10.000
|
$25.000
|
$10.000
|
$20.000
|
$11.000
|
$14.000
|
$30.000
|
$10.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
8.000
|
$45.000
|
$38.000
|
$60.000
|
$42.000
|
$45.000
|
$50.000
|
$45.000
|
$80.000
|
$49.000
|
$74.000
|
$60.000
|
$50.000
|
$100.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
8.000
|
$30.000
|
$15.000
|
$15.000
|
$50.000
|
$15.000
|
$45.000
|
$15.000
|
$50.000
|
$5.000
|
$6.000
|
$10.000
|
$15.000
|
$50.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,406.000
|
$1.000
|
$1.000
|
$1.000
|
$1.200
|
$1.000
|
$1.000
|
$1.000
|
$0.600
|
$0.500
|
$1.000
|
$1.000
|
$2.000
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
175.000
|
$5.500
|
$6.000
|
$7.000
|
$7.000
|
$6.700
|
$8.500
|
$6.000
|
$7.000
|
$7.000
|
$7.000
|
$10.000
|
$6.250
|
$20.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$130.000
|
$150.000
|
$160.000
|
$150.000
|
$146.000
|
$300.000
|
$150.000
|
$150.000
|
$160.000
|
$173.000
|
$250.000
|
$155.000
|
$350.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
1.000
|
$430.000
|
$444.000
|
$600.000
|
$550.000
|
$532.000
|
$400.000
|
$444.000
|
$560.000
|
$580.000
|
$510.000
|
$1,000.000
|
$450.000
|
$400.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
14,760.000
|
$0.250
|
$0.380
|
$0.350
|
$0.350
|
$0.340
|
$0.420
|
$0.380
|
$0.350
|
$0.350
|
$0.450
|
$0.400
|
$0.400
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
984.000
|
$0.250
|
$0.430
|
$0.410
|
$0.410
|
$0.400
|
$0.600
|
$0.430
|
$0.450
|
$0.400
|
$0.500
|
$0.400
|
$0.450
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
10,339.000
|
$0.300
|
$0.380
|
$0.350
|
$0.350
|
$0.340
|
$0.420
|
$0.380
|
$0.350
|
$0.350
|
$0.450
|
$0.400
|
$0.400
|
$0.550
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
190.000
|
$3.600
|
$6.000
|
$4.000
|
$3.400
|
$3.300
|
$6.750
|
$6.000
|
$4.000
|
$3.600
|
$7.000
|
$10.000
|
$6.250
|
$15.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$12,000.000
|
$5,000.000
|
$5,000.000
|
$7,500.000
|
$2,000.000
|
$10,500.000
|
$3,500.000
|
$5,000.000
|
$2,800.000
|
$15,560.000
|
$5,000.000
|
$10,000.000
|
$16,500.000
|
|
Totals: |
$1,577,873.860
|
$1,428,673.970
|
$1,460,312.870
|
$1,486,815.040
|
$1,581,360.705
|
$1,588,102.180
|
$1,678,533.300
|
$1,736,839.000
|
$1,757,176.360
|
$1,942,616.150
|
$1,945,457.000
|
$2,299,462.200
|
$2,852,426.200
|