REMOVING CONC (MISC)
|
SY
|
0.400
|
$250.000
|
$2,674.000
|
$750.000
|
$2,000.000
|
$150.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
7,429.000
|
$9.000
|
$8.190
|
$27.000
|
$12.000
|
$17.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
66.000
|
$250.000
|
$517.000
|
$800.000
|
$500.000
|
$633.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
515.000
|
$10.000
|
$26.000
|
$16.000
|
$45.000
|
$35.000
|
|
|
BACKFILL (TY B)
|
STA
|
433.500
|
$170.000
|
$186.000
|
$235.000
|
$300.000
|
$245.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
48,278.000
|
$0.110
|
$0.410
|
$0.120
|
$0.090
|
$0.130
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
48,278.000
|
$0.110
|
$0.410
|
$0.120
|
$0.090
|
$0.130
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
96,555.000
|
$0.140
|
$0.510
|
$0.150
|
$0.130
|
$0.160
|
|
|
VEGETATIVE WATERING
|
MG
|
811.000
|
$20.000
|
$36.000
|
$30.000
|
$10.000
|
$30.000
|
|
|
CEMENT
|
TON
|
310.000
|
$145.000
|
$206.150
|
$150.000
|
$175.000
|
$175.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
28,744.000
|
$3.000
|
$1.910
|
$4.250
|
$6.000
|
$3.500
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
4,857.700
|
$65.000
|
$75.000
|
$67.000
|
$85.000
|
$85.000
|
|
|
SUPERPAVE MIXTURES SP-D PG70-22
|
TON
|
14,201.400
|
$80.000
|
$80.000
|
$85.000
|
$95.000
|
$117.800
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
2,372.800
|
$25.000
|
$30.420
|
$33.000
|
$45.000
|
$38.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,218.000
|
$3.500
|
$7.160
|
$3.000
|
$8.000
|
$5.250
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
110.000
|
$600.000
|
$567.000
|
$575.000
|
$575.000
|
$600.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
184.000
|
$50.000
|
$73.680
|
$67.000
|
$44.000
|
$46.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,257.000
|
$50.000
|
$78.950
|
$78.000
|
$47.250
|
$52.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
482.000
|
$85.000
|
$126.310
|
$100.000
|
$92.000
|
$96.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
72.000
|
$125.000
|
$173.680
|
$150.000
|
$150.000
|
$153.000
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$610.000
|
$894.730
|
$1,000.000
|
$680.000
|
$760.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
82.000
|
$800.000
|
$947.360
|
$1,125.000
|
$735.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
30.000
|
$1,100.000
|
$1,052.620
|
$1,350.000
|
$840.000
|
$900.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,200.000
|
$3,684.160
|
$3,005.000
|
$2,100.000
|
$2,150.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,270.000
|
$15.750
|
$15.790
|
$17.000
|
$21.000
|
$23.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$271,015.560
|
$330,000.000
|
$185,000.000
|
$230,000.000
|
$422,251.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$6,000.000
|
$6,500.000
|
$25,000.000
|
$18,550.000
|
$34,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
11,827.000
|
$2.500
|
$2.110
|
$1.700
|
$1.900
|
$2.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
11,827.000
|
$0.750
|
$0.460
|
$0.400
|
$0.750
|
$0.410
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
4,555.000
|
$4.500
|
$3.660
|
$3.000
|
$3.200
|
$3.850
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,555.000
|
$1.000
|
$0.740
|
$0.600
|
$0.500
|
$0.550
|
|
|
DRIVEWAYS (CONC)
|
SY
|
149.000
|
$80.000
|
$105.930
|
$150.000
|
$100.000
|
$133.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
827.000
|
$30.000
|
$24.610
|
$22.000
|
$40.000
|
$40.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
8,887.000
|
$17.000
|
$23.780
|
$14.750
|
$14.500
|
$21.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
86,578.000
|
$0.200
|
$0.090
|
$0.140
|
$0.170
|
$0.140
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
43,608.000
|
$0.200
|
$0.090
|
$0.140
|
$0.170
|
$0.140
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,050.000
|
$22.000
|
$19.470
|
$19.250
|
$20.000
|
$25.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,575.000
|
$2,368.390
|
$2,350.000
|
$2,730.000
|
$2,800.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
33.000
|
$250.000
|
$236.840
|
$240.000
|
$231.000
|
$245.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
7.000
|
$275.000
|
$300.000
|
$300.000
|
$265.000
|
$275.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
3.000
|
$350.000
|
$421.050
|
$425.000
|
$410.000
|
$425.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$700.000
|
$447.360
|
$450.000
|
$488.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$750.000
|
$499.990
|
$500.000
|
$690.000
|
$710.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$800.000
|
$578.940
|
$575.000
|
$800.000
|
$810.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
21.000
|
$375.000
|
$405.260
|
$400.000
|
$365.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
15.000
|
$425.000
|
$421.050
|
$425.000
|
$395.000
|
$425.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
18.000
|
$175.000
|
$68.420
|
$20.000
|
$94.000
|
$125.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
44.000
|
$75.000
|
$89.470
|
$90.000
|
$94.000
|
$135.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
24.000
|
$75.000
|
$89.470
|
$90.000
|
$94.000
|
$135.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,762.000
|
$1.000
|
$3.170
|
$1.750
|
$0.600
|
$1.250
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
86,578.000
|
$0.280
|
$0.380
|
$0.360
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
29,185.000
|
$0.300
|
$0.440
|
$0.420
|
$0.470
|
$0.480
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
29,049.000
|
$0.280
|
$0.380
|
$0.360
|
$0.400
|
$0.400
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
222.000
|
$12.000
|
$13.160
|
$12.500
|
$15.000
|
$13.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,070.000
|
$3.000
|
$3.740
|
$3.550
|
$3.450
|
$4.000
|
|
|
TMA (STATIONARY)
|
DAY
|
105.000
|
$200.000
|
$245.000
|
$400.000
|
$290.000
|
$365.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
96.000
|
$100.000
|
$419.000
|
$825.000
|
$300.000
|
$365.000
|
|
Totals: |
$2,940,968.930
|
$3,337,756.506
|
$3,477,973.680
|
$3,550,832.560
|
$4,242,651.860
|