RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
|
SY
|
177.000
|
$20.000
|
$15.000
|
$27.000
|
$75.000
|
$14.270
|
$15.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
8,015.000
|
$23.000
|
$24.000
|
$49.000
|
$30.000
|
$28.950
|
$45.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
259.000
|
$33.000
|
$65.000
|
$41.000
|
$100.000
|
$40.160
|
$60.000
|
|
|
EMBANK (FNL)(OC)(TY B)
|
CY
|
8,306.000
|
$25.000
|
$33.000
|
$50.000
|
$37.200
|
$41.060
|
$60.000
|
|
|
STRAW/HAY MLCH SEED(PERM_RURAL_CLAY)
|
SY
|
100,423.000
|
$0.400
|
$0.240
|
$0.250
|
$0.200
|
$0.240
|
$0.240
|
|
|
STRAW/HAY MLCH SEED (TEMP_WARM)
|
SY
|
50,217.000
|
$0.450
|
$0.250
|
$0.150
|
$0.100
|
$0.250
|
$0.250
|
|
|
STRAW/HAY MLCH SEED (TEMP_COOL)
|
SY
|
50,217.000
|
$0.450
|
$0.370
|
$0.150
|
$0.100
|
$0.370
|
$0.380
|
|
|
VEGETATIVE WATERING
|
TGL
|
150.000
|
$36.000
|
$80.000
|
$125.000
|
$125.000
|
$1.000
|
$45.000
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
202.000
|
$350.000
|
$342.000
|
$300.000
|
$360.000
|
$394.820
|
$375.000
|
|
|
LIME TRT (SUBGRADE) (11")
|
SY
|
6,812.000
|
$10.000
|
$19.000
|
$11.000
|
$15.000
|
$19.490
|
$11.000
|
|
|
CEMENT
|
TON
|
766.000
|
$225.000
|
$250.000
|
$500.000
|
$250.000
|
$271.990
|
$410.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
47,023.000
|
$4.000
|
$3.650
|
$4.000
|
$7.000
|
$6.980
|
$6.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
11,012.000
|
$7.250
|
$3.500
|
$1.000
|
$5.000
|
$6.730
|
$11.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
12,113.000
|
$100.000
|
$101.000
|
$90.000
|
$137.000
|
$138.530
|
$136.000
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
23,902.000
|
$110.000
|
$114.000
|
$110.000
|
$115.000
|
$112.000
|
$141.000
|
|
|
TACK COAT
|
GAL
|
37,201.000
|
$3.500
|
$3.000
|
$1.000
|
$0.100
|
$3.040
|
$7.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
12,438.000
|
$60.000
|
$55.000
|
$60.000
|
$25.000
|
$68.840
|
$100.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2.25")
|
SY
|
3,384.000
|
$5.500
|
$6.750
|
$2.750
|
$3.500
|
$14.810
|
$4.000
|
|
|
CUT & RESTORING PAV
|
SY
|
242.000
|
$100.000
|
$110.000
|
$60.000
|
$45.000
|
$73.400
|
$95.000
|
|
|
CEM STABIL BKFL
|
CY
|
537.000
|
$221.000
|
$225.000
|
$320.000
|
$250.000
|
$250.000
|
$260.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
479.000
|
$18.000
|
$1.000
|
$15.000
|
$15.000
|
$15.000
|
$16.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,253.000
|
$36.000
|
$30.000
|
$41.000
|
$45.000
|
$45.000
|
$45.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
50.000
|
$700.000
|
$790.000
|
$600.000
|
$700.000
|
$600.000
|
$620.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
215.000
|
$710.000
|
$730.000
|
$1,200.000
|
$650.000
|
$650.000
|
$700.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
211.000
|
$229.000
|
$325.000
|
$320.000
|
$200.000
|
$172.500
|
$160.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
65.000
|
$400.000
|
$220.000
|
$350.000
|
$350.000
|
$350.000
|
$370.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
64.000
|
$735.000
|
$260.000
|
$380.000
|
$405.000
|
$405.000
|
$430.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
24.000
|
$1,000.000
|
$730.000
|
$800.000
|
$980.000
|
$980.000
|
$1,000.000
|
|
|
CONC BOX CULV (7 FT X 6 FT)(EXTEND)
|
LF
|
40.000
|
$1,500.000
|
$1,350.000
|
$1,300.000
|
$1,400.000
|
$1,400.000
|
$1,500.000
|
|
|
CONC BOX CULV (5 FT X 6 FT) (EXTEND)
|
LF
|
21.000
|
$1,100.000
|
$1,250.000
|
$1,500.000
|
$1,350.000
|
$1,350.000
|
$1,450.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
317.000
|
$90.000
|
$48.000
|
$70.000
|
$95.000
|
$95.000
|
$100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,883.000
|
$90.000
|
$54.000
|
$70.000
|
$100.000
|
$100.000
|
$110.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
806.000
|
$110.000
|
$75.000
|
$100.000
|
$110.000
|
$110.000
|
$116.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
226.000
|
$150.000
|
$101.000
|
$150.000
|
$185.000
|
$185.000
|
$200.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
56.000
|
$200.000
|
$145.000
|
$200.000
|
$195.000
|
$195.000
|
$210.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
4.000
|
$9,000.000
|
$5,400.000
|
$8,000.000
|
$9,500.000
|
$9,500.000
|
$10,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$14,000.000
|
$10,000.000
|
$11,000.000
|
$16,500.000
|
$16,500.000
|
$17,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 60 IN)
|
EA
|
1.000
|
$19,000.000
|
$24,000.000
|
$39,000.000
|
$44,500.000
|
$44,500.000
|
$47,000.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
1.000
|
$8,000.000
|
$5,200.000
|
$12,000.000
|
$4,950.000
|
$4,950.000
|
$5,200.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
1.000
|
$9,800.000
|
$7,000.000
|
$10,000.000
|
$7,650.000
|
$7,650.000
|
$8,000.000
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
2.000
|
$21,000.000
|
$24,000.000
|
$37,000.000
|
$28,012.000
|
$28,012.500
|
$29,000.000
|
|
|
WINGWALL (FW - S) (HW=10 FT)
|
EA
|
2.000
|
$18,360.000
|
$45,000.000
|
$55,000.000
|
$56,025.000
|
$56,025.000
|
$59,000.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
1.000
|
$15,260.000
|
$8,000.000
|
$14,000.000
|
$9,500.000
|
$9,500.000
|
$10,000.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
2.000
|
$18,000.000
|
$13,000.000
|
$24,000.000
|
$17,500.000
|
$17,500.000
|
$19,000.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
2.000
|
$23,000.000
|
$23,000.000
|
$36,000.000
|
$28,900.000
|
$28,900.000
|
$30,000.000
|
|
|
WINGWALL (SW - 0) (HW=3 FT)
|
EA
|
1.000
|
$12,000.000
|
$6,000.000
|
$10,000.000
|
$6,500.000
|
$6,500.000
|
$6,900.000
|
|
|
SET (TY I) (24 IN) (3: 1) (C)
|
EA
|
3.000
|
$3,000.000
|
$3,000.000
|
$1,600.000
|
$1,000.000
|
$1,300.000
|
$1,400.000
|
|
|
SET (TY I) (24 IN) (4: 1) (C)
|
EA
|
10.000
|
$2,500.000
|
$3,800.000
|
$1,600.000
|
$1,000.000
|
$1,340.000
|
$1,410.000
|
|
|
SET (TY I) (24 IN) (6: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$4,400.000
|
$1,800.000
|
$1,000.000
|
$1,400.000
|
$1,490.000
|
|
|
SET (TY I) (30 IN) (4: 1) (C)
|
EA
|
6.000
|
$3,500.000
|
$7,200.000
|
$6,500.000
|
$1,500.000
|
$2,170.000
|
$2,300.000
|
|
|
SET (TY I) (36 IN) (4: 1) (C)
|
EA
|
1.000
|
$5,000.000
|
$8,500.000
|
$7,000.000
|
$2,500.000
|
$3,250.000
|
$3,400.000
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
20.000
|
$1,400.000
|
$1,000.000
|
$1,900.000
|
$1,400.000
|
$1,040.000
|
$1,100.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
96.000
|
$1,000.000
|
$1,100.000
|
$2,000.000
|
$1,500.000
|
$1,200.000
|
$1,300.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,200.000
|
$1,400.000
|
$2,200.000
|
$1,700.000
|
$1,400.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,500.000
|
$1,750.000
|
$2,100.000
|
$1,600.000
|
$1,340.000
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$1,400.000
|
$2,300.000
|
$1,700.000
|
$1,400.000
|
$1,500.000
|
|
|
SET (REMOV & REINSTALL)
|
EA
|
2.000
|
$1,000.000
|
$1,000.000
|
$1,900.000
|
$1,000.000
|
$1,000.000
|
$1,100.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$2,500.000
|
$2,000.000
|
$5,000.000
|
$2,500.000
|
$3,279.250
|
$2,600.000
|
|
|
REMOV STR (SET)
|
EA
|
86.000
|
$400.000
|
$150.000
|
$180.000
|
$500.000
|
$500.000
|
$530.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
8.000
|
$1,200.000
|
$900.000
|
$7,000.000
|
$750.000
|
$750.000
|
$790.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
8.000
|
$1,400.000
|
$1,000.000
|
$230.000
|
$750.000
|
$750.000
|
$790.000
|
|
|
REMOV STR (PIPE)
|
LF
|
2,463.000
|
$15.000
|
$10.000
|
$36.000
|
$12.000
|
$12.000
|
$13.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$930,000.000
|
$700,000.000
|
$1,200,000.000
|
$1,100,000.000
|
$1,184,145.000
|
$900,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
25.000
|
$6,000.000
|
$22,000.000
|
$10,000.000
|
$45,000.000
|
$35,500.000
|
$25,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$16,500.000
|
$17,000.000
|
$15,000.000
|
$20,000.000
|
$30,480.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
300.000
|
$250.000
|
$300.000
|
$50.000
|
$1.000
|
$221.940
|
$270.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$500.000
|
$715.000
|
$150.000
|
$1.000
|
$221.940
|
$270.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
660.000
|
$36.000
|
$26.000
|
$26.000
|
$26.000
|
$26.000
|
$27.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
660.000
|
$12.500
|
$19.000
|
$11.000
|
$10.000
|
$17.650
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
11,435.000
|
$4.500
|
$3.000
|
$3.000
|
$2.000
|
$3.000
|
$3.200
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
11,435.000
|
$1.250
|
$1.000
|
$1.000
|
$0.500
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
4,405.000
|
$5.000
|
$3.000
|
$3.000
|
$3.000
|
$3.000
|
$3.200
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,405.000
|
$1.000
|
$1.000
|
$1.000
|
$0.500
|
$1.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
6,675.000
|
$60.000
|
$85.000
|
$50.000
|
$40.000
|
$117.970
|
$65.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
240.000
|
$120.000
|
$79.000
|
$25.000
|
$125.000
|
$20.000
|
$120.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
7,440.000
|
$15.000
|
$25.000
|
$10.000
|
$22.000
|
$10.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
240.000
|
$20.000
|
$21.000
|
$10.000
|
$60.000
|
$20.000
|
$100.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,492.000
|
$55.000
|
$36.000
|
$70.000
|
$50.000
|
$70.610
|
$75.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
9,847.000
|
$18.000
|
$12.000
|
$17.000
|
$20.000
|
$15.080
|
$30.000
|
|
|
TURNOUTS (ACP)
|
SY
|
498.000
|
$65.000
|
$95.000
|
$36.000
|
$75.000
|
$63.070
|
$82.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
89,140.000
|
$0.150
|
$0.220
|
$0.050
|
$0.180
|
$0.240
|
$0.250
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
44,570.000
|
$0.150
|
$0.260
|
$0.050
|
$0.220
|
$0.280
|
$0.300
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,700.000
|
$21.500
|
$26.000
|
$26.000
|
$22.000
|
$25.000
|
$22.000
|
|
|
MTL BM GD FEN TRANS (31"-28")(25')
|
EA
|
12.000
|
$800.000
|
$920.000
|
$900.000
|
$1,000.000
|
$900.000
|
$650.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
625.000
|
$2.000
|
$5.000
|
$5.000
|
$2.500
|
$2.500
|
$3.200
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
12.000
|
$200.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
$320.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
14.000
|
$2,700.000
|
$2,925.000
|
$3,000.000
|
$3,100.000
|
$3,150.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
56.000
|
$1,100.000
|
$1,440.000
|
$500.000
|
$1,400.000
|
$1,440.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,500.000
|
$1,030.000
|
$500.000
|
$2,000.000
|
$1,030.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$7,907.000
|
$7,155.000
|
$7,500.000
|
$11,000.000
|
$7,155.000
|
$8,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
22.000
|
$295.000
|
$190.000
|
$190.000
|
$285.000
|
$335.000
|
$300.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
2.000
|
$297.000
|
$220.000
|
$220.000
|
$315.000
|
$385.000
|
$330.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
17.000
|
$835.000
|
$550.000
|
$600.000
|
$715.000
|
$815.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,360.000
|
$700.000
|
$700.000
|
$800.000
|
$910.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
26.000
|
$500.000
|
$310.000
|
$310.000
|
$515.000
|
$565.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
24.000
|
$530.000
|
$370.000
|
$370.000
|
$555.000
|
$635.000
|
$580.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
68.000
|
$165.000
|
$80.000
|
$80.000
|
$80.000
|
$120.000
|
$83.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
36.000
|
$30.000
|
$50.000
|
$50.000
|
$25.000
|
$22.000
|
$33.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
65.000
|
$92.000
|
$65.000
|
$70.000
|
$55.000
|
$105.000
|
$58.000
|
|
|
INSTL OM ASSM (OM-3L)(TWT)GND
|
EA
|
6.000
|
$230.000
|
$275.000
|
$280.000
|
$300.000
|
$495.000
|
$310.000
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
6.000
|
$230.000
|
$275.000
|
$280.000
|
$300.000
|
$495.000
|
$310.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
62.000
|
$20.000
|
$25.000
|
$25.000
|
$25.000
|
$35.000
|
$30.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
44,570.000
|
$1.250
|
$0.800
|
$0.250
|
$0.970
|
$0.800
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
89,140.000
|
$0.850
|
$0.800
|
$0.250
|
$0.970
|
$0.800
|
$0.600
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
41.000
|
$10.000
|
$15.000
|
$7.000
|
$13.000
|
$15.000
|
$16.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
92,760.000
|
$0.600
|
$0.700
|
$0.500
|
$0.530
|
$0.700
|
$0.750
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
4,470.000
|
$0.550
|
$0.700
|
$0.500
|
$0.600
|
$0.700
|
$0.750
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
70,745.000
|
$0.600
|
$0.700
|
$0.500
|
$0.530
|
$0.700
|
$0.750
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,047.000
|
$5.000
|
$4.750
|
$4.000
|
$4.500
|
$4.750
|
$5.000
|
|
|
SPOT TREE TRIMMING / BRUSH REMOVAL
|
LF
|
950.000
|
$116.000
|
$26.250
|
$50.000
|
$7.000
|
$8.500
|
$9.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
1.000
|
$600.000
|
$500.000
|
$2,500.000
|
$1,000.000
|
$700.000
|
$2,200.000
|
|
|
STEEL FENCE (REMOVE)
|
LF
|
287.000
|
$50.000
|
$48.000
|
$19.000
|
$50.000
|
$7.000
|
$10.000
|
|
|
STEEL FENCE (INSTALL)
|
LF
|
198.000
|
$100.000
|
$129.000
|
$90.000
|
$125.000
|
$68.190
|
$60.000
|
|
Totals: |
$10,216,776.750
|
$10,432,735.260
|
$10,852,493.350
|
$11,534,298.250
|
$12,581,895.860
|
$13,426,992.480
|