PREPARING ROW
|
STA
|
156.200
|
$3,100.000
|
$1,000.000
|
$670.000
|
$600.000
|
$1,000.000
|
$2,200.000
|
$5,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,850.000
|
$15.000
|
$15.000
|
$20.000
|
$18.400
|
$29.000
|
$37.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
685.000
|
$20.000
|
$50.000
|
$75.000
|
$60.000
|
$40.000
|
$25.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,094.000
|
$20.000
|
$15.000
|
$15.000
|
$27.000
|
$40.000
|
$25.000
|
$35.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
900.000
|
$2.000
|
$2.000
|
$2.250
|
$1.550
|
$1.000
|
$1.000
|
$2.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
450.000
|
$2.000
|
$1.500
|
$3.000
|
$1.100
|
$1.000
|
$1.000
|
$2.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
450.000
|
$2.000
|
$1.500
|
$3.000
|
$1.100
|
$1.000
|
$1.000
|
$2.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
4.000
|
$700.000
|
$700.000
|
$750.000
|
$600.000
|
$1,100.000
|
$650.000
|
$2,000.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
2.000
|
$700.000
|
$700.000
|
$725.000
|
$630.000
|
$1,100.000
|
$650.000
|
$2,000.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
2.000
|
$700.000
|
$700.000
|
$725.000
|
$630.000
|
$1,100.000
|
$650.000
|
$200.000
|
|
|
VEGETATIVE WATERING
|
MG
|
905.000
|
$25.000
|
$10.000
|
$10.000
|
$20.000
|
$20.000
|
$10.000
|
$60.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
6,444.000
|
$60.000
|
$45.000
|
$55.000
|
$65.000
|
$69.000
|
$60.000
|
$65.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
3,142.000
|
$5.000
|
$4.000
|
$4.600
|
$4.800
|
$5.000
|
$4.350
|
$8.000
|
|
|
ASPH (AC-10)
|
GAL
|
3,429.000
|
$4.500
|
$5.000
|
$2.850
|
$3.650
|
$5.000
|
$4.000
|
$8.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
3,429.000
|
$4.500
|
$5.000
|
$2.850
|
$4.250
|
$5.000
|
$4.000
|
$8.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
842.000
|
$150.000
|
$120.000
|
$130.000
|
$160.000
|
$170.000
|
$120.000
|
$20.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
27,956.000
|
$4.500
|
$3.000
|
$2.500
|
$3.500
|
$4.500
|
$4.000
|
$8.000
|
|
|
CL C CONC (CULV)
|
CY
|
28.600
|
$1,400.000
|
$1,000.000
|
$1,925.000
|
$640.000
|
$2,500.000
|
$1,750.000
|
$1,100.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
8.200
|
$750.000
|
$750.000
|
$450.000
|
$425.000
|
$800.000
|
$1,150.000
|
$650.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
7.000
|
$200.000
|
$500.000
|
$150.000
|
$480.000
|
$230.000
|
$500.000
|
$210.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
16.000
|
$100.000
|
$150.000
|
$105.000
|
$815.000
|
$150.000
|
$85.000
|
$62.000
|
|
|
CMP AR (GAL STL DES 2)
|
LF
|
100.000
|
$160.000
|
$50.000
|
$103.000
|
$52.000
|
$77.000
|
$85.000
|
$65.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
164.000
|
$180.000
|
$60.000
|
$109.000
|
$60.000
|
$110.000
|
$100.000
|
$85.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
3.000
|
$100.000
|
$200.000
|
$207.000
|
$106.000
|
$165.000
|
$390.000
|
$62.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
3.000
|
$120.000
|
$250.000
|
$225.000
|
$160.000
|
$220.000
|
$390.000
|
$105.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
6.000
|
$7,000.000
|
$10,000.000
|
$10,000.000
|
$6,900.000
|
$9,500.000
|
$12,225.000
|
$10,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,000.000
|
$700.000
|
$1,440.000
|
$980.000
|
$1,000.000
|
$1,125.000
|
$650.000
|
|
|
SET (TY II) (24 IN) (CMP) (3: 1) (C)
|
EA
|
15.000
|
$1,000.000
|
$800.000
|
$1,650.000
|
$1,040.000
|
$1,200.000
|
$1,450.000
|
$850.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
1.000
|
$1,000.000
|
$800.000
|
$1,520.000
|
$1,120.000
|
$1,200.000
|
$1,350.000
|
$850.000
|
|
|
SET (TY II) (30 IN) (CMP) (3: 1) (C)
|
EA
|
8.000
|
$1,300.000
|
$1,200.000
|
$1,860.000
|
$1,380.000
|
$1,700.000
|
$2,225.000
|
$1,500.000
|
|
|
SET (TY II) (36 IN) (CMP) (3: 1) (C)
|
EA
|
4.000
|
$3,500.000
|
$1,500.000
|
$2,055.000
|
$3,720.000
|
$2,200.000
|
$2,775.000
|
$2,000.000
|
|
|
SET (TY II) (42 IN) (CMP) (3: 1) (C)
|
EA
|
2.000
|
$5,000.000
|
$3,000.000
|
$2,525.000
|
$4,520.000
|
$3,300.000
|
$5,000.000
|
$4,000.000
|
|
|
SET (TY II) (DES 2) (CMP) (6: 1) (P)
|
EA
|
36.000
|
$1,085.000
|
$1,000.000
|
$1,905.000
|
$1,490.000
|
$1,100.000
|
$2,225.000
|
$1,500.000
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (P)
|
EA
|
14.000
|
$1,085.000
|
$1,500.000
|
$2,500.000
|
$2,020.000
|
$1,700.000
|
$2,675.000
|
$2,000.000
|
|
|
SET (TY II) (DES 4) (CMP) (3: 1) (C)
|
EA
|
8.000
|
$2,000.000
|
$1,300.000
|
$2,065.000
|
$4,100.000
|
$2,200.000
|
$2,350.000
|
$3,000.000
|
|
|
SET (TY I) (DES 8) (3:1) (C)
|
EA
|
4.000
|
$6,000.000
|
$8,000.000
|
$7,795.000
|
$6,170.000
|
$7,200.000
|
$5,550.000
|
$2,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
4.000
|
$800.000
|
$500.000
|
$395.000
|
$1,300.000
|
$880.000
|
$400.000
|
$1,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$220,000.000
|
$150,000.100
|
$178,000.000
|
$120,000.000
|
$200,000.000
|
$190,000.000
|
$275,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$5,000.000
|
$3,000.000
|
$7,500.000
|
$10,000.000
|
$10,000.000
|
$7,000.000
|
$8,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,550.000
|
$5.000
|
$5.000
|
$5.400
|
$2.150
|
$5.000
|
$3.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,550.000
|
$2.000
|
$0.500
|
$0.750
|
$0.550
|
$1.000
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
340.000
|
$7.000
|
$6.000
|
$12.000
|
$6.000
|
$6.000
|
$7.000
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
340.000
|
$2.000
|
$1.500
|
$1.000
|
$1.100
|
$1.000
|
$1.500
|
$8.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
126.000
|
$80.000
|
$50.000
|
$100.000
|
$90.000
|
$67.000
|
$55.000
|
$62.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
682.000
|
$25.000
|
$25.000
|
$35.000
|
$52.000
|
$28.000
|
$30.000
|
$62.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
121.000
|
$25.000
|
$30.000
|
$50.000
|
$35.000
|
$82.000
|
$30.000
|
$62.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,475.000
|
$22.000
|
$25.000
|
$20.640
|
$20.000
|
$21.000
|
$22.500
|
$25.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
700.000
|
$25.000
|
$30.000
|
$21.730
|
$21.000
|
$22.000
|
$22.500
|
$35.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,280.000
|
$5.000
|
$5.000
|
$3.260
|
$3.200
|
$3.500
|
$4.500
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
38.000
|
$2,200.000
|
$2,600.000
|
$2,600.000
|
$2,550.000
|
$2,700.000
|
$2,291.000
|
$2,850.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
4.000
|
$150.000
|
$350.000
|
$325.000
|
$320.000
|
$330.000
|
$500.000
|
$650.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
5.000
|
$215.000
|
$200.000
|
$165.000
|
$160.000
|
$200.000
|
$300.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$650.000
|
$1,000.000
|
$1,032.000
|
$1,000.000
|
$1,100.000
|
$800.000
|
$100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$800.000
|
$1,200.000
|
$1,249.000
|
$1,200.000
|
$1,200.000
|
$650.000
|
$100.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
6.000
|
$400.000
|
$600.000
|
$543.000
|
$530.000
|
$550.000
|
$350.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
13.000
|
$420.000
|
$700.000
|
$651.000
|
$640.000
|
$660.000
|
$640.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
14.000
|
$120.000
|
$150.000
|
$135.000
|
$130.000
|
$140.000
|
$100.000
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
97.000
|
$45.000
|
$40.000
|
$38.000
|
$37.000
|
$40.000
|
$45.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
47.000
|
$50.000
|
$80.000
|
$81.000
|
$80.000
|
$80.000
|
$65.000
|
$100.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,536.000
|
$1.500
|
$1.000
|
$1.150
|
$2.000
|
$1.000
|
$0.200
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
130.000
|
$8.000
|
$12.000
|
$13.000
|
$12.000
|
$12.000
|
$15.500
|
$12.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,669.000
|
$0.600
|
$0.450
|
$0.380
|
$0.370
|
$0.480
|
$0.500
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
29,996.000
|
$0.600
|
$0.320
|
$0.370
|
$0.360
|
$0.340
|
$0.400
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
30,700.000
|
$0.600
|
$0.320
|
$0.370
|
$0.360
|
$0.340
|
$0.400
|
$1.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
133.000
|
$5.000
|
$5.000
|
$4.290
|
$4.200
|
$4.000
|
$5.000
|
$20.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
770.000
|
$5.000
|
$4.000
|
$2.720
|
$2.700
|
$4.000
|
$3.500
|
$20.000
|
|
Totals: |
$2,164,831.000
|
$1,557,630.870
|
$1,785,074.910
|
$1,795,277.390
|
$2,113,193.760
|
$2,181,074.300
|
$2,826,209.000
|