MONTAGUE HOWARD RD (0903-28-073)

Items: 53

County: MONTAGUE
Length: 0.0000 MILES (0.1078 MILES)
Highway: HOWARD RD
District: WICHITA FALLS
Control Number: 0903-28-073
DBE Goal: 0.0%
Project: BR 2025(998)
Guaranty: $63,000.00
Time: 199 WORKING DAYS
Engineer's Estimate: $3,059,363.99
Date: 09/02/2026 1:00 PM CDT (17 days ago)
Contract Number: 9263025
Type: BRIDGE REPLACEMENT
Project ID: A00207438
Contract Type: FEDERAL
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$3,059,363.99
Over/Under Est: -8.34% -$255,133.60
Over/Under Est: -7% -$214,103.99
Amt Left: 1.46% $41,029.61
$3,179,305.73
Over/Under Est: 3.92% $119,941.74
Amt Left: 13.38% $375,075.34
Delta: -11.74% -$334,045.73
$3,510,333.92
Over/Under Est: 14.74% $450,969.93
Amt Left: 25.18% $706,103.53
Delta: -10.41% -$331,028.19
Over/Under Est: 35.92% $1,099,068.71
Amt Left: 48.29% $1,354,202.31
Delta: -18.46% -$648,098.78
$4,529,736.50
Over/Under Est: 48.06% $1,470,372.51
Amt Left: 61.53% $1,725,506.11
Delta: -8.93% -$371,303.80

Bid Items & Bid Tabulations

53 Total 0 of 53
MONTAGUE  |  HOWARD RD  |  WICHITA FALLS  |  0903-28-073  |  09/02/2026 1:00 PM CDT  |  $3,059,363.99  |  BR 2025(998)  |  BRIDGE REPL  |  199 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS STEEL INDUSTRIAL PLACING, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
THK CONSTRUCTION LLC
TUCAN CONTRACTING, LLC
RAGLE CONSTRUCTION, INC.
EARTH BUILDERS, L.P.
PREPARING ROW
STA 14.800 $7,000.000 $1,000.000 $3,500.000 $1,800.000 $5,500.000 $27,000.000 $15,000.000
EXCAV (ROADWAY & CHANNEL)
CY 3,522.000 $15.000 $17.000 $20.000 $20.000 $18.700 $44.000 $25.000
EMBANK (FNL)(OC)(TY B)
CY 1,275.000 $25.000 $17.000 $25.000 $20.000 $27.500 $30.000 $40.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 1,198.000 $1.820 $2.000 $2.500 $2.200 $0.990 $2.000 $3.000
BROADCAST SEED (TEMP_WARM)
SY 599.000 $0.550 $3.000 $3.000 $3.300 $1.760 $3.000 $4.000
BROADCAST SEED (TEMP_COOL)
SY 599.000 $0.550 $3.000 $3.000 $3.300 $1.930 $3.000 $4.000
VEGETATIVE WATERING
TGL 13.000 $80.000 $10.000 $1.000 $1.000 $550.000 $200.000 $50.000
SOIL RET BLKT (OPT1)
SY 681.000 $7.000 $5.000 $5.000 $5.500 $4.950 $9.880 $6.000
PROOF ROLLING
HR 16.000 $125.000 $100.000 $20.000 $100.000 $60.000 $105.000 $125.000
FL BS (CMP IN PLC)(TY A GR 1-2) (6")
SY 863.000 $30.000 $30.000 $80.000 $45.000 $44.000 $26.000 $40.000
D-GR HMA TY-B PG64-22
TON 299.000 $125.000 $255.750 $260.000 $281.330 $273.350 $300.000 $350.000
D-GR HMA TY-C PG70-22
TON 157.000 $130.000 $275.000 $280.000 $302.500 $286.660 $250.000 $450.000
TACK COAT
GAL 56.000 $5.000 $2.000 $2.000 $2.200 $95.540 $20.000 $50.000
CEM STABIL BKFL
CY 266.000 $110.000 $200.000 $280.000 $350.000 $275.000 $244.000 $400.000
FOUNDATION LOAD TEST (D4945) (PILE)
EA 2.000 $4,800.000 $10,000.000 $500.000 $40,000.000 $5,720.000 $5,600.000 $6,500.000
PRESTR CONC PIL (18 IN SQ)
LF 420.000 $220.000 $297.540 $310.000 $321.940 $319.000 $316.000 $300.000
DRILL SHAFT (30 IN)
LF 1,074.000 $210.000 $382.370 $250.000 $355.230 $352.000 $274.000 $580.000
CL C CONC (ABUT)
CY 133.700 $2,000.000 $1,250.000 $1,200.000 $1,100.000 $1,650.000 $1,100.000 $2,500.000
CL C CONC (CAP)
CY 8.900 $2,000.000 $2,500.000 $2,000.000 $1,500.000 $2,200.000 $3,300.000 $2,800.000
CL C CONC (MISC)
CY 48.000 $1,200.000 $1,250.000 $700.000 $1,000.000 $1,430.000 $1,100.000 $1,800.000
REINF CONC SLAB (BOX BEAM)
SF 8,970.000 $34.000 $22.000 $28.000 $25.000 $28.600 $31.000 $45.000
SHEAR KEY
CY 68.600 $750.000 $440.000 $700.000 $800.000 $440.000 $452.000 $650.000
PRESTR CONC BOX BEAM (4B20)
LF 694.000 $365.000 $305.000 $335.000 $319.680 $330.000 $385.000 $400.000
PRESTR CONC BOX BEAM (5B20)
LF 347.000 $355.000 $305.000 $335.000 $357.510 $363.000 $418.000 $400.000
PRESTR CONC BOX BEAM (4B28)
LF 298.000 $370.000 $305.000 $345.000 $352.990 $379.500 $377.000 $400.000
PRESTR CONC BOX BEAM (5B28)
LF 149.000 $365.000 $305.000 $345.000 $424.130 $467.500 $405.000 $400.000
PRESTR CONC BOX BEAM (4B34)
LF 378.000 $377.000 $305.000 $380.000 $392.860 $363.000 $378.000 $480.000
PRESTR CONC BOX BEAM (5B34)
LF 189.000 $377.000 $305.000 $385.000 $503.870 $440.000 $437.000 $480.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 653.000 $200.000 $160.000 $180.000 $190.000 $330.000 $152.000 $230.000
RAIL (TY T221)
LF 234.000 $165.000 $140.000 $185.000 $190.000 $187.000 $149.000 $250.000
RAIL (TY T223)
LF 352.000 $165.000 $140.000 $200.000 $190.000 $242.000 $147.000 $250.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 5.000 $23,000.000 $30,000.000 $10,000.000 $40,000.000 $11,000.000 $100,000.000 $45,000.000
MOBILIZATION
LS 1.000 $275,874.450 $280,397.710 $250,000.000 $270,000.000 $500,000.000 $410,000.000 $480,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $8,000.000 $1,500.000 $6,000.000 $1,751.400 $3,300.000 $19,100.000 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 420.000 $46.000 $47.000 $1.000 $40.000 $48.400 $44.000 $80.000
ROCK FILTER DAMS (REMOVE)
LF 420.000 $15.000 $15.000 $1.000 $1.000 $13.200 $12.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,548.000 $3.500 $5.000 $1.000 $4.000 $4.130 $3.750 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,548.000 $1.360 $1.000 $1.000 $1.000 $1.430 $1.300 $2.000
DRIVEWAYS (BASE)
SY 145.000 $25.000 $65.000 $50.000 $45.000 $33.000 $42.000 $40.000
MTL W-BEAM GD FEN (TIM POST)
LF 225.000 $35.000 $29.950 $25.000 $34.650 $25.300 $23.000 $32.000
MTL BEAM GD FEN TRANS (TL2)
EA 15.000 $2,000.000 $1,499.000 $1,250.000 $1,265.000 $1,127.500 $1,025.000 $1,500.000
SHORT RADIUS (28")
LF 12.500 $45.000 $65.000 $32.000 $35.200 $38.500 $35.000 $65.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $1,500.000 $1,499.000 $1,300.000 $1,375.000 $1,210.000 $1,100.000 $1,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $2,000.000 $3,169.000 $3,150.000 $3,465.000 $3,928.560 $3,000.000 $4,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $9,000.000 $14,844.000 $13,000.000 $13,310.000 $12,650.000 $15,000.000 $15,000.000
REMOVE AND INSTALL EXISTING GATE
EA 2.000 $3,000.000 $750.000 $800.000 $1,000.000 $1,100.000 $2,500.000 $1,400.000
WIRE FENCE (TY C)
LF 1,876.000 $16.000 $20.000 $20.000 $30.000 $22.000 $30.000 $25.000
WIRE FENCE (WATER GAP)
LF 435.000 $200.000 $40.000 $80.000 $40.000 $137.500 $60.000 $85.000
WIRE FENCE (REMOVE)
LF 2,431.000 $4.000 $3.000 $5.000 $2.000 $5.500 $5.000 $3.000
REMOVE SM RD SN SUP&AM
EA 8.000 $250.000 $100.000 $5.000 $250.000 $124.170 $146.510 $200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 24.000 $42.000 $20.000 $20.000 $19.800 $27.500 $25.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 44.000 $42.000 $30.000 $25.000 $27.500 $34.100 $31.000 $40.000
SPOT MOWING
AC 1.250 $50.000 $1,500.000 $100.000 $5,000.000 $2,200.000 $28.190 $2,000.000
Totals: $3,059,363.990 $2,804,230.390 $2,845,260.000 $3,179,305.730 $3,510,333.920 $4,158,432.698 $4,529,736.500
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $2,000.00