|
|
BACKFILL (TY A)
|
STA
|
54.000
|
$600.000
|
$397.270
|
$284.000
|
$325.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
19,723.000
|
$4.250
|
$4.180
|
$3.000
|
$4.500
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
475.000
|
$146.000
|
$170.160
|
$150.000
|
$335.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(18")
|
SY
|
14,000.000
|
$132.000
|
$108.000
|
$149.800
|
$135.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
68,635.000
|
$2.100
|
$1.000
|
$2.750
|
$2.350
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
2.000
|
$561.000
|
$3,948.860
|
$2,000.000
|
$3,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$364,157.180
|
$343,131.000
|
$50,000.000
|
$320,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$7,000.000
|
$1,476.640
|
$1,500.000
|
$35,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
232.000
|
$5.300
|
$6.780
|
$3.150
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
232.000
|
$1.910
|
$2.070
|
$1.600
|
$4.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
4,334.000
|
$35.000
|
$23.670
|
$35.400
|
$27.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,671.000
|
$35.000
|
$25.110
|
$33.500
|
$53.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
75.000
|
$27.500
|
$30.640
|
$26.000
|
$30.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
117.000
|
$3.000
|
$3.530
|
$3.000
|
$3.400
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,212.000
|
$3,414.880
|
$2,900.000
|
$3,300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$396.000
|
$176.630
|
$150.000
|
$168.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
35.000
|
$22.000
|
$64.770
|
$24.000
|
$58.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
24.000
|
$48.000
|
$58.880
|
$50.000
|
$53.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$550.000
|
$647.650
|
$460.000
|
$583.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
26.000
|
$720.000
|
$765.400
|
$625.000
|
$690.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,088.000
|
$1,177.550
|
$845.000
|
$105.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
44.000
|
$78.000
|
$35.330
|
$65.000
|
$570.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
7,973.000
|
$0.340
|
$0.410
|
$0.280
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
42,696.000
|
$0.300
|
$0.410
|
$0.280
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
4,161.000
|
$2.450
|
$4.710
|
$1.550
|
$4.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
60.000
|
$64.000
|
$123.640
|
$65.000
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
|
EA
|
6.000
|
$105.000
|
$141.310
|
$85.000
|
$95.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
27.000
|
$86.000
|
$153.080
|
$65.000
|
$85.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
7,910.000
|
$0.300
|
$0.410
|
$0.280
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
69,594.000
|
$0.270
|
$0.410
|
$0.280
|
$0.300
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
993.000
|
$1.050
|
$1.300
|
$1.100
|
$0.950
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,387.000
|
$6.910
|
$7.070
|
$6.000
|
$6.800
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
2,688.000
|
$0.860
|
$0.880
|
$1.550
|
$0.800
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
2,658.000
|
$0.680
|
$0.730
|
$0.550
|
$0.600
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
11,544.000
|
$0.540
|
$0.730
|
$0.550
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
2,637.000
|
$0.910
|
$0.730
|
$0.600
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
23,198.000
|
$0.490
|
$0.730
|
$0.600
|
$0.600
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
20.000
|
$202.000
|
$322.860
|
$225.000
|
$238.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$418.000
|
$386.180
|
$550.000
|
$424.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
9.000
|
$243.000
|
$338.210
|
$335.000
|
$318.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
191.000
|
$5.610
|
$7.070
|
$5.000
|
$5.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
815.000
|
$5.660
|
$7.070
|
$5.000
|
$5.300
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
42,725.000
|
$0.030
|
$0.010
|
$0.010
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
993.000
|
$0.060
|
$0.010
|
$0.020
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,387.000
|
$0.190
|
$0.010
|
$0.050
|
$2.100
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
20.000
|
$6.500
|
$0.010
|
$5.000
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$9.200
|
$0.010
|
$15.000
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
9.000
|
$10.250
|
$0.010
|
$5.000
|
$11.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
6,778.000
|
$150.000
|
$139.820
|
$138.000
|
$140.000
|
|
|
TACK COAT
|
GAL
|
6,778.000
|
$3.200
|
$2.560
|
$0.010
|
$3.700
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
32.000
|
$59.000
|
$96.370
|
$130.000
|
$250.000
|
|
|
TMA (STATIONARY)
|
DAY
|
9.000
|
$193.000
|
$500.000
|
$450.000
|
$750.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
16.000
|
$118.000
|
$25.000
|
$85.000
|
$100.000
|
|
Totals: |
$4,005,728.010
|
$3,455,793.590
|
$3,816,130.380
|
$4,216,319.900
|