PREPARING ROW
|
STA
|
16.000
|
$3,500.000
|
$5,719.000
|
$8,000.000
|
$2,400.000
|
$2,900.000
|
$2,800.000
|
$2,900.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
27.000
|
$100.000
|
$385.520
|
$200.000
|
$250.000
|
$90.000
|
$150.000
|
$70.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
896.000
|
$8.500
|
$18.030
|
$65.000
|
$65.000
|
$70.000
|
$65.000
|
$29.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
577.000
|
$15.000
|
$33.050
|
$35.000
|
$30.000
|
$30.000
|
$29.000
|
$19.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
4,920.000
|
$8.000
|
$21.690
|
$30.000
|
$35.000
|
$20.000
|
$33.000
|
$29.000
|
|
|
BLOCK SODDING
|
SY
|
235.000
|
$3.500
|
$6.370
|
$6.000
|
$6.500
|
$13.750
|
$11.000
|
$9.500
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
32,081.500
|
$0.250
|
$0.100
|
$0.100
|
$0.100
|
$0.120
|
$0.250
|
$0.250
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
32,081.500
|
$0.250
|
$0.110
|
$0.100
|
$0.110
|
$0.150
|
$0.250
|
$0.250
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
64,163.000
|
$0.200
|
$0.120
|
$0.110
|
$0.120
|
$0.200
|
$0.350
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
539.000
|
$30.000
|
$38.680
|
$25.000
|
$22.000
|
$30.000
|
$30.000
|
$35.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
13,350.000
|
$1.750
|
$1.490
|
$1.000
|
$1.100
|
$1.550
|
$1.500
|
$1.200
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
13,350.000
|
$1.750
|
$1.490
|
$1.150
|
$1.250
|
$1.550
|
$1.500
|
$1.200
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY H)
|
SY
|
13,350.000
|
$1.750
|
$3.870
|
$3.200
|
$3.400
|
$4.100
|
$4.000
|
$3.500
|
|
|
PROOF ROLLING
|
HR
|
64.000
|
$100.000
|
$69.820
|
$150.000
|
$85.000
|
$110.000
|
$110.000
|
$70.000
|
|
|
CEMENT
|
TON
|
165.000
|
$152.000
|
$170.690
|
$160.000
|
$164.000
|
$210.000
|
$225.000
|
$165.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
16,672.000
|
$2.900
|
$4.250
|
$6.750
|
$7.500
|
$5.200
|
$7.500
|
$5.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
32,795.000
|
$3.000
|
$3.860
|
$2.250
|
$3.600
|
$3.250
|
$4.100
|
$4.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
8,220.000
|
$48.000
|
$29.000
|
$35.000
|
$49.000
|
$39.000
|
$41.000
|
$33.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
1,769.000
|
$2.500
|
$3.820
|
$3.000
|
$3.500
|
$11.650
|
$10.000
|
$4.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,759.000
|
$22.000
|
$42.440
|
$33.500
|
$58.000
|
$34.200
|
$45.000
|
$60.000
|
|
|
CL A CONC (FLUME)
|
CY
|
6.000
|
$500.000
|
$636.540
|
$675.000
|
$590.000
|
$900.000
|
$660.000
|
$775.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
20.000
|
$1,000.000
|
$318.270
|
$335.000
|
$750.000
|
$405.000
|
$350.000
|
$800.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
10.000
|
$400.000
|
$636.540
|
$675.000
|
$590.000
|
$950.000
|
$650.000
|
$700.000
|
|
|
RIPRAP (CONC)(CL C)
|
CY
|
3.900
|
$480.000
|
$689.580
|
$725.000
|
$640.000
|
$725.000
|
$700.000
|
$800.000
|
|
|
RIPRAP (STONE TY R)(DRY)(12 IN)
|
CY
|
41.000
|
$112.000
|
$212.180
|
$225.000
|
$140.000
|
$290.000
|
$225.000
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
73.000
|
$400.000
|
$636.540
|
$675.000
|
$590.000
|
$745.000
|
$660.000
|
$800.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
357.000
|
$60.000
|
$43.500
|
$45.750
|
$48.000
|
$49.500
|
$45.000
|
$50.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
28.000
|
$105.000
|
$59.410
|
$62.250
|
$110.000
|
$110.000
|
$62.000
|
$120.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
16.000
|
$650.000
|
$758.540
|
$685.000
|
$610.000
|
$775.000
|
$800.000
|
$650.000
|
|
|
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
|
LF
|
8.000
|
$750.000
|
$1,220.030
|
$1,175.000
|
$830.000
|
$1,350.000
|
$1,250.000
|
$750.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
16.000
|
$1,000.000
|
$1,299.590
|
$1,250.000
|
$1,200.000
|
$1,350.000
|
$1,350.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
140.000
|
$13.500
|
$79.570
|
$83.250
|
$95.000
|
$93.500
|
$82.000
|
$100.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
14.000
|
$250.000
|
$291.750
|
$306.000
|
$270.000
|
$400.000
|
$310.000
|
$200.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
2.000
|
$4,500.000
|
$3,925.300
|
$4,125.000
|
$3,800.000
|
$5,500.000
|
$4,100.000
|
$5,000.000
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
1.000
|
$10,500.000
|
$4,243.570
|
$4,450.000
|
$5,300.000
|
$7,250.000
|
$4,400.000
|
$5,500.000
|
|
|
WINGWALL (PW - 2) (HW=11 FT)
|
EA
|
2.000
|
$18,500.000
|
$24,798.350
|
$23,775.000
|
$29,000.000
|
$25,500.000
|
$26,000.000
|
$30,000.000
|
|
|
WINGWALL (PW - 2) (HW=12 FT)
|
EA
|
1.000
|
$20,000.000
|
$37,131.210
|
$35,600.000
|
$45,000.000
|
$38,000.000
|
$38,000.000
|
$45,000.000
|
|
|
WINGWALL (PW - 2) (HW=15 FT)
|
EA
|
1.000
|
$22,000.000
|
$70,549.310
|
$74,000.000
|
$90,000.000
|
$75,000.000
|
$75,000.000
|
$95,000.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
1.000
|
$15,000.000
|
$16,284.690
|
$13,750.000
|
$17,000.000
|
$16,500.000
|
$16,500.000
|
$15,000.000
|
|
|
HEADWALL (CH - PW - 0)(DIA= 24 IN)(MOD)
|
EA
|
1.000
|
$30,000.000
|
$91,236.700
|
$95,675.000
|
$122,000.000
|
$100,000.000
|
$98,000.000
|
$125,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
24.000
|
$1,150.000
|
$1,326.120
|
$1,175.000
|
$1,000.000
|
$1,250.000
|
$1,350.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
19.000
|
$500.000
|
$1,564.820
|
$1,300.000
|
$1,100.000
|
$1,400.000
|
$1,600.000
|
$1,300.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,225.000
|
$2,333.960
|
$2,450.000
|
$2,700.000
|
$3,150.000
|
$2,400.000
|
$2,900.000
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$5,000.000
|
$9,654.120
|
$7,900.000
|
$5,900.000
|
$8,600.000
|
$9,900.000
|
$6,300.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$2,000.000
|
$90.180
|
$4,500.000
|
$6,400.000
|
$4,750.000
|
$5,000.000
|
$6,900.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$750.000
|
$848.710
|
$900.000
|
$550.000
|
$1,125.000
|
$900.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
409.000
|
$20.000
|
$10.610
|
$12.000
|
$13.000
|
$15.000
|
$11.500
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$249,970.660
|
$300,000.000
|
$150,000.000
|
$290,000.000
|
$380,000.000
|
$340,000.000
|
$380,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$6,000.000
|
$1,500.000
|
$25,000.000
|
$8,000.000
|
$7,300.000
|
$7,500.000
|
$28,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,160.000
|
$25.000
|
$40.310
|
$42.250
|
$35.000
|
$45.000
|
$28.000
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,160.000
|
$7.000
|
$10.610
|
$12.000
|
$4.000
|
$12.000
|
$8.000
|
$8.000
|
|
|
TEMP PAVED FLUME (INSTALL)
|
SY
|
234.000
|
$25.000
|
$20.160
|
$57.500
|
$50.000
|
$22.000
|
$25.000
|
$45.000
|
|
|
TEMP PAVED FLUME (REMOVE)
|
SY
|
234.000
|
$5.000
|
$10.610
|
$10.000
|
$12.000
|
$11.150
|
$14.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,000.000
|
$3.000
|
$3.180
|
$3.000
|
$3.000
|
$3.400
|
$3.000
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,000.000
|
$0.800
|
$1.060
|
$1.000
|
$1.000
|
$1.150
|
$0.900
|
$0.700
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,090.000
|
$3.000
|
$6.370
|
$3.200
|
$3.500
|
$6.750
|
$4.500
|
$4.600
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,090.000
|
$0.800
|
$1.060
|
$0.600
|
$0.600
|
$1.150
|
$0.900
|
$0.800
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
180.000
|
$30.000
|
$79.570
|
$135.000
|
$100.000
|
$100.000
|
$120.000
|
$30.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
180.000
|
$8.000
|
$31.830
|
$30.000
|
$15.000
|
$40.000
|
$33.000
|
$20.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
942.000
|
$32.000
|
$27.000
|
$38.000
|
$41.000
|
$30.000
|
$76.000
|
$39.000
|
|
|
TURNOUTS (ACP)
|
SY
|
189.000
|
$20.000
|
$35.000
|
$36.000
|
$56.000
|
$70.000
|
$135.000
|
$69.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
3,973.000
|
$24.000
|
$16.000
|
$24.000
|
$18.000
|
$16.500
|
$29.000
|
$19.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
37,800.000
|
$0.170
|
$0.170
|
$0.330
|
$0.200
|
$0.250
|
$0.200
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
18,900.000
|
$0.270
|
$0.170
|
$0.330
|
$0.350
|
$0.330
|
$0.400
|
$0.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
725.000
|
$22.000
|
$22.010
|
$23.000
|
$25.000
|
$24.000
|
$24.000
|
$21.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,800.000
|
$1,613.620
|
$2,000.000
|
$2,200.000
|
$3,100.000
|
$2,000.000
|
$2,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
225.000
|
$2.500
|
$3.180
|
$4.000
|
$4.000
|
$9.600
|
$3.400
|
$3.200
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$250.000
|
$259.920
|
$400.000
|
$450.000
|
$1,675.000
|
$340.000
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$2,750.000
|
$2,705.270
|
$1,500.000
|
$1,600.000
|
$3,000.000
|
$3,200.000
|
$2,700.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$350.000
|
$371.310
|
$400.000
|
$450.000
|
$750.000
|
$380.000
|
$400.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$822.190
|
$2,000.000
|
$2,500.000
|
$1,850.000
|
$1,400.000
|
$800.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$9,000.000
|
$8,142.350
|
$10,000.000
|
$12,000.000
|
$10,500.000
|
$11,000.000
|
$12,000.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
4.000
|
$200.000
|
$248.250
|
$350.000
|
$210.000
|
$600.000
|
$240.000
|
$250.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
3.000
|
$275.000
|
$258.860
|
$350.000
|
$250.000
|
$750.000
|
$280.000
|
$250.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
3.000
|
$550.000
|
$775.510
|
$715.000
|
$660.000
|
$770.000
|
$750.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
19.000
|
$800.000
|
$582.430
|
$825.000
|
$580.000
|
$650.000
|
$650.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
14.000
|
$800.000
|
$688.520
|
$900.000
|
$720.000
|
$750.000
|
$820.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
3.000
|
$800.000
|
$792.490
|
$1,100.000
|
$900.000
|
$850.000
|
$950.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
37.000
|
$95.000
|
$81.690
|
$100.000
|
$95.000
|
$125.000
|
$110.000
|
$80.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
18.000
|
$20.000
|
$40.310
|
$20.000
|
$22.000
|
$43.000
|
$21.000
|
$40.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
20.000
|
$80.000
|
$89.120
|
$140.000
|
$85.000
|
$100.000
|
$145.000
|
$90.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,056.000
|
$1.500
|
$1.000
|
$1.500
|
$0.600
|
$1.200
|
$2.000
|
$0.850
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
39,520.000
|
$0.350
|
$0.420
|
$0.400
|
$0.420
|
$0.450
|
$0.450
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,000.000
|
$0.400
|
$0.420
|
$1.000
|
$0.420
|
$1.100
|
$1.100
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
35,352.000
|
$0.350
|
$0.420
|
$0.400
|
$0.420
|
$0.450
|
$0.450
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
16.000
|
$14.000
|
$36.070
|
$20.000
|
$36.000
|
$23.000
|
$23.000
|
$26.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
488.000
|
$3.250
|
$4.770
|
$4.000
|
$5.000
|
$4.450
|
$4.500
|
$5.000
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
3,399.000
|
$84.000
|
$80.000
|
$75.000
|
$120.000
|
$106.000
|
$100.000
|
$95.000
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
7,492.000
|
$84.000
|
$82.000
|
$90.000
|
$95.000
|
$112.000
|
$98.000
|
$103.000
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
938.000
|
$100.000
|
$100.000
|
$110.000
|
$117.000
|
$135.000
|
$110.000
|
$92.000
|
|
|
TACK COAT
|
GAL
|
3,097.000
|
$1.250
|
$3.970
|
$3.000
|
$3.500
|
$3.500
|
$3.300
|
$6.000
|
|
|
TMA (STATIONARY)
|
DAY
|
175.000
|
$250.000
|
$250.920
|
$450.000
|
$175.000
|
$230.000
|
$230.000
|
$100.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
5.000
|
$250.000
|
$1,809.110
|
$600.000
|
$600.000
|
$115.000
|
$750.000
|
$500.000
|
|
Totals: |
$2,901,997.260
|
$3,163,722.227
|
$3,509,926.030
|
$3,780,003.515
|
$3,831,999.955
|
$3,865,398.300
|
$3,893,331.250
|