|
|
PREPARING ROW
|
STA
|
37.990
|
$1,700.000
|
$150.000
|
$450.000
|
$300.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,020.000
|
$9.750
|
$15.000
|
$22.500
|
$20.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
37.990
|
$750.000
|
$100.000
|
$400.000
|
$1,200.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
314.000
|
$20.000
|
$10.000
|
$26.750
|
$16.000
|
|
|
BACKFILL (TY A)
|
STA
|
37.990
|
$220.000
|
$244.000
|
$350.000
|
$350.000
|
|
|
BLOCK SODDING
|
SY
|
8,125.000
|
$2.800
|
$4.000
|
$4.000
|
$3.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
8,125.000
|
$0.150
|
$0.330
|
$0.320
|
$0.850
|
|
|
FERTILIZER
|
AC
|
3.400
|
$700.000
|
$867.000
|
$850.000
|
$800.000
|
|
|
VEGETATIVE WATERING
|
MG
|
402.900
|
$17.500
|
$10.000
|
$5.000
|
$27.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
1,208.000
|
$65.000
|
$65.000
|
$75.000
|
$79.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (4 TO 8")
|
SY
|
2,842.000
|
$3.000
|
$4.000
|
$5.500
|
$5.000
|
|
|
PRIME COAT & BLOTTER (MC-30)
|
GAL
|
5,421.000
|
$4.500
|
$3.500
|
$0.500
|
$4.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
8,386.000
|
$4.000
|
$2.300
|
$2.750
|
$2.750
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
210.000
|
$100.000
|
$94.000
|
$112.000
|
$165.000
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
2,690.000
|
$85.000
|
$71.000
|
$72.000
|
$88.000
|
|
|
D-GR HMA TY-D PG 70-22 (LEVEL-UP)
|
TON
|
2,690.000
|
$75.000
|
$71.000
|
$72.000
|
$73.250
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,097.000
|
$25.000
|
$49.000
|
$36.000
|
$30.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,564.000
|
$25.000
|
$2.500
|
$1.500
|
$3.750
|
|
|
PLANE ASPH CONC PAV(2" TO 4")
|
SY
|
19,516.000
|
$2.600
|
$2.350
|
$1.500
|
$2.500
|
|
|
CEM STABIL BKFL
|
CY
|
106.000
|
$40.000
|
$127.000
|
$125.000
|
$134.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
70.000
|
$500.000
|
$500.000
|
$500.000
|
$535.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
131.000
|
$125.000
|
$295.000
|
$290.000
|
$310.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
32.000
|
$60.000
|
$76.000
|
$75.000
|
$80.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
8.000
|
$60.000
|
$153.000
|
$150.000
|
$160.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
2.000
|
$11,000.000
|
$3,570.000
|
$3,500.000
|
$3,800.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
1.000
|
$11,000.000
|
$5,100.000
|
$5,000.000
|
$5,300.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
1.000
|
$12,000.000
|
$6,120.000
|
$6,000.000
|
$6,400.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
5.000
|
$500.000
|
$510.000
|
$1,250.000
|
$1,350.000
|
|
|
REMOV STR (SET)
|
EA
|
5.000
|
$1,000.000
|
$1,020.000
|
$500.000
|
$525.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,200.000
|
$1,020.000
|
$1,000.000
|
$1,100.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
112.000
|
$40.000
|
$76.000
|
$75.000
|
$80.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$150,000.000
|
$29,000.000
|
$65,000.000
|
$130,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$4,200.000
|
$600.000
|
$4,000.000
|
$3,700.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
3,741.000
|
$5.500
|
$2.000
|
$2.000
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
646.000
|
$6.000
|
$3.500
|
$3.500
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
646.000
|
$1.000
|
$1.000
|
$1.000
|
$2.500
|
|
|
INTERSECTIONS (ACP)
|
SY
|
637.000
|
$70.000
|
$35.000
|
$28.300
|
$24.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
616.000
|
$75.000
|
$100.000
|
$100.000
|
$65.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,001.000
|
$70.000
|
$37.000
|
$28.300
|
$33.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
612.500
|
$25.000
|
$20.000
|
$19.450
|
$21.000
|
|
|
SHORT RADIUS
|
LF
|
200.000
|
$50.000
|
$25.550
|
$25.050
|
$27.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$2,210.000
|
$2,166.000
|
$2,300.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
20.000
|
$475.000
|
$300.000
|
$280.000
|
$300.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$575.000
|
$475.000
|
$545.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$700.000
|
$449.000
|
$545.000
|
$600.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
28.000
|
$125.000
|
$77.000
|
$75.000
|
$80.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
52,488.000
|
$0.200
|
$0.170
|
$0.170
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
300.000
|
$0.300
|
$0.310
|
$0.300
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
1.000
|
$50.000
|
$51.000
|
$50.000
|
$55.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(SYMBOL)
|
EA
|
1.000
|
$50.000
|
$51.000
|
$50.000
|
$55.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
1.000
|
$50.000
|
$82.000
|
$80.000
|
$90.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
6,180.000
|
$0.150
|
$0.180
|
$0.180
|
$0.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
100.000
|
$1.500
|
$1.000
|
$1.000
|
$1.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
21.000
|
$5.250
|
$6.000
|
$6.000
|
$6.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
1.000
|
$125.000
|
$153.000
|
$150.000
|
$160.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
1.000
|
$125.000
|
$184.000
|
$180.000
|
$200.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
2,060.000
|
$0.450
|
$0.560
|
$0.550
|
$0.600
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
8,308.000
|
$0.400
|
$0.510
|
$0.500
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
9,188.000
|
$0.400
|
$0.510
|
$0.500
|
$0.550
|
|
REFL PAV MRKR TY I-C
|
EA
|
5.000
|
$5.000
|
$4.000
|
$4.000
|
$4.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
295.000
|
$4.500
|
$4.000
|
$4.000
|
$4.250
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
19,556.000
|
$0.050
|
$0.040
|
$0.040
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
100.000
|
$0.050
|
$0.100
|
$0.100
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
21.000
|
$0.300
|
$0.260
|
$0.250
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
1.000
|
$6.000
|
$15.000
|
$15.000
|
$16.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
1.000
|
$6.000
|
$15.000
|
$15.000
|
$16.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
240.000
|
$50.000
|
$55.000
|
$60.000
|
$80.000
|
|
Totals: |
$1,447,452.750
|
$1,126,255.630
|
$1,167,908.375
|
$1,355,729.550
|