PREPARING ROW
|
STA
|
13.700
|
$2,500.000
|
$4,050.000
|
$5,000.000
|
$10,000.000
|
$10,500.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
324.000
|
$22.000
|
$31.900
|
$20.000
|
$50.000
|
$30.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
370.000
|
$22.000
|
$37.000
|
$25.000
|
$50.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
6,570.000
|
$15.000
|
$35.630
|
$15.840
|
$30.000
|
$30.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
4,565.000
|
$2.500
|
$0.680
|
$0.800
|
$0.650
|
$2.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,283.000
|
$1.750
|
$1.100
|
$0.850
|
$0.700
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
2,282.000
|
$1.750
|
$1.100
|
$0.850
|
$0.700
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
104.000
|
$25.000
|
$73.560
|
$5.000
|
$50.000
|
$1.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY G)
|
SY
|
4,565.000
|
$3.000
|
$1.250
|
$5.250
|
$4.000
|
$3.000
|
|
|
PROOF ROLLING
|
HR
|
4.000
|
$100.000
|
$89.180
|
$75.000
|
$400.000
|
$100.000
|
|
|
CEM STABIL BKFL
|
CY
|
98.000
|
$320.000
|
$275.000
|
$300.000
|
$250.000
|
$250.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
16.000
|
$350.000
|
$293.000
|
$350.000
|
$400.000
|
$250.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
330.000
|
$20.000
|
$9.000
|
$10.000
|
$55.000
|
$5.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,667.000
|
$25.000
|
$57.700
|
$25.000
|
$60.000
|
$40.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
456.000
|
$300.000
|
$277.000
|
$300.000
|
$323.000
|
$250.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
512.000
|
$325.000
|
$516.000
|
$550.000
|
$583.000
|
$400.000
|
|
|
CL C CONC (ABUT)
|
CY
|
58.200
|
$1,320.000
|
$1,370.000
|
$1,700.000
|
$1,700.000
|
$1,600.000
|
|
|
CL C CONC (CAP)
|
CY
|
51.900
|
$1,320.000
|
$1,940.000
|
$2,000.000
|
$2,000.000
|
$1,800.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
63.600
|
$1,320.000
|
$1,240.000
|
$1,900.000
|
$2,000.000
|
$1,700.000
|
|
|
REINF CONC SLAB
|
SF
|
13,680.000
|
$30.000
|
$28.100
|
$31.000
|
$33.250
|
$35.000
|
|
|
APPROACH SLAB
|
CY
|
54.600
|
$800.000
|
$924.000
|
$900.000
|
$1,100.000
|
$900.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
834.000
|
$280.000
|
$251.000
|
$200.000
|
$246.840
|
$245.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
1,434.000
|
$300.000
|
$270.000
|
$300.000
|
$246.840
|
$340.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(8 IN)
|
CY
|
64.000
|
$250.000
|
$196.000
|
$165.000
|
$220.000
|
$200.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,486.000
|
$135.000
|
$152.000
|
$140.000
|
$85.000
|
$200.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
68.000
|
$600.000
|
$784.000
|
$700.050
|
$700.000
|
$600.000
|
|
|
RAIL (TY T223)
|
LF
|
808.000
|
$140.000
|
$99.690
|
$185.000
|
$175.000
|
$160.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
108.000
|
$170.000
|
$267.000
|
$250.000
|
$261.000
|
$200.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
11.000
|
$1,300.000
|
$1,650.000
|
$1,500.000
|
$1,000.000
|
$2,000.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
330.000
|
$120.000
|
$178.000
|
$170.000
|
$230.000
|
$200.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$10,000.000
|
$9,500.000
|
$10,000.000
|
$9,500.000
|
$10,000.000
|
|
|
HEADWALL (CH - FW - 30) (DIA= 36 IN)
|
EA
|
1.000
|
$10,500.000
|
$9,580.000
|
$12,500.000
|
$11,000.000
|
$12,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$30,000.000
|
$22,700.000
|
$25,000.000
|
$22,000.000
|
$25,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$35,000.000
|
$26,400.000
|
$30,000.000
|
$25,000.000
|
$30,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$200,000.000
|
$116,000.000
|
$150,000.000
|
$273,500.000
|
$200,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$344,000.000
|
$365,000.000
|
$400,000.000
|
$420,000.000
|
$380,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$4,000.000
|
$2,880.000
|
$4,000.000
|
$4,180.000
|
$8,000.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
125.000
|
$8.000
|
$10.600
|
$10.000
|
$15.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,280.000
|
$5.000
|
$3.200
|
$3.750
|
$4.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,280.000
|
$2.000
|
$1.050
|
$1.250
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
110.000
|
$8.000
|
$6.400
|
$40.000
|
$7.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
110.000
|
$4.000
|
$1.050
|
$15.000
|
$1.000
|
$1.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
|
LF
|
125.000
|
$40.000
|
$31.800
|
$50.000
|
$65.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
296.000
|
$100.000
|
$90.700
|
$85.000
|
$270.000
|
$100.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
12.000
|
$5,000.000
|
$3,490.000
|
$7,000.000
|
$3,631.000
|
$3,500.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
870.000
|
$90.000
|
$117.000
|
$110.000
|
$103.000
|
$120.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
720.000
|
$15.000
|
$7.300
|
$25.000
|
$12.000
|
$18.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
870.000
|
$11.000
|
$26.800
|
$40.000
|
$7.000
|
$50.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
257.000
|
$80.000
|
$129.000
|
$100.000
|
$75.000
|
$70.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
950.000
|
$30.000
|
$33.100
|
$33.250
|
$35.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,750.000
|
$3,160.000
|
$3,800.000
|
$3,000.000
|
$3,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$3.000
|
$2.100
|
$6.000
|
$2.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$300.000
|
$270.000
|
$300.000
|
$300.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,600.000
|
$3,610.000
|
$3,800.000
|
$4,100.000
|
$3,200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$3,000.000
|
$1,350.000
|
$3,250.000
|
$1,500.000
|
$3,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$2,000.000
|
$795.000
|
$2,000.000
|
$900.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$9,000.000
|
$9,210.000
|
$13,200.000
|
$10,000.000
|
$12,000.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
1,340.000
|
$16.000
|
$15.900
|
$17.500
|
$20.000
|
$20.000
|
|
|
GATE (TY 1)
|
EA
|
1.000
|
$1,000.000
|
$2,120.000
|
$3,000.000
|
$2,000.000
|
$2,000.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$1,000.000
|
$529.000
|
$250.000
|
$600.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$300.000
|
$159.000
|
$250.000
|
$180.000
|
$500.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
8.000
|
$25.000
|
$10.600
|
$50.000
|
$22.000
|
$20.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
10,800.000
|
$1.800
|
$0.690
|
$1.500
|
$0.650
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
272.000
|
$8.000
|
$5.600
|
$7.500
|
$6.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
6,050.000
|
$2.000
|
$0.780
|
$3.000
|
$0.650
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$6.000
|
$15.900
|
$20.000
|
$10.000
|
$15.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
240.000
|
$5.000
|
$1.750
|
$10.000
|
$5.000
|
$5.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
2,740.000
|
$1.500
|
$2.050
|
$3.000
|
$1.500
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
2,740.000
|
$1.500
|
$2.050
|
$3.000
|
$1.500
|
$2.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
35.000
|
$15.000
|
$10.600
|
$7.500
|
$5.000
|
$10.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
600.000
|
$3.000
|
$2.650
|
$3.000
|
$1.000
|
$5.000
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
160.000
|
$3.000
|
$3.200
|
$15.000
|
$14.000
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,680.000
|
$2.000
|
$0.010
|
$2.000
|
$0.650
|
$2.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
1,675.000
|
$175.000
|
$149.000
|
$167.000
|
$150.000
|
$150.000
|
|
|
TACK COAT
|
GAL
|
363.000
|
$20.000
|
$7.600
|
$6.000
|
$8.000
|
$10.000
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
3.000
|
$10,000.000
|
$3,180.000
|
$5,000.000
|
$6,000.000
|
$5,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
64.000
|
$50.000
|
$141.000
|
$150.000
|
$115.000
|
$150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$11,800.000
|
$12,000.000
|
$25,000.000
|
$25,000.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
160.000
|
$25.000
|
$16.900
|
$30.000
|
$19.000
|
$20.000
|
|
|
TMA (STATIONARY)
|
DAY
|
28.000
|
$300.000
|
$138.000
|
$225.000
|
$190.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
128.000
|
$75.000
|
$83.100
|
$75.000
|
$90.000
|
$30.000
|
|
Totals: |
$3,842,353.250
|
$3,930,712.130
|
$4,194,758.700
|
$4,449,286.370
|
$4,466,706.000
|